Acres, Aghalinane, Ballyhalwick,Balteenbrack, Beha Behagh, Caher, Carhoon West, Castlelands, Derrycoo Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh Lissacroneen, Mallowgaton, Mishells, Murragh, Roug

Nov 09 2023

Application Received

Jan 12 2024

Decision Due
  • Submitted: 09 / 11 / 2023
  • Application Type:
    PERMISSION
  • Application Status:
    INCOMPLETED APPLICATION
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

The existing Bandon to Dunmanway 110 kV Overhead Line (OHL), which is approximately 26km long between the existing Bandon 110kV Substation in the townland of Mishells, Co. Cork (approximately 1km north of Bandon, Co. Cork) and the existing Dunmanway 110kV Substation in the townland of Ballyhalwick, Co. Cork (approximately 0.4km east of Dunmanway Co. Cork). The existing OHL is located in the townlands of Acres, Aghalinane, Ballyhalwick, Balteenbrack, Behagh, Caher, Carhoon West, Castlelands, Derrycool, Dromidiclogh, Dromidiclogh West, Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh East, Kilnacranagh West, Laragh, Lissacroneen, Mallowgaton, Mishells, Murragh, Roughgrove East, Roughgrove West, Sranaviddoge, Teadies Upper, Toom and Tullyglass, Co. Cork. Works associated with an uprate (refurbishment) of the existing Bandon to Dunmanway 110kv OHL, which consists of the : (i) replacement ("restringing") of the existing OHL conductor wires with a new higher capacity conductor including installation of a new fibre optic communication connection; (ii) replacement of 12 no. of the 13 no. existing steel towers including 11 no. angle masts (AM) and 1 no. end mast (EM) and their foundations with similar structures and member replacement at 1 no. EM. Any replacement AMs will be constructed at, or immediately adjacent to the existing structures that they will replace, with a height difference of between 0.5-1.5m; (iii) Replacement of 16 no. of the 127 no. existing intermediate Polesets (IMPs); with similar structures. Any replacement IMPs will be constructed in situ, with the exception of IMP128 which will be replaced at an offset of 10m. The height differences of the replacements will be 1m, with the exception of IMP113 and IMP115 which will be a 2m and 3m increase in height respectively, (iv) Carrying out of civil works for tower foundation strengthening at 1 no. location; (v) Replacement of hardware and fittings at all locations, including insulators, clamps, anti-climb guards, vibration dampers, and installation of new jumper arrangements, suspension weights, plump poles, pole bolts and anti-climb guards; (vi) replacement of a crossarm at 1 no. location; (vii) all associated works within the existing Dunmanway Substation to accommodate the uprated 110 kV OHL and all associated site development works including above and below the ground works to gain access to the existing structures including timber cutting and vegetation clearance, painting, renumbering of replac

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information: