Skip to main content
Our Subscriber Plan is now 50% off Discount expires on Wednesday, 03 June 2026. Get in touch about our Business Accounts and generate a free test alert.

PlanningAlerts.ie includes information on over 400,000 planning across Ireland over the past 10 years. In this link we identify the "wind farms" and "turbines" that were included in planning applications across the country over the past 10 years.


Wind Farm & Turbine Planning Applications

PlanningAlerts.ie includes information on over 400,000 planning across Ireland since 2010. Using this valuable information, it is possible to extract keywords on various planning trends across the country. In this case, we focused on the location of all planning applications that include keywords relating to wind energy. The keywords we selected for this study include "wind farm" and "turbine". 

Take a look at the locations of these planning applications in relation to their decision status and location on the map. You can tap on any planning application to view the planning application file on PlanningAlerts.ie. 

Sign up for a business account

Summary of 181 Windfarm / Turbine planning applications:

  • Granted Applications: 56
  • Refused Applications: 20
  • Other Statuses / Pending: 105
Received: Address: Development: Further Details:
20/05/2026 Ulster
(full address available after signup)
(1) ERECTION OF THREE 4.5 MEGAWATTS (MW) WIND TURBINES WITH A BLADE TIP HEIGHT OF 150M CONSISTING OF A ROTOR DIAMETER OF 136M AND A HUB HEIGHT OF 82M, (2) ERECTION OF ONE 4.2 MEGAWATTS (MW) WIND TURBINE WITH A BLADE TIP HEIGHT OF 135M CONSISTING OF A ROTOR DIAMETER OF 117M AND A HUB HEIGHT OF 76.5M, (3) CONSTRUCTION OF TURBINE FOUNDATIONS, CRANE HARDSTAND AREAS AND ASSEMBLY AREAS, (4) CONSTRUCTION OF 1 NO. PERMANENT 38KV ELECTRICAL ONSITE SUBSTATION AND CONTROL... Read more
20/05/2026 Connaught
(full address available after signup)
We, Cunlaghfadda Green Energy Limited, intend to apply for a ten-year planning permission for development in the townlands of Knockroe, Cunlaghfadda, Harefield, Cloonbaul and Knockaunakill, County Mayo. The development will comprise the provision of a renewable energy development consisting of the following: i. 7 no. wind TURBINEs with a top of foundation to blade tip height of 160 metres; a rotor blade diameter of 136 metres; and hub height of 92 metres,1 no. meteorological mast with a height of 92 metres and subsequent decommissioning of the wind TU... Read more
15/05/2026 Leinster
(full address available after signup)
for construction of a Single Wind TURBINE development on a 5.98-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind TURBINE with an overall tip height of 150 metres, comprising a rotor diameter of 138m and a hub height 81m; II. Wind TURBINE foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrading and repositioning of existing farm entrance; V. Upgrading and widening of existing access track; V... Read more
01/05/2026 Leinster
(full address available after signup)
for the construction of a Single Wind TURBINE development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind TURBINE with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind TURBINE foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new Read more
01/05/2026 Ulster
(full address available after signup)
DEVELOPMENT ON LANDS WITHIN AND ADJOINING THE PERMITTED LETTERGULL WIND FARM (PLANNING REF. NO. 18/50156, ACP REF. 304685-19) WHICH WILL COMPRISE OF THE PROVISION OF A RENEWABLE ENERGY DEVELOPMENT CONSISTING OF THE FOLLOWING: (1) 1 NO. WIND TURBINE WITH AN OVERALL BLADE TIP HEIGHT OF 135M, ROTOR DIAMETER OF 115M, AND A HUB HEIGHT OF 77.5M, (2) TURBINE FOUNDATION AND ASSOCIATED HARD-STANDING AREAS, (3) TEMPORARY WORKS TO THE EXISTING LETTERGULL Read more
24/04/2026 Leinster
(full address available after signup)
We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind TURBINE development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind TURBINE with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind TURBINE foun... Read more
21/04/2026 Ulster
(full address available after signup)
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WE... Read more
17/04/2026 Connaught
(full address available after signup)
The Planning Application is subject to Section 34D of the Planning and Development Act 2000 (as amended) and in accordance with Article 16(2) of the Renewable Energy Directive III (Directive 2023/2413) i.e. Completeness Check. Permission for a 10 year planning permission for the proposed development of a WIND FARM on a site area of 27.4 hectares in the townlands of Townlands of Carrowkeel, Longfield, Kilmass, Grange, Rahara, Co. Roscommon. The proposed development for which permission is sought will comprise: • Four (4) wind TURBINEs with an overall... Read more
16/04/2026 Ulster
(full address available after signup)
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WE... Read more
08/04/2026 Connaught
(full address available after signup)
An amendment to the previously granted a wind TURBINE (p21/881) to increase the hub height to 99m of an operation lifespan of 30 years from commissioning. The development will consist of one wind TURBINE with a tip height of approximately 169 metres, control building, site access road (approximately 240m), hardstand areas, underground cabling and all ancillary site works.... Read more
31/03/2026 Munster
(full address available after signup)
for the development of the Slievenalicka wind TURBINE in the townlands of Tooreen, Slievenalicka, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 1 wind TURBINE with a maximum overall blade tip height of 150m. • Construction of associated TURBINE foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-si... Read more
26/03/2026 Munster
(full address available after signup)
the development will consist of: • Erection of no. 2 wind TURBINEs with a tip height of 120m. The wind TURBINEs will have a rotor diameter of 82m and a hub height of 79m. • Upgrade of existing access tracks and construction of new permanent access tracks, permanent TURBINE hardstand areas and TURBINE foundations. • Installation of a site drainage network including se... Read more
25/03/2026 Connaught
(full address available after signup)
An amendment to the previously granted a wind TURBINE (p21/881) to increase the hub height to 99m of an operation lifespan of 30 years from commissioning. The development will consist of one wind TURBINE with a tip height of approximately 169 metres, control building, site access road (approximately 240m), hardstand areas, underground cabling and all ancillary site works.... Read more
09/03/2026 Munster
(full address available after signup)
