2.8km |
01/04/2022 |
N/A |
Garrykennedy , Nenagh , Co Tipperary |
a dwelling house, garage, waste water treatment system & entrance along with all ancillary site works... login required. |
Details... |
2.9km |
08/02/2022 |
CONDITIONAL |
Garrykennedy , Co Tipperary |
a) refurbishment/alterations to existing single storey detached dwelling, b) new single storey extensions to side North-West/South-East and rear South-West elevations of existing dwelling, c) all associated site works/services... login required. |
Details... |
2.9km |
16/11/2021 |
CONDITIONAL |
Carrow , Ballycommon , Co Tipperary |
construction of a new dwelling house, new sewage treatment system and percolation area, bored well and site entrance and ancillary site works ... login required. |
Details... |
2.3km |
12/11/2021 |
REFUSED |
Garranmore , Newtown , Nenagh |
construct a single storey dwellinghouse, domestic garage, waste water treatment system, entrance and all ancillary site works (previous planning ref 17600158)... login required. |
Details... |
1.7km |
29/10/2021 |
CONDITIONAL |
Carrowbane , Newtown , Nenagh |
pedestrian bridge crossing over the Youghal River... login required. |
Details... |
2.2km |
21/10/2021 |
CONDITIONAL |
Garranmore , Newtown , Nenagh |
to construct a dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works... login required. |
Details... |
1.7km |
13/10/2021 |
N/A |
Carrowbane , Newtown , Nenagh |
pedestrian bridge crossing over the Youghal River... login required. |
Details... |
2.7km |
22/09/2021 |
CONDITIONAL |
Garrykennedy , Portroe , Nenagh |
construction of a detached two storey dwelling with new site entrance, waste-water treatment system, boundary walls and ancillary site development works on a site that adjoins a protected structure (RPS 561)... login required. |
Details... |
2.9km |
09/08/2021 |
CONDITIONAL |
Cushmona , Dromineer , Nenagh |
to construct an extension to rear of existing dwelling, demolish existing garage and construct a new garage and carry out all other associated ancillary site works... login required. |
Details... |
2.7km |
21/07/2021 |
N/A |
Garrykennedy , Portroe , Nenagh |
construction of a detached two-storey dwelling with new site entrance, waste-water treatment system, boundary walls, garage and ancillary site development works... login required. |
Details... |
2.9km |
21/07/2021 |
N/A |
Cushmona , Dromineer , Nenagh |
to construct an extension to rear of existing dwelling, demolish existing garage and construct a new garage and carry out all other ancillary site works... login required. |
Details... |
3km |
11/06/2021 |
N/A |
Cushmona , Ballycommon , Co. Tipperary |
construction of a new dwelling house, waste-water treatment system and percolation area, entrance and all ancillary site works... login required. |
Details... |
2.9km |
28/05/2021 |
CONDITIONAL |
Dromineer , Nenagh , Co Tipperary |
provision of demountable jib crane with capacity 2 ton SWL (Safe Working Load) which will be located adjacent to the slipway in existing private members harbour - use will be to 1. ... login required. |
Details... |
2.8km |
14/05/2021 |
CONDITIONAL |
Cushmona , Dromineer , Nenagh Co. Tipperary |
renovation and extension of existing house and installation of a new waste water treatment system along with all ancillary site works... login required. |
Details... |
1.6km |
07/05/2021 |
N/A |
Shannonvale , Dromineer , Nenagh Co. Tipperary |
to re-roof existing garage and fuel store to include: replacement of existing flat/lean-to roofs of the garage and fuel store with a pitch roof to both, wa... login required. |
Details... |
1.6km |
14/04/2021 |
N/A |
Shannonvale , Dromineer , Nenagh |
replacement of the existing flat/lean-to roofs of the garage and fuel store with a pitch roof to both, wall plate to garage shed to be increased, minor material and fenestration reconfigurations, all along with associated landscaping, ancillary and site works... login required. |
Details... |
2.2km |
09/04/2021 |
CONDITIONAL |
Ballyvaughan , Portroe , Nenagh Co. Tipperary |
construction of a vehicular entrance off existing private roadway, single storey dwelling house, domestic waste water treatment plant with polishing filter together with all associated site works... login required. |
Details... |
2.4km |
25/03/2021 |
CONDITIONAL |
Garranemore , Portroe , Nenagh |
the construction of a vehicular entrance off existing private roadway, dwelling house, domestic waste water treatment plant with polishing filter together with all associated site works... login required. |
Details... |
2.9km |
16/03/2021 |
N/A |
Dromineer , Nenagh , Co Tipperary |
provision of demountable jib crane with capacity 2 ton SWL (Safe Working Load). This crane will be located adjacent to the slipway in existing private members harbour. Its use will ... login required. |
Details... |
2.2km |
03/03/2021 |
CONDITIONAL |
Dromineer , Co. Tipperary |
a) proposed new part dormer, part single storey dwelling, b) proposed treatment system, percolation area, c) proposed new single storey garage, d) proposed new entrance from public road and e) all associated site works/services... login required. |
Details... |