300m |
26/04/2022 |
N/A |
113 Ardcullen , Hollyhill , Co.Cork |
Retention permission for development of this site at: 113 Ardcullen, Hollyhill, Co.Cork, T23H96V. The development consists of : Permission for the retention of (1) A singl... login required. |
Details... |
910m |
20/04/2022 |
N/A |
231 Blarney Street , Cork |
Permission for ground and first floor extensions and alterations to rear of existing two storey dwelling house with associated site works.... login required. |
Details... |
640m |
23/02/2022 |
CONDITIONAL |
Mile Stream , Shanakiel , Cork City |
Permission for the construction of a wastewater pumping station and associated site works on part of a site originally granted permission under Planning Reg. No.'s 16/37010 and 21/40555.... login required. |
Details... |
220m |
15/02/2022 |
CONDITIONAL |
Hollymount 2 , (The Former Banta Site) , Hollymount Industrial Estate |
Permission for the construction of a new substation building consisting of a medium voltage switchroom and electrical distribution room and all associated site development works.... login required. |
Details... |
920m |
01/12/2021 |
N/A |
Heather House , St. Marys Campus , Gurranabraher |
For retention permission and permission for development of this site at Heather House, St. Mary's Campus, Gurranabraher, Cork. The development consists of: The retention and completion of the existing... login required. |
Details... |
620m |
08/10/2021 |
CONDITIONAL |
Mile Stream , Shanakiel , Cork City |
Permission on a site located at Mile Stream, Shanakiel, Cork City. Planning permission is sought for the following, (1) Minor amendments to house typologies previously permitted under planning ref: 16/37010. The amendments will include minor internal... login required. |
Details... |
850m |
07/10/2021 |
CONDITIONAL |
Carraig Mor Centre , Shanakiel Road , Sundays Well |
Permission for demolition of single storey structure to north elevation; the construction of a single storey extension to north elevation; the construction of a single storey extension to south elevation; the construction of a two storey extension to south/east elevation; refurbishment of exis... login required. |
Details... |
640m |
15/09/2021 |
CONDITIONAL |
Mile Stream , Shanakiel , Cork City |
Permission for the following, (1) The demolition of 4 no. unfinished 2-storey semi-detached dwelling houses, (2) The construction of 4 no. 2 storey semi-detached dwelling houses (c... login required. |
Details... |
410m |
14/07/2021 |
CONDITIONAL |
Hollymount Industrial Estate , Blarney Road , Cork |
Permission for development to consist of 1010m2 (543 No) of roof mounted Solar PV panels and all associated works across 2 roofs... login required. |
Details... |
910m |
10/03/2021 |
REFUSED |
"The Arches" , Mount Desert , Clogheen (Old Blarney Road) |
Permission to construct 2 no. additional apartments for short term/holiday letting on my site together with the installation of a new wastewater treatment system and percolation Area, all associated site works including the provision of 27 car parking spaces to new extended site area... login required. |
Details... |
250m |
02/03/2021 |
CONDITIONAL |
The Former Banta Site , Hollymount Industrial Estate , Hollyhill |
Permission for modifications to the existing warehouse building and all ancillary site development works at the Former Banta site, Hollymount Industrial Estate, Hollyhill, Cork. The proposed development consists of a change of use of part of the existing warehouse building to use as a testing and measurement facility with ancillary office use and modifications to the building consisting of: the construction of a new mezzanine floor; and modifications to the façade including (1) New windows at first floor level, relocation of doors and opening... login required. |
Details... |
310m |
02/02/2021 |
CONDITIONAL |
Unit 8 , Hollyhill Industrial Estate , Hollyhill |
Permission is sought for the erection of
1. Lean-to and Roof Mounted Solar Panels to the South East Elevation of Existing Unit and associated service gantry.
2. New deck with perimeter railing to accommodate Geodome satellite receivers to Existing Roof of Existing Unit and associated site works.... login required. |
Details... |
790m |
02/02/2021 |
CONDITIONAL |
11 Riverview , Ard Sionnach , Shanakiel |
Permission to erect a two storey extension to the rear of an existing dwellinghouse, erect a detached single storey home office to the rear of an existing dwelling house and construct a bin store to the front of an existing dwellinghouse and all associated site works.... login required. |
Details... |
150m |
01/02/2021 |
CONDITIONAL |
Hollyhill Industrial Estate , Tadgh Barry Road , Holyhill |
Permission for alterations within the existing lower service yard consisting of the construction of a 110.5m2 single storey extension with a rooftop plant enclosure to an existing production building and all ancillary site development works.... login required. |
Details... |
880m |
08/12/2020 |
CONDITIONAL |
St. Marys Health Campus , Bakers Road , Gurranabraher |
Permission for change of use of an open green area to a horticultural site for training purposes and to erect perimeter fence and horticultural related structures.... login required. |
Details... |
670m |
07/10/2020 |
CONDITIONAL |
Mile Stream , Shankiel |
Permission to vary permitted residential development (granted under Reg .No. 16/37009 and P.L. 28.247708), by the substitution of 8 No. 4- bedroom bungalows (total floor area 1328 sqm0 with 16 No... login required. |
Details... |
980m |
21/10/2019 |
CONDITIONAL |
No.8 Oakdale , Briarscourt , Shanakiel |
Permission to (1) Demolish existing ground floor extension at the rear and existing porch at the front of existing dwelling. (2) Construct a ground floor extension at the front, rear and side of existing dwelling. (3) Construct a new boundary wall an... login required. |
Details... |
150m |
17/10/2019 |
CONDITIONAL |
Hollyhill Industrial Estate , Tadhg Barry Road , Hollyhill |
Permission for the construction of a new substation building within the existing car park to cater for additional electric car charging points at the Hollyhill Industrial Estate... login required. |
Details... |
120m |
17/10/2019 |
CONDITIONAL |
Hollyhill Industrial Estate , Tadhg Barry Road , Holyhill |
Permission for modifications to the elevation of an existing building and all ancillary site development works at Hollyhill Industrial Estate, Tadhg Barry Road, Holyhill, Cork. The proposed modifications consist of upgrades to the elevation of an existing office building i... login required. |
Details... |