the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind TURBINEs within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. TURBINEs previously authorized in 2022 under reference 309412-21). The TURBINE rotor diameter size within the range 133m to 138m inclusive; Read more
27/02/2026 Munster
(full address available after signup)
Notice for Renewable Energy Directive III (RED III) Development - 10 year Permission for development of a Long Duration Energy Storage (LDES) facility at this site within the townland of Athea Upper, Athea, Co. Limerick. The development will consist of: (a) removal of selected items of existing grid support equipment and plant at the Kilathmoy WIND FARM substation (2 no battery containers and associated inverters, transformers and HVAC units, diesel generator and associated diesel tank, pre-fabricated electrical containers, sections of compound security fencing), and (b) construction of a Long Duration Energy Storage (LDES) facility containi... Read more
23/01/2026 Leinster
(full address available after signup)
the continued use of an existing guyed wind monitoring mast, with instruments, 100m in height on its lands at Garryhinch Bog, Clonyhurk, Co. Offaly for a further period of one year. The purpose of the mast is to assess the suitability of the company’s adjacent lands for WIND FARM development. Previous planning application reference numbers: PL2/16/399 and PL2/22/524... Read more
23/12/2025 Connaught
(full address available after signup)
to extend wind TURBINE testing & research site to rear of existing factory (previously granted under planning permission ref. number 13/1242) to include the following: 24 no. 20-30kw wind TURBINEs (maximum height is 30.100 meters), includes 2 no. TURBINEs in upper test site (previously granted under planning permission ref. no. 20/101), all other ancillary site works... Read more
22/12/2025 Munster
(full address available after signup)
The proposed development includes for the upgrade of the existing Mallow WTP to bring it into compliance with Uisce Éireann technical guidance documents with regards the coagulation, flocculation & clarification (CFC), filtration, chemical storage & dosing and residuals treatment processes. In addition, as part of the upgrade works it is proposed to increase the capacity of the WTP from 4,754m3/day to 5,042m3/ 22 hours. The development will consist/consists of the following: • Upgrade of the existing CFC process, including for the following: o Construction of a new flash mixing chamber with vertical TURBINE paddle; o Construction of a 3 no. c... Read more
19/12/2025 Munster
(full address available after signup)
six (6) wind TURBINEs with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind TURBINEs and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-... Read more
19/12/2025 Munster
(full address available after signup)
EDF Renewables Ireland Limited intend to apply for a 10 Year Permission for development at this site of c. 1.29 ha, located on lands at Littlesilver, Bandon, Co. Cork. The proposed development consists of a battery energy storage system (BESS) facility, which will comprise of rechargeable battery units contained within 28 no. c. 25 ft containers on site; 7 no. MVs units; 1 no. auxiliary transformer; a resistor, reactor and harmonic filter unit; a low voltage (LV) building and a welfare and spares container. The proposed development also involves the diversion of the existing overhead line on site and includes an underground cable, which will connect the BESS facility to the Bandon 110kV substation. The proposed development will include for ... Read more
12/12/2025 Munster
(full address available after signup)
the proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg WIND FARM (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Gen... Read more
12/12/2025 Leinster
(full address available after signup)
continued use of an existing guyed wind monitoring mast, with instruments, 100m in height on its lands at Garryhinch Bog, Clonyhurk, Co. Offaly for a further period of one year. The purpose of the mast is to assess the suitability of the company’s adjacent lands for WIND FARM development. Previous planning application reference numbers: PL2/16/399 and PL2/22/524... Read more
10/12/2025 Connaught
(full address available after signup)
(10 mbliana) chun leasuithe ar Chomhdhlúthadán Sioncrónach na nArd-doiriú atá ceadaithe (Uimhir Thagartha Chomhairle Contae na Gaillimhe 23/60641, 24/61485 agus 25/60575) lena n-áirítear lorg coise méadaithe ar an gcampún tógála sealadach, áiseanna foirne le dabhach coinneála fuíolluisce faoi thalamh, nasc cáblaí faoi thalamh athbhreithnithe go dtí an gcampún leictreach 110kV, lorg coise athbhreithnithe ar an gcampún leictreach 110kV, fálú imlíne athbhreithnithe, foirgneamh rialaithe amháin breise le háiseanna leasa agus dabhach coinneála fuíolluisce faoi thalamh, gléasra agus fearas leictreach gaolmhar agus nasc cáblaí faoi thalamh 110kV athbhreithnithe leis an bhfostáisiún Chnoc Raithní atá ann cheana féin. Leasuithe ar nasc eangaí Feirm ... Read more
02/12/2025 Ulster
(full address available after signup)
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAIN... Read more
25/11/2025 Ulster
(full address available after signup)
permission to erect a 850 kW wind TURBINE located in the northern area of our existing plant, with a hub height of 65 metres and a blade radius of 26 metres, together with underground ducting connecting to the existing ESB substation and all associated site works. A Natura Impact Assessment (NIS) will be submitted to the Planning Authority in connection with the application described above ... Read more
24/11/2025 Ulster
(full address available after signup)
permission for realignment of access and form sight distance of 49m to the southeast direction of junction 2 – LS6210 at Drumlins Park WIND FARM relating to the previously approved development under planning reference number 19/486. The remaining sightlines at this junction will provide a sight distance of 70m as required under condition 5(l) of the consented development ... Read more
18/11/2025 Munster
(full address available after signup)
a renewable energy development with a total capacity of 4.6MW at Moanbrack and Rathnameneenagh Co. Waterford. The development will consist of: • Erection of no. 2 wind TURBINEs with a tip height of 120m. The wind TURBINEs will have a rotor diameter of 82m and a hub height of 79m. • Upgrade of existing access tracks and construction of new permanent access tracks, permanent TURBINE hardstand areas and Read more
06/11/2025 Munster
(full address available after signup)
Permission for a period of 10 years for development of this site. The proposed development will consist of the provision of the following: I. 3 no. wind TURBINEs with an overall TURBINE tip height of 156.5 metres; a rotor blade diameter of 133 metres; and hub height of 90 metres, and associated foundations, hard-standing and assembly areas; II. Continued use of the existing onsite 38kV substation and associated 38kV underground cabling (built under Cork County Council Ref. No. 00/6590 / An Coimisiún Pleanála Ref. No. 04.127297); III. A meteorological mas... Read more
31/10/2025 Munster
(full address available after signup)
for development at this site measuring c. 1.42 Ha located within the townland of Booltiagh, Ennis, Co. Clare. The development seeks to amend the Battery Energy Storage System (BESS) development permitted under ref. 23/60414 and the existing permanent 110kV Booltiagh Substation permitted under ref. 00/567 (ACP ref. 120616) amended by ref. 11/340, which are both co-located with the existing and operational Booltiagh WIND FARM. There are no proposed amendments to the permitted and operational WIND FARM. The amendments to the permitted BESS will consist of t... Read more
25/10/2025 Munster
(full address available after signup)
a renewable energy project with a total capacity of 4.6MW This development will consist of:A) Erection of no. 2 wind TURBINEs with a tip height of 120m. The wind TURBINEs will have a rotor diameter of 82m and a hub height of 79m B)Upgrade of existing access tracks and construction of new permanent access tracks, permanent TURBINE hardstand areas and TURBINE found... Read more
24/10/2025 Ulster
(full address available after signup)
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAIN... Read more
24/10/2025 Leinster
(full address available after signup)
continued use of an existing guyed wind monitoring mast, with instruments, 100m in height for a further period of one year. The purpose of the mast is to assess the suitability of the company’s adjacent lands for WIND FARM development. Previous planning application reference numbers: PL19/176... Read more
22/10/2025 Leinster
(full address available after signup)
The proposed development is for the installation of a micro-wind TURBINE outside... Read more
09/10/2025 Munster
(full address available after signup)
Works relating to the TURBINE Delivery Route for the consented Knockroe WIND FARM (ACP Ref: 315176). The works will take place in the townlands of Ballaghoge (Ballagroge), Ballycullin, Ballydavid, Ballyduggan, Ballyhomuck, Ballywalter, Cappaghmore, Cappoge, Grangemockler, Gurteen (Bryan), Kilburry East, Kilburry West, Kilnagranagh, Kilvemnon, Mullinoly and Ninemilehouse, County Tipperary. The proposed development will consist of temporary road widening works, the construction of temporary sections of stoned tracks and other associated accommodation w... Read more
07/10/2025 Ulster
(full address available after signup)
10-Year planning permission for development. The development will consist of the construction of a Single TURBINE WIND FARM development on a 7.64-hectare site consisting of:- a) A single 4.8-megawatt (MW) wind TURBINE with an overall tip height of 143.8 metres, comprising a rotor diameter of 133.2m and a hub height 78m;b) Wind TURBINE foundation, crane hardstanding ... Read more
02/10/2025 Munster
(full address available after signup)
six (6) wind TURBINEs with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind TURBINEs and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-... Read more
01/10/2025 Ulster
(full address available after signup)
for a minor amendment to planning ref: 23/60009 relating to the permitted substation compound at Tullyhaw, Ballyconnell, County Cavan We are seeking a minor amendment to: • (A) the site substation, and • (B) the temporary site compound. Please see appendix for site location maps and drawings Substation relocation is required because: • The original location conflicts with TURBINE delivery vehicle swept paths and access gradients as identified during detailed design. • Significant additional fill would be required to match road levels and overcome existing site contours and drainage constraints. • The new position avoids a deep field drain, provi... Read more
30/09/2025 Ulster
(full address available after signup)
10-Year planning permission for development which will consist of the construction of a Single TURBINE WIND FARM development on a 7.64-hectare site consisting of:- a) A single 4.8-megawatt (MW) wind TURBINE with an overall tip height of 143.8 metres, comprising a rotor diameter of 133.2m and a hub height 78m; b) Wind TURBINE foundation, crane hardstanding and assemb... Read more
29/09/2025 Connaught
(full address available after signup)
for a period of 10 years for a development consisting of the provision of the following: i. 8 no. wind TURBINEs with an overall TURBINE total tip height range of 178m - 185m, a rotor diameter range of 149m - 163m, and TURBINE hub height range of 101m - 104m, and associated foundations and hard standing areas; ii. A permanent 38kV substation compound (including a control building (157.6 sqm) with welfare facilities, all associated electrical plant and apparatus,... Read more
29/09/2025 Munster
(full address available after signup)
Permission for a windfarm development at this site within the townland of Derrenacrinnig West. The proposed Grid Connection traverses the townlands of Derreenacrinnig West, Barnagowlane West, Glanareagh, Gortnacowly, Ards Beg, Ardrah, Laharanshermeen, Maulraha, Maulikeeve, Derryarkane, Cappanaboul, Skahanagh, Gortroe, Shandrum Beg, Shandrum More, Dromloughlin, Ballylickey, Crossoge. Temporary works will be required to accommodate the delivery of the TURBINE components. These temporary works are included as part of this application and are located in the townlands of Castledonovan, Derreenacrinnig East, and Derreenacrinnig West. The development ... Read more
29/09/2025 Munster
(full address available after signup)
The development will consist of: The extension of the operational duration of the existing Coomatallin WIND FARM and associated infrastructure (as permitted pursuant to Cork County Council Planning Register Reference 00/6380) for a further period of 20 years from the date of the expiry of its current operational duration. No changes are proposed to the number or dimensions of the existing permitted wind TURBINEs. The existing WIND FARM comprises: (i) 4 no. wi... Read more
24/09/2025 Ulster
(full address available after signup)
10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACK... Read more
23/09/2025 Munster
(full address available after signup)
works relating to the TURBINE Delivery Route for the consented Knockroe WIND FARM (ACP Ref: 315176). The works will take place in the townlands of Ballagroge, Ballycullin, Ballyduggan, Ballyhomuck, Ballywalter, Cappaghmore, Cappoge, Grangemockler, Gurteen (Bryan), Kilburry East, Kilburry West, Kilnagranagh, Kilvemnon, Mullinoly and Ninemilehouse, County Tipperary. The proposed development will consist of temporary road widening works, the construction of temporary sections of stoned tracks and other associated accommodation works at the locations noted ... Read more
