1.6km |
31/03/2022 |
N/A |
Ballykeeffe , Raheen , Limerick |
a 10 year permission for the construction of 384no. residential units(202no. houses, 182no. apartments), creche and associated site works... login required. |
Details... |
910m |
25/03/2022 |
N/A |
13 Gurteen Gardens , Ballinacurra , Limerick |
a single storey front porch extension together with retention permission for extension to front, side and rear of originally permitted flat roofed garage (und... login required. |
Details... |
130m |
24/03/2022 |
N/A |
No. 1-B Lissamote , Ballykeefe Estate , Dooradoyle Limerick |
(a) the former garage to use a room and (b) the change of use of the ground floor of the dwelling to a doctors surgery and all associated site works... login required. |
Details... |
130m |
04/03/2022 |
N/A |
1 Dooradoyle Road , Limerick |
the demolition of existing single-storey dwelling and detached garage, and the construction of a new single-storey Orthodontic Clinic, to include onsite car parking and all ancillary works and services... login required. |
Details... |
680m |
25/02/2022 |
N/A |
No. 9 Gouldavoher Estate , Fr. Russell Rd , Limerick |
the demolition of a single-storey extension to the side & rear of the house, relocation of the vehicular driveway and ancillary site works... login required. |
Details... |
630m |
23/02/2022 |
N/A |
1 Greenpark Villas , Ballinacurra , Limerick |
the construction of a single storey Garage with a Canopy and Shed to the rear of dwelling house, widen the existing entrance and fit a new gate at the rear of the garden and all ancillary works... login required. |
Details... |
2.6km |
18/02/2022 |
N/A |
Ballycummin , The IDA Business & Technology Park , Raheen Co. Limerick |
10-year permission for development of a Biopharmaceutical Manufacturing Campus with an overall floor area of 47,384 sqm. Construction of a 4-storey Biopharmaceutical Manufacturing building approx. 18,534 sqm and 33 metres high with roof-mounted plant/equipment & solar panels. A 2-storey canteen, laboratory and administration building. A 2-storey Warehouse building. A single storey Central Utilities Plant (CUP) building including 5no. Boiler stacks. A 2-storey freezer building. A single storey maintenance building. Single storey pedestrian link with roof-mounted pipe rack. Provision of car parking spaces approx. 199, accessible car parking/motorcycle spaces, EV vehicle charging, dedicated car-pooling spaces/cycle parking. Visitor car park comprising 12no. car parking spaces. Single-storey Security building. Single storey Visitor Centre building. Single storey bicycle/shower facility building. A 38kv Substation compound consisting of single storey substation building. Step-down transformers and single storey Electrical Switchroom building enclosed by security fencing and a new vehicular entrance from Roches Avenue. Firewater and Supply Water pumphouse. Minor off-site underground works include extension of foul sewer to connect to ... login required. |
Details... |
590m |
14/02/2022 |
CONDITIONAL |
29 Gouldavoher Estate , Fr Russell Road , Co. Limerick |
construction of an extension to gable and rear of existing dwelling and retention permission to retain front porch extension, roof lights to front and rear of dwelling and widening of existing vehicular entrance and all associated site works... login required. |
Details... |
750m |
07/02/2022 |
N/A |
Community Intervention Centre & Occupational Health Department Building , St. Nessans Road , Dooradoyle Limerick |
extension and alterations to existing Community Intervention Centre and Occupational Health Department buildings to include for demolition of existing garage and prefabricated structures, single storey extension to Community Intervention Centre and Occupational Health Department building, elevational alterations and internal reconfigurations of... login required. |
Details... |
890m |
23/12/2021 |
CONDITIONAL |
25 Woodlawn Drive , Dooradoyle , Limerick |
the construction of a new living room and shower room to the rear of the property... login required. |
Details... |
1.8km |
23/12/2021 |
CONDITIONAL |
Skehacreggaun , Mungret , Co. Limerick |
the construction of two single storey extensions to an existing industrial unit... login required. |
Details... |
510m |
20/12/2021 |
N/A |
Belvedere , 4 Querrin Villas , Ballinacurra Road Limerick |
all works to the rear of the address as follows: the demolition of a single storey extension, the demolition of a dormer window to the rear, the modification of the existing vehicular entrance on South Circular Road, the construction of a new single storey extension to t... login required. |
Details... |
2.6km |
15/11/2021 |
CONDITIONAL |
Ballycummin , Ballycummin Road , Co. Limerick |
replacement of existing septic tank and percolation area with a waste water treatment system including revision of site boundaries from previously granted planning permissions ref. no. 81/20408 and 20/900 and all associated site works... login required. |
Details... |
870m |
29/10/2021 |
CONDITIONAL |
'The Bungalow' , Dooradoyle Road , Dooradoyle Limerick |
construction of a new garage to the side of the existing house, construction of a new single storey extension to the rear of the existing house, modifications to the size and fin... login required. |
Details... |
670m |
07/10/2021 |
N/A |
Former Greenpark Racecourse , Dock Road , Limerick |
Application - Construction of 371 residential units, proposed access road and two storey childcare facility... login required. |
Details... |
960m |
06/10/2021 |
CONDITIONAL |
93 Ballinacurra Gardens , Limerick |
the widening of the front driveway access point and hard surface area to front of the building house. Permission is sought for carrying out alterations to existing wheelchair ramp to comply with Building Regulations and for the provision of a drainage channel and soakpit... login required. |
Details... |
1.8km |
24/09/2021 |
CONDITIONAL |
Skehacreggaun , Mungret , Co. Limerick. |
(a) the installation of solar panels on the roof of the building and associated works, (b) the construction of a single storey extension to the north of the building ... login required. |
Details... |
2.1km |
23/09/2021 |
CONDITIONAL |
Skehacreggaun , Mungret , Co. Limerick |
modifying a recently permitted scheme under reg. no. 20/1114. The modification results in a net reduction of 6 units on the wider site as permitted under ref. no. 20/1114 (91 units proposed as opposed to 97 units) and consists of: replace 21 no. duplex units. Blocks type 5a and type 5b and with 4 no.1 bed apartments (nos 42-45) and 12 no. houses (nos 33-41, 46-48), replace 4 no. semi-detached units with 4 no. detached units along the west... login required. |
Details... |
530m |
03/09/2021 |
CONDITIONAL |
4 St. Nessans Park , Dooradoyle , Limerick |
the change of use of a portion of ground floor of a dwelling house from use as an osteopathy consulting room to use as a Hospital Doctor's consulting room, demolition of the existing domestic garage and the construction of a new porch to the side of the dwelling... login required. |
Details... |
40m |
01/09/2021 |
CONDITIONAL |
McDonalds Restaurant , The Crescent Shopping Centre , Dooradoyle Road Limerick |
amendment to the existing Drive Thru layout with the addition of new raised paved traffic island which will result in the creation of 2 no. lane arrangement with an additional customer ordering point, re-location of existing signage, reduction in size of the existing corral along the eastern elevation from 20 sq m to 18 sq m to facilitate the new drive thru arrangement and the provision of new and relocated drive thru signage, structures and road markings. the development will also include the provision of 2 no. new glazed Drive Thru booth ... login required. |
Details... |