610m |
02/03/2022 |
CONDITIONAL |
BANAGHER , CARROWMORE LACKAN , BALLINA |
CONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DETACHED DOMESTIC GARAGE/SHED INCLUDING ALL ANCILLARY SITE WORKS... login required. |
Details... |
1km |
21/02/2022 |
N/A |
BALLINLENA , CARROWMORE-LACKEN , BALLINA |
RETAIN EXISTING DOMESTIC GARAGE, EXISTING GROUND FLOOR AND FIRST FLOOR EXTENSION TO THE SOUTHEAST ELEVATION OF THE B & B, REVISED SITE BOUNDARIES FROM PREVIOUS PL REF P00/1901 AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.2km |
19/01/2022 |
N/A |
CARROWSTEELAGH , CARROWMORE LACKEN |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS... login required. |
Details... |
1.2km |
09/12/2021 |
N/A |
CARROWSTEELAGH , CARROWMORE LACKEN , BALLINA |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS ... login required. |
Details... |
2.3km |
28/10/2021 |
CONDITIONAL |
FOGHILL , CARROWMORE LACKEN , BALLINA |
REPLACE EXISTING DERELICT DWELLING WITH NEW DWELLING HOUSE, AND TO CONSTRUCT GRAGE, INSTALL EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA, CARRY OUT ALL ASSOCIATED ANCILLARY SITE WORKS... login required. |
Details... |
1.5km |
06/10/2021 |
REFUSED |
CARROWSTEELAGH , CARROWMORE LACKEN , CO. MAYO |
DEMOLITION OF THE EXISTING DWELLING HOUSE AND EXISTING SHED, CONSTRUCTION OF A REPLACEMENT DETACHED DWELLING HOUSE AND A DOMESTIC SHED, TOGETHER WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
750m |
28/09/2021 |
CONDITIONAL |
BALLINLEENA , CARROWMORE LACKEN , BALLINA |
EXTEND AND RECONSTRUCT DWELLING HOUSE... login required. |
Details... |
900m |
07/04/2021 |
CONDITIONAL |
BALLINLENA , CARROWMORE-LACKEN , CO. MAYO |
FULL PLANNING PERMISSION FOR CONSTRUCTION OF A SIDE EXTENSION TO THE EXISTING DWELLING HOUSE, ALTERATIONS TO THE EXISTING DWELLING, TOGETHER WITH ALTERATIONS OF FENESTRATION TO ALL ELEVATIONS AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.6km |
03/02/2021 |
N/A |
RATHFRAN , CARROWMORE LACKEN |
RETENTION OF EXISTING SHEDS, ALTERATIONS TO SITE BOUNDARIES FROM PREVIOUS PLANNING P05/1634, ALTERATIONS TO EXISTING DWELLING HOUSE TO INCLUDE GROUND AND FIRST FLOOR EXTENSION TO THE FRONT (SOUTH) ELEVATION, ALTERATIONS TO ALL ELEVATIONS AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
07/09/2020 |
CONDITIONAL |
TOOREEN , CARROWMORE LACKAN , BALLINA |
RETAIN SLATTED HOUSE WITH MILKING PARLOUR 401SQM.... login required. |
Details... |
1.9km |
02/09/2020 |
CONDITIONAL |
CASHEL , CARROWMORE LACKEN , BALLINA |
CONSTRUCT DWELLING HOUSE AND DOMESTIC SHED WITH WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS.... login required. |
Details... |
560m |
11/08/2020 |
CONDITIONAL |
BANAGHER , CARROWMORE LACKAN , BALLINA |
RETAIN DOMESTIC DWELLING HOUSE, SEPTIC TANK AND DOMESTIC GARAGE/ PERMISSION TO UPGRADE THE EXISTING SEPTIC TANK SYSTEM TO INCLUDE NEW PUMPING CHAMBER AND PERCOLATION AREA.... login required. |
Details... |
2.7km |
22/06/2020 |
CONDITIONAL |
TOOREEN , CARROWMORE LACKEN , BALLINA |
RETAIN DWELLING HOUSE, DOMESTIC SHED AND TO UPGRADE SEPTIC TANK SYSTEM TO PROPRIETARY EFFLUENT TREATMENT SYSTEM... login required. |
Details... |
1.5km |
26/09/2019 |
CONDITIONAL |
CASHEL , CARROWMORE LACKEN , BALLINA |
RETAIN AND COMPLETE DWELLING HOUSE WITH SEPTIC TANK AND PERCOLATION AREA AS PREVIOUSLY GRANTED UNDER P11/131 TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES... login required. |
Details... |
2.4km |
02/09/2019 |
CONDITIONAL |
RATHFARN , CARROWMORE LACKEN , BALLINA |
CONSTRUCT LOOSE HOUSE WITH CUBICLES AND SLATTED SHED WITH LOOSE HOUSE AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.1km |
15/02/2019 |
CONDITIONAL |
BALLINLENA , CARRAMORE LACKEN , BALLINA |
CONSTRUCT AGRICULTURAL SHED (192SQM) FOR THE STORAGE OF MACHINERY, FODDER AND TO PROVIDE WINTERING FACILITIES FOR SHEEP AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.9km |
06/02/2019 |
CONDITIONAL |
FOGHILL , CARROWMORE , LACKEN |
RETAIN DWELLING HOUSE WITH SEPTIC TANK AND PERCOLATION AREA AND A SHED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES... login required. |
Details... |