19/09/2025 Munster
(full address available after signup)
for the development at this site in the townlands of Slievenalicka, Illaunbaun, Drumbaun and Lackamore (although no infrastructure will be sited within Lackamore townland), Co. Clare. The development will consist of: • Construction of 1 wind TURBINE with a maximum overall blade tip height of 150m. • Construction of associated TURBINE foundation, crane pad hardstand and assembly area. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencin... Read more
15/09/2025 Munster
(full address available after signup)
Permission for a period of 10 years for development of this site. The proposed development will consist of the with an overall TURBINE tip height of 156.5 metres; a rotor blade diameter of 133 metres; and hub height of 90 metres, and associated foundations, hard-standing and assembly areas; II. Continued use of the existing onsite 38kV substation and associated 38kV underground cabling (built under Cork County Council Ref. No. 00/6590 / An Coimisiún Pleanála Ref. No. 04.127297); III. A meteorological mast with a height of 30 metres above ground and associated foundation and hard-standing area; IV. All associated underground electrical and communic... Read more
15/09/2025 Connaught
(full address available after signup)
Permission for development consisting of: • The construction and operation of a WIND FARM consisting of six wind TURBINEs; • The TURBINE specification is unconfirmed but will fall within the parameter range outlined by Roscommon County Council and will be one of the following three Options; - Technology Option 1: tip height of 160m, rotor diameter of 136m and hub height of 92m; or - Technology Option 2: tip height of 156m, rotor diamete... Read more
15/09/2025 Connaught
(full address available after signup)
(i) The decommissioning and removal from site of 2 no. existing wind TURBINEs and associated ancillary infrastructure permitted pursuant to Leitrim County Council Planning Register Reference 95/12501; and (ii) the installation of 1 no. wind TURBINE with an overall tip height of 125 metres, TURBINE foundation, hardstanding area, underground electrical and communications cabling to the existing electrical switchroom, and all associated site development, access an... Read more
10/09/2025 Leinster
(full address available after signup)
the proposed amendments include: 1) Removal of the gas TURBINE buildings housing the approved OCGT units ( TURBINEs, generators and auxiliary equipment). The OCGT units will remain in place; 2) Addition of FinFan cooler unit and associated plant; 3) Revised Water Treatment Plant (‘WTP’) design and layout, incorporating: Replacement of de-ionising building with modular demineralised water plant; Addition of air compressor container, waste water and oily water collection sumps, and chemical dosing skid; Revised position for chemical storage area and bund; ... Read more
08/09/2025 Munster
(full address available after signup)
Permission for a windfarm development at this site within the townland of Derrenacrinnig West. The proposed Grid Connection traverses the townlands of Derreenacrinnig West, Barnagowlane West, Glanareagh, Gortnacowly, Ards Beg, Ardrah, Laharanshermeen, Maulraha, Maulikeeve, Derryarkane, Cappanaboul, Skahanagh, Gortroe, Shandrum Beg, Shandrum More, Dromloughlin, Ballylickey, Crossoge. Temporary works will be required to accommodate the delivery of the TURBINE components. These temporary works are included as part of this application and are located in the townlands of Castledonovan, Derreenacrinnig East, and Derreenacrinnig West. The development ... Read more
02/09/2025 Munster
(full address available after signup)
WE, TAURBEG LIMITED, INTEND TO APPLY FOR PERMISSION FOR DEVELOPMENT AT THIS SITE IN THE TOWNLANDS OF COOM AND KNOCKATEE, COUNTY KERRY. THE PROPOSED DEVELOPMENT WILL CONSIST OF: i. PERMANENT REMOVAL OF COMMERCIAL FORESTRY (DEFORESTATION) OVER AN AREA OF APPROX. 105.5 HA AND THE RESTORATION OF OPEN PEATLAND AND CREATION OF SCRUB HABITAT WITHIN THE FELLED AREA. ii. RESTORATION OF FARMLAND HABITAT TO GOOD QUALITY HEN HARRIER FORAGING HABITAT THROUGH DIVERSIFYING THE RANGE AND EXTENT OF HABITATS OVER AN AREA OF APPROX. 17.7 HA; iii. ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING FENCING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413) [ ] YES [?] NO AN ENVIRONMENTAL IMPACT... Read more
29/08/2025 Leinster
(full address available after signup)
The proposed amendments include: 1) Removal of the gas TURBINE buildings housing the approved OCGT units ( TURBINEs, generators and auxiliary equipment). The OCGT units will remain in place; 2) Addition of FinFan cooler unit and associated plant; 3) Revised Water Treatment Plant (‘WTP’) design and layout, incorporating: Replacement of de-ionising building with modular demineralised water plant; Addition of air compressor container, waste water and oily water collection sumps, and chemical dosing skid; Revised position for chemical storage area and bun... Read more
27/08/2025 Munster
(full address available after signup)
for the development of Illaunbaun WIND FARM in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind TURBINEs with a maximum overall blade tip height of 150 m. • Construction of associated TURBINE foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-... Read more
13/08/2025 Leinster
(full address available after signup)
The proposed development is for the installation of a micro-wind TURBINE on the... Read more
21/07/2025 Connaught
(full address available after signup)
of pl. ref: 23/225 for the following: (1) alterations to the Cnoc Raithní (Knockranny) WIND FARM (Galway County Council pl. ref. no. 13/829 & ABP ref: 07.243094 comprising 11no. wind TURBINEs with an overall ground to blade tip height of 150m (an increase of 19.5m & 9.5m from 130.5m & 140.5m, as previously permitted), a rotor blade length of 68m or 69m & a hub height of 81m or 82m; associated increase in TURBINE foundations; & omission of permitted on-site 110k... Read more
15/07/2025 Munster
(full address available after signup)
Permission for the continued operation of the existing Taurbeg WIND FARM, which includes 11 no. TURBINEs, a 38kV substation and associated infrastructure (as permitted by cork county council ref N/02/3608) for a further period of 10 years from the date of expiry of the current planning permission and for the decommissioning of the entire Taurbeg WIND FARM at the end of that further period. All elements of the Read more
14/07/2025 Munster
(full address available after signup)
