Ballyoughtragh South Commons , Farranmanagh Knocknaman and Lisheennashingane (Townlands) , Milltown County Kerry

Sep 22 2025

Application Received

Dec 19 2025

Further Info. Requested
  • Submitted: 22 / 09 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    N/A
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

REDIII: A 10 year planning permission for a solar farm, 38kV substation and underground cabling grid connection, and energy storage compound with a total area of circa 57 hectares. The proposed development will consist of a solar farm comprising of c.230,000 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 14 no. single storey electrical transformer stations. The energy storage compound will consist of 36 no. containerised energy storage modules and associated plant and equipment, 9 no. transformers and 2 no. auxiliary transformers, 2 no. spare parts containers and 1. no. office unit. Planning permission is also sought for 1 no. 38kV substation and associated electrical compound, including single storey control building, line bay, transformer and accompanying apparatus, and associated grid connection between the proposed substation and Oughtragh 110kV substation comprising 38kV underground electricity cabling of c.3.87km in length to be provided in an excavated trench on private lands and the L11003, L8003 and L80030 public roads, and all associated site development and reinstatement works. The project will also include 33kV underground interconnector electrical cabling within the development site and within the L11003 public road, temporary construction compounds, security fencing, CCTV, access tracks, landscaping (including hedgerow removal and planting), drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 6 no. entrances from the L11003 and L80030, with 1 no. of these entrances used for the temporary construction phase only. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found