1.6km |
14/03/2022 |
N/A |
Glenall , Borris-in-Ossory , Co. Laois |
develop 5 no. serviced sites for 5 no. detached dwelling houses. The proposed development will also include boundary treatments, lighting, connections to foul, surface water drainage & water services, landscaping and all associated infrastructure works and services on 0.3 Ha ... login required. |
Details... |
1.9km |
16/12/2021 |
CONDITIONAL |
Raheen , Borris in Ossory , Co. Laois |
construct a dormer bungalow dwelling, new site entrance, domestic garage, wastewater treatment system and all associated ancillary works... login required. |
Details... |
2.2km |
16/12/2021 |
N/A |
Kilmartin , Borris-in-Ossory , Portlaoise |
develop as follows: open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares ... login required. |
Details... |
2.4km |
14/12/2021 |
CONDITIONAL |
Shanboe , Borris-In-Ossory , Co. Laois |
construct single storey extension to the rear/south elevation of an existing single-storey dwelling house and to include all associated ancillary works... login required. |
Details... |
2.2km |
03/12/2021 |
N/A |
Kilmartin , Borris-in-Ossory , Portlaoise |
to open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares ... login required. |
Details... |
1.9km |
02/11/2021 |
N/A |
Raheen , Borris in Ossory , Co. Laois |
construct a dormer bungalow dwelling, new site entrance, domestic garage, wastewater treatment system and all associated ancillary works... login required. |
Details... |
980m |
15/10/2021 |
N/A |
Clononeen , Borris-In-Ossory , Co. Laois |
construct a dwelling house, domestic garage, wastewater treatment system, percolation area, bored well, new splayed entrance and associated site work... login required. |
Details... |
1.9km |
16/08/2021 |
CONDITIONAL |
Cloncourse , Borris-In-Ossory , Co. Laois |
construct dormer style dwelling house, septic tank and percolation area and all associated site works... login required. |
Details... |
1.8km |
25/06/2021 |
CONDITIONAL |
Site 39-40 , Glenall , Borris-In-Ossory |
retain an existing concrete ground slab and the proposed development of 2 no. semi-detached two storey dwelling houses and all associated site works... login required. |
Details... |
2.6km |
02/06/2021 |
CONDITIONAL |
Ballykelly , Roscrea , Co Tipperary |
shed to rear of site and all associated site works... login required. |
Details... |
1.8km |
31/05/2021 |
N/A |
Site 39 & 40 Glenall , Borris-in-Ossory , Co. Laois |
retain an existing ground slab and the proposed development of 2 no. semi-detached two storey dwelling houses and all associated site works... login required. |
Details... |
1.7km |
31/05/2021 |
CONDITIONAL |
Site 22 & 23 Glenall , Borris-in-Ossory , Co. Laois |
retain an existing ground slab and the proposed development of 2 no. semi-detached two storey dwelling houses and all associated site works... login required. |
Details... |
2.8km |
18/05/2021 |
CONDITIONAL |
Spafield , Ballykelly , Borris-in-Ossary |
construction of slatted shed with underground effluent tank and put roof over existing underground effluent tank feeding area and all associated site works (within the curtilage of a Protected Structure S50) and all associated site works... login required. |
Details... |
1.7km |
22/03/2021 |
N/A |
22-23 Glenall , Borris In Ossory , Co. Laois |
2 no semi-detached dwelling houses and all associated site works... login required. |
Details... |
1.7km |
22/03/2021 |
CONDITIONAL |
11 Glenall , Borris In Ossory , Co. Laois |
construct a 2 storey dwelling house and all associated site works... login required. |
Details... |
1.8km |
22/03/2021 |
N/A |
39-40 Glenall , Borris In Ossory , Co. Laois |
2 no semi-detached dwelling houses and all associated site works... login required. |
Details... |
1.7km |
22/03/2021 |
CONDITIONAL |
10 Glenall , Borris In Ossory , Co. Laois |
construct a 2 storey dwelling house and all associated site works... login required. |
Details... |
1.2km |
10/02/2021 |
CONDITIONAL |
Rock Road , Borris in Ossory , Portlaoise |
construct a maintenance shed and all associated site works... login required. |
Details... |
1.9km |
05/02/2021 |
CONDITIONAL |
Raheen , Ballaghmore , Borris-in-Ossory |
construct a proposed dormer dwelling house, garage, site entrance, wastewater treatment system & percolation area and to include all associated site works... login required. |
Details... |
1.3km |
03/02/2021 |
CONDITIONAL |
Curraghmore , Borris in Ossory , Co. Laois |
construct a wintering unit containing under ground tank, lie back area, concrete apron and all associated and necessary site works... login required. |
Details... |