THE PROPOSED DEVELOPMENT WILL CONSIST OF: i. PERMANENT REMOVAL OF COMMERCIAL FORESTRY (DEFORESTATION) OVER AN AREA OF APPROX. 105.5 HA AND THE RESTORATION OF OPEN PEATLAND AND CREATION OF SCRUB HABITAT WITHIN THE FELLED AREA. ii. RESTORATION OF FARMLAND HABITAT TO GOOD QUALITY HEN HARRIER FORAGING HABITAT THROUGH DIVERSIFYING THE RANGE AND EXTENT OF HABITATS OVER AN AREA OF APPROX. 17.7 HA; iii. ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING FENCING. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED IN RELATION TO THE PROPOSED DEVELOPMENT AND ACCOMPANY THIS PLANNING APPLICATION. THE PROPOSED DEVELOPMENT COMPRISES OFFSETTING MEASURES ASSOCIATED WITH THE PROPOSED CONTINUED OPERATI... Read more
11/07/2025 Munster
(full address available after signup)
Planning Permission for 1 - Extension and modifications to existing dwellinghouse including roof & wall finish, 2 - Demolition of Greenhouse, 3 - Installation of proprietary wastewater treatment plant, 4 - Decommissioning of existing septic tank, 5 - Installation of domestic wind TURBINE and roof PV panels and all associated siteworks... Read more
09/07/2025 Leinster
(full address available after signup)
i. construct 2 no. wind TURBINEs with an overall TURBINE tip height of 175 metres; a rotor blade diameter of 150 metres; and hub height of 100 metres, and associated foundations and hard standing areas; ii. Upgrade of existing tracks and roads and the provision of new site access roads; iii. Underground electrical and communications cabling connecting the wind TURBINEs to a proposed 38kV on-site substation located in the townland of Ballynaslee Co. Kilkenny;... Read more
09/07/2025 Leinster
(full address available after signup)
for development at this site.The proposed development, subject of this application, will consist of: i. The construction of 6 no. wind TURBINEs with an overall TURBINE tip height of 175 metres; a rotor blade diameter of 150 metres; and hub height of 100 metres, and associated foundations and hard standing areas; ii. A permanent 38kV substation compound (control building with welfare facilities, all associated electrical plant and apparatus, security fencing including vegetative screening, underground cabling, wastewater holding tank, site drainage an... Read more
01/07/2025 Munster
(full address available after signup)
Retention and permission for continued use for a period of 20 years of an existing windfarm (previously permitted under expired permission Pl. Reg. No. 00/805), consisting of 5 TURBINEs and associated hardstands, 1 on-site substation and all associated and existing on-site infrastructure... Read more
27/06/2025 Leinster
(full address available after signup)
for the ‘Continuance of Use’ of the existing Rahora Windfarm, permitted under An Bord Pleanála Ref. PL10.206373 and Kilkenny County Council Ref. 03/1117; amended under 07/2253 (repositioning of the 5 no. TURBINEs and amended layout for the site roads); further amended under 08/595 (repositioning of TURBINE number T5, amended layout to the site roads and reduction in size of the control building). The windfarm was built in 2008/2009 and commissioned on 6th May 2009. The operating windfarm consists of five (5) wind Read more
29/05/2025 Connaught
(full address available after signup)
The continued use of an existing guyed wind monitoring mast, with instruments, 100m in height on its lands at Shanvodinnaun, Co. Mayo for a further period of one year. The purpose of the mast is to assess the suitability of the company’s adjacent lands for WIND FARM development. Previous planning application references: 16/1013, 22/244.... Read more
23/05/2025 Leinster
(full address available after signup)
for the erection of 4 wind TURBINEs. A 10-year planning permission and 35 year operational life from the date of commissioning of the entire WIND FARM is being sought. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS). See full Development Description in attached document `7048 CWF - Development Description`.... Read more
08/05/2025 Munster
(full address available after signup)
for a renewable energy development in the townlands of Moanmore Lower, Moanmore South, Tullabrack, Tullabrack East and Gower South, Kilrush, Co Clare. The Development will include the: • erection of 3 no. wind TURBINEs with an overall ground to blade tip height of 150m, with a rotor diameter of 136m and a hub height of 82m and a total generating capacity of 15MW, • construction of TURBINE hard stand areas and TURBINE foundations, • construction of new internal ... Read more
07/05/2025 Connaught
(full address available after signup)
We, ART Generation Limited, give notice of our intention to apply for permission for a renewable energy project in the townlands of Tonregee and Levallyroe, Ballyhaunis, County Mayo. The proposed development will consist of: • Construction of a single wind TURBINE with an overall ground to blade tip height of 156.5m, comprising rotor diameters of 133m and a hub height of 90m. • Construction of a permanent crane hardstand area and temporary laydown/storage area and TURBINE foundation. • Upgrade of existing access tracks and construction of new perm... Read more
01/05/2025 Leinster
(full address available after signup)
the dev.will incl.the following main components:•Erection of 4wind TURBINEs;The candidate wind TURBINEs for T1, T2 and T4 have a rotor diameter of 150m, a hub height of 105m and a tip height of 180m. The candidate wind TURBINE for T3 has a rotor diameter of 117m,a hub height of 91.5m & a tip height of 150m;•Construction of permanent TURBINE Hardstands & Read more
17/04/2025 Leinster
(full address available after signup)
The erection of a guyed wind monitoring mast, with instruments, 120 metres in height and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for WIND FARM development. The application will include a Natura Impact Statement.... Read more
08/04/2025 Leinster
(full address available after signup)
the development of a recreational shared cycle and walkway located on Bord Na Móna lands. The development proposes the following: a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 18,958 meters of existing former rail bed and 827 meters along pre-existing machine access routes. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Way within the townlands of Coole and Knockballyboy; the Public Amenity Facilities at Mountlucas WIND FARM within the townlands of Clonarrow or Riverlyons and Drumcaw or Mountlucas; and the Cloncreen Read more
04/04/2025 Leinster
(full address available after signup)
for the erection of a guyed wind monitoring mast 120m in height, with instruments, and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for WIND FARM development. Revised by Significant further information which consists of an auxiliary power system including wind charger 5 metres in height, underground cabling 12 metres in length, solar array and battery enclosure... Read more
21/03/2025 Munster
(full address available after signup)
