Kilmore, Brinny, Innishannon, Co. Cork.

Aug 26 2026

Application Received
  • Submitted: 26 / 08 / 2026
  • Application Type:
    Permission
  • Application Status:
    Invalid - Case Closed
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

Permission for the construction of a 449.8msq (including 77.1msq Mezzanine) purpose-built operational infrastructure facility, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, and other construction materials and tools required soley in connection with the applicant's civil engineering and utility contracting business, a revised vehicular entrance and gate, internal circulation areas, parking and operational hard standing, 10m x 7m external storage area, storing Clause 804 and pipe grit for emergency use, associated surface water drainage infrastructure, waste water treatment system to serve wc and all other ancillary site development works.

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information: