Reenroe , Emlaghmore West , Ballinskelligs Co. Kerry

May 24 2024

Application Received

Jul 18 2024

Further Info. Requested

Dec 05 2024

Further Info. Received

Jul 02 2025

Decision

Jul 02 2025

Decision Due

Jul 29 2025

Appeal Submitted

Mar 11 2026

Appeal Decision
  • Submitted: 24 / 05 / 2024
  • Application Type:
    PERMISSION
  • Application Status:
    N/A
  • Council Decision:
    N/A (Unknown)

Useful Links:

Development Description:

DEVELOPMENT AT A 28.5.6HA SITE AT REENROE, EMLAGHMORE WEST, BALLINSKELLIGS, CO. KERRY. THE DEVELOPMENT WILL CONSIST Of AN INTEGRATED TOURISM/ LEISURE PARK FIRST COMPRISING OF THE PARTIAL DEMOLITION, EXTENSION AND REDEVELOPMENT OF THE EXISTING DERELICT HOTEL, TO INCLUDE; 4 NO. SELF-CATERING STUDIO APARTMENTS; 3 NO. ONE BED SELF-CATERING APARTMENT; 15 NO. TWO BEDS SELF-CATERING APARTMENTS; A BAR; DINING ROOM; ROOFTOP RESTAURANT; SHOP; ESB SUBSTATION AND SWITCH ROOMS; STANDBY GENERATOR ROOM, AND BIN STORES. THE REMAINDER OF THE PROPOSED DEVELOPMENT WILL INCLUDE THE FOLLOWING: 6 NO. HOBBIT HUTS, 21 NO. GLAMPING PODS, 25 NO. HOLIDAY HOMES, 144 NO. MOBILE HOMES, 20 NO. CAMPERVAN STANDS, 0.8HA TENT CAMPING AREA, WASHROOM AND TOILET FACILITIES 58M2, MAINTENANCE BUILDING 618M2, LEISURE COMPLEX (WITH A SWIMMING POOL) 1,339.5M2, SURF SHOP 191.7M2/CAFÉ 126.5M2, NATURAL PLAY AREA, CENTRAL PARK AREA, 151 NO. CAR PARKING SPACES, INCLUDING COACH PARKING, 40 NO. BICYCLE SPACES, EV CHARGING POINTS, INTERNAL ROADS, FOOTPATHS, WASTE STORAGE AREAS, WIDENING OF BEACH ACCESS ROAD TO 6M FOR TWO-WAY TRAFFIC INCLUDING A PEDESTRIAN/CYCLE PATHWAY, UPGRADING OF EXISTING CLIFF WALK, NEW ACCESS ROAD AND SERVICES LINES TO TWO NEIGHBOURING DWELLINGS TO THE SOUTHWEST OF THE DEVELOPMENT SITE, NEW WASTEWATER TREATMENT SYSTEM WITH CLEAR WATER PUMP STATION AND UV SYSTEM AND ASSOCIATED CONSTRUCTED INTEGRATED WETLAND, SITE DRAINAGE, 2 NO. STANDBY GENERATORS, WATER SERVICES AND LANDSCAPING. THE PROJECT INCLUDES ALL ANCILLARY AND ASSOCIATED WORKS NECESSARY TO FACILITATE THE DEVELOPMENT. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT AND ACCOMPANIES THIS APPLICATION.

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision: REFUSED
  • An Coimisiún Pleanála File Ref.: 323171
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found