Erection of eight wind TURBINEs with an overall ground to blade tip height of 175m consisting of a rotor diameter of 150m; and a hub height of 100m, Construction of permanent TURBINE hardstands and TURBINE Foundations, Construction of one temporary Construction Compound with associated temporary site offices parking areas and security fencing, Installation of meteorological mast with a height of 100m, Development of one on-site Borrow pit, Construction of new p... Read more
19/03/2025 Leinster
(full address available after signup)
Permission for development at a site (the Castledockrell WIND FARM)... Read more
11/03/2025 Ulster
(full address available after signup)
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED DEVELOPMENT SEEKS A 10-YEAR PERMISSION FOR THE PROPOSED TWO WIND TURBINES AND ALL ASSOCIATED WORKS. THE DEVELOPMENT WILL INCLUDE TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 119.5 METRES; SITE WORKS WILL INCLUDE THE CONSTRUCTION OF WIND Read more
10/03/2025 Leinster
(full address available after signup)
Permission for development at a site (the Castledockrell WIND FARM)... Read more
05/03/2025 Munster
(full address available after signup)
The installation of a lattice-type meteorological mast (30m in height) with associated apparatus and all ancillary development works. The proposed meteorological mast will form part of the operational Cleanrath WIND FARM development... Read more
25/02/2025 Leinster
(full address available after signup)
revisions to the existing dwelling including (1) conversion of attached garage to use as a bedroom and study,(2) minor revisions to the external elevations to the dwelling including the addition of 3 number additional rooflights to the rear elevation of the dwelling (3) construction of a single-storey detached shed located to the rear/side of the dwelling, (4) erection of a small metal storage shed located to the rear of the dwelling (5) erection of a wind TURBINE in the paddock to the rear of the dwelling, (6) revisions to the vehicle entrance/ front boundary wall and associated site works and services for this dwelling from that previously permi... Read more
29/01/2025 Leinster
(full address available after signup)
the development of a recreational shared cycle and walkway located on Bord Na Móna lands. The development proposes the following: a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 18,958 meters of existing former rail bed and 827 meters along pre-existing machine access routes. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Way within the townlands of Coole and Knockballyboy; the Public Amenity Facilities at Mountlucas WIND FARM within the townlands of Clonarrow or Riverlyons and Drumcaw or Mountlucas; and the Cloncreen Read more
21/01/2025 Ulster
(full address available after signup)
CONSTRUCTION AND OPERATION OF 2 NO. WIND TURBINES COMPRISING OF A STEEL TOWER, NACELLES, AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT INCLUDES: EXTERNAL WIND TURBINE TRANSFORMERS, TURBINE HARDSTANDS, NEW ACCESS TRACKS, UPGRADING OF EXISTING TRACKS, NEW SITE ENTRANCE, DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TR... Read more
18/01/2025 Leinster
(full address available after signup)
for a wind energy project consisting of nine 500 kW wind TURBINEs represents a total installed capacity of 4.5 MW. This medium-scale WIND FARM is suitable for small communities, industrial applications, or grid-connected renewable energy projects. Key Details: Total Capacity: 4.5 MW (9 TURBINEs x 500 kW each). Annual Energy Output: Approximately 10–18 million kWh/year (depending on the site`s wind conditions and capacity factor). Land Requirement: Requires ... Read more
03/01/2025 Leinster
(full address available after signup)
for a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i. 7 no. wind TURBINEs with an overall Read more
30/12/2024 Munster
(full address available after signup)
A fifteen (15) year planning permission for continuation of the operational life of the existing Gneeves WIND FARM from the date of expiration (November 2025) of the current planning permission (N/99/616, 03/6585, 04/188). The site measures 10.101 hectares. The existing WIND FARM consists of the following; 11 no. existing, operational Vestas V52 wind TURBINEs, 8 no. TURBINE<... Read more
20/12/2024 Munster
(full address available after signup)
The proposed development will consist of the construction of a detached building for domestic use ancillary to the main dwelling and the development of on-site renewable energy infrastructure. The proposed development will comprise of: 1) the removal of existing tennis court, 2) the construction of a detached building comprising of storage and gallery space, gym and leisure facilities including lap pool and padel and tennis courts at roof level, in addition to access lift and pavilion area, 3) the provision of 14 no. ground mounted arrays, each with 18 no. photovoltaic panels; 4) 12 no. mini wind TURBINEs of 1.25 metres in height, 5) the provision... Read more
18/12/2024 Leinster
(full address available after signup)
RETENTION permission for continued use of an existing guyed wind monitoring mast, with instruments , 100m in height on its lands for a further period of three years. The purpose of the mast is to assess the suitability of the company`s adjacent lands for WIND FARM development. Previous planning application reference numbers: 16/6259 & 21/620... Read more
11/12/2024 Leinster
(full address available after signup)
a ten-year permission for development on lands measuring 17.28ha. The proposed development will consist of the following: (i) Demolition of a single-storey derelict shed structure (c. 93 sqm GFA) to facilitate the TURBINE haul route (ii) Construction of two E175 EP5 wind energy converters, each with an electrical rating of 7MW, an overall ground-to-blade tip height of 199.9 metres, a rotor blade diameter of 175 metres, hub height of 112.4 metres, associated foundations and hard-standing areas; (iii) Construction of an 800m permanent internal site access road which will run from the L50462 to the wind energy converter hardstanding areas including a... Read more
04/12/2024 Leinster
(full address available after signup)
Permission for proposed development to consist of: (i) The construction of 5 no. wind TURBINEs with the following parameters: a) Total tip height range of 179.5m – 180m, b) Rotor diameter range of 149m – 163m, c) Hub height range of 98m to 105m, (ii) Construction of TURBINE foundations, crane hardstand areas and assembly areas; (iii) All associated WIND FARM underground electrical and communications cabling connecting the Read more
26/11/2024 Munster
(full address available after signup)
A fifteen (15) year planning permission for continuation of the operational life of the existing Gneeves WIND FARM from the date of expiration (November 2025) of the current planning permission (N/99/616, 03/6585, 04/188). The site measures 10.101 hectares. The existing WIND FARM consists of the following; 11 no. existing, operational Vestas V52 wind TURBINEs, 8 no. TURBINE<... Read more
18/11/2024 Leinster
(full address available after signup)
Permission for a ten year development for: (i) The construction of 5 no. wind TURBINEs with the following parameters: a) Total tip height range of 179.5m – 180m, b) Rotor diameter range of 149m – 163m, c) Hub height range of 98m to 105m, (ii) Construction of TURBINE foundations, crane hardstand areas and assembly areas; (iii) All associated WIND FARM underground electrical and communications cabling connecting the Read more
15/11/2024 Leinster
(full address available after signup)
permission for a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i. 7 no. wind TURBINEs with an overall Read more
08/11/2024 Leinster
(full address available after signup)
Permission for development at this site (The Ballywater WIND FARM)... Read more
31/10/2024 Connaught
(full address available after signup)
amend a previously permitted development granted planning permission granted under An Bord Pleanála Reference PL12.312895 (Leitrim Co Co Reference 21/57) in the townlands of Tullinloughan, Lackagh, Tullynamoyle and Gowlaun, County Leitrim. The permitted development provides for the construction of a 10 year permission for an additional 4 wind TURBINEs with ancillary substation building, container unit, and associated plant and site development works under a 10-year duration planning permission. The proposed amendments to the permitted development comprise: • Increase in the tip height of the consented Read more
29/10/2024 Leinster
(full address available after signup)
Permission for development at this site (The Ballywater WIND FARM)... Read more
17/10/2024 Munster
(full address available after signup)
Permission for the construction of a single 4.3MW wind TURBINE, inclusive of underground connection to new on-site electrical building and associated infrastructure. The application relates to an establishment operating under an Industrial Emissions Licence. Hovione is notified as a Lower Tier Establishment under the Major Accidents Directive (as enacted by S.I. 209 of 2015). A Natura Impact Statement and Environmental Impact Assessment Report will be submitted to the Planning Authority with the application.... Read more
11/10/2024 Leinster
(full address available after signup)
development of a 10 year planning permission for 180 Megawatt gas fired peaking power plant on a site comprising 7.87 ha. The electricity generating station will comprise • 3 no. open cycle gas TURBINEs (OCGT) generators each consisting of an air intake filter system, exhaust stack (30m high), fin fan coolers, start transformer, power control centre, fire extinguishing cabinet; and waste process water tank. • Liquid fuel storage (secondary fuel) supply which includes; three bunded fuel storage tanks each with 1,950m3 capacity (15m diameter x 11m high). • unloading area, fuel polishing and transfer system building and fuel pipework. • Three generat... Read more
09/10/2024 Leinster
(full address available after signup)
intend to apply for permission for a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i .7 no. wind TURBINEs with an overal... Read more
07/10/2024 Munster
(full address available after signup)
the development that will consist of the following works: (a) Demolition and removal of existing build on-site. (b) The construction of a new open cycle TURBINE Power Generation Station with an output of up to 299 Megawatts. The proposed station will consist of 1 no. Gas TURBINE and 1 no. 44 m high Exhaust Stack, 1no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse... Read more
19/09/2024 Ulster
(full address available after signup)
ELEMENTS OF WIND FARM INFRASTRUCTURE AND RECTIFICATION OF ASSOCIATED RED LINE BOUNDARY ... Read more
19/09/2024 Connaught
(full address available after signup)
a twenty (20) year planning permission for continuations of the operational life of the existing WIND FARM (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing WIND FARM which comprises the follow elements: a. 4 no. existing wind TURBINEs with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. onsite ... Read more
18/09/2024 Munster
(full address available after signup)
The proposed development will consist of a.) a full decommissioning and removal of existing 0.8MW Wind TURBINE b.) Construction of a new 2.35MW Wind TURBINE with a hub height of 58.9 metres, a rotor diameter of 82 metres and an overall tip height of 99.9 metres c.) wind TURBINE foundation d.) hardstanding area e.) underground electrical cables and f.) all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with ap... Read more
11/09/2024 Munster
(full address available after signup)
Permission for the construction of a single 4.3MW wind TURBINE, inclusive of underground connection to new on-site electrical building, and associated infrastructure. The application relates to an establishment operating under an Industrial Emissions Licence. Hovione is notified as a Lower Tier Establishment under the Major Accident’s Directive (as enacted by S.I. 209 of 2015). A Natura Impact Statement and Environmental Impact Assessment Report will be submitted to the planning authority with the application.... Read more
04/09/2024 Munster
(full address available after signup)
the proposed development of 9 no. wind TURBINEs, 110kV substation and ancilliary development located in the townlands of Snatty, Hurdlestown, Oatfield, Drumsillagh, Sallybank, Gortacullin, Aharinaghbeg, Knockshanvo, Cloontra, Cloghoolia, Ballycullen and others, County Clare. And located in the townland... Read more
04/09/2024 Ulster
(full address available after signup)
permission to erecting a 850kW Wind TURBINE, located at the North area of our existing plant; the Wind TURBINE will be installed with a hub height of 65 meters and a blade radius of 26 meters, with underground ducting connecting to the existing ESB substation and all associated site works. A Natura Impact Assessment (NIS) will be submitted to the Planning Authority in connection with the application described above, Significant Further Information received relates to submitted, Assessment of landscape & Visual Impact, Proposed Wind Read more
30/08/2024 Munster
(full address available after signup)
Permission for the construction of a single 4.3MW wind TURBINE, inclusive of underground connection to new on-site electrical building, and associated infrastructure. The application relates to an establishment operating under an Industrial Emissions License. Hovione is notified as a Lower Tier Establishment under the Major Accident`s Directive (as enacted by S.I. 209 of2015). A Natura Impact Statement and Environmental Impact Assessment report will be submitted to the planning authority with the application.... Read more
29/08/2024 Munster
(full address available after signup)
The development will consist of: (i) The construction of 7 no. wind TURBINEs with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated WIND FARM underground electrical and communications cabling connecting the TURBINEs and mast to the proposed electrical substation; (iv) C... Read more
29/08/2024 Connaught
(full address available after signup)
A ten year permission for the development of a WIND FARM project. The development will consist of: - the construction of up to 8 No. wind TURBINEs with a maximum overall tip height of between 176-180m, comprising rotor diameters ranging between 133-150m and hub heights ranging between 105-112m high; - associated wind TURBINE foundations and hard stand areas at each TURBI... Read more
28/08/2024 Leinster
(full address available after signup)
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which wi... Read more
23/08/2024 Leinster
(full address available after signup)
Lea Mór Renewable Energy Community (REC) Limited,intend to apply for permission for development at this site at Rin, Co. Offaly. The development will consist of: • The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. • Installation of the hardstanding area for the Wind Energy Converter. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It wil... Read more
21/08/2024 Munster
(full address available after signup)
a ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan), Shannaknock, Killeagy (Stritch), Killeagy (Goonan), Ballymoloney, Magherareagh and Lackareagh Beg, Co Clare. The development will consist of: (i) The construction of 7 No. wind TURBINEs with the following parameters: a. Total tip height range of 179.5m - 180m, b. Rotor diameter range of 149m - 155m, c. Hub height range of 102.5m to 105m; (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated WIND FARM undergroun... Read more
13/08/2024 Leinster
(full address available after signup)
for a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical and mechanical plant rooms, fuel compound, sprinkler tanks and associated ancillary development; Data centre building Nos. 1, 2, 3, 4 and 6 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,164m2; Gas TURBINEs, gas engine an... Read more
09/08/2024 Munster
(full address available after signup)
The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind TURBINEs each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • TURBINE Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Crought, Ballyclogh including a new site entrance for the constr... Read more
09/08/2024 Ulster
(full address available after signup)
erecting a 850kW Wind TURBINE, located at the North area of our existing plant; the Wind TURBINE will be installed with a hub height of 65 meters and a blade radius of 26 meters, with underground ducting connecting to the existing ESB substation and all associated site works... Read more
01/08/2024 Leinster
(full address available after signup)
for a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical and mechanical plant rooms, fuel compound, sprinkler tanks and associated ancillary development; Data centre building Nos. 1, 2, 3, 4 and 6 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,164m2; Gas TURBINEs, gas engine an... Read more
29/07/2024 Leinster
(full address available after signup)
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will ... Read more
23/07/2024 Leinster
(full address available after signup)
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which wi... Read more
09/07/2024 Munster
(full address available after signup)
Permission for construction of a single 4.3MW wind TURBINE generator (WTG) at their facility. This application will be inclusive of the TURBINE, underground connection to new on-site electrical building and all associated infrastructure. Proposed project will contribute towards decarbonizing the Hovione facility by using energy from WTG to power on-site operations. This facility operates under an Industrial Emissions Licence. Permission is accompanied with both an Environmental Impact Assessment Report (EIAR) & Natura Impact Statement (NIS)... Read more
28/06/2024 Munster
(full address available after signup)
Permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind TURBINEs each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • TURBINE Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Croughta, Ballyclogh including a new site entrance for the construction phase and upgradi... Read more
26/06/2024 Munster
(full address available after signup)
temporary road widening works and construction of temporary sections of stoned roads and all ancillary development on the R691 and L-2107-2 at bends and junctions to enable the delivery of TURBINE components to consist of: • Construction of a temporary section of stoned road located adjacent to the R691 in the townland of Harleypark to accommodate abnormal load deliveries. The works will require a temporary bridge crossing and all associated drainage and sediment protection, temporary works and storage area, temporary stockpiles and demolition and reinstatement of a section of stone wall to accommodate the works. • Temporary widening of section o... Read more
21/06/2024 Leinster
(full address available after signup)
for the proposed development to consist of temporary road widening works and construction of temporary sections of stoned roads and all ancillary works on the R691 and R695 at bends and junctions to enable the delivery of TURBINE components. These works consist of; • Temporary widening of section of the R691 in the townland of Booly comprising construction of a stoned area to accommodate abnormal load deliveries. • Construction of a temporary section of stoned road off the R691 and R695 in the townland of Ballyclovan to accommodate abnormal load deliveries. • Construction of a temporary section of stoned road off the R691 in the townland of S... Read more
21/06/2024 Munster
(full address available after signup)
temporary road widening works and construction of temporary sections of stoned roads and all ancillary development on the R691 and L-2107-2 at bends and junctions to enable the delivery of TURBINE components. These works consist of; • Construction of a temporary section of stoned road located adjacent to the R691 in the townland of Harleypark to accommodate abnormal load deliveries. The works will require a temporary bridge crossing and all associated drainage and sediment protection, temporary works and storage area, temporary stockpiles and demolition and reinstatement of a section of stone wall to accommodate the works. • Temporary widening o... Read more
07/06/2024 Ulster
(full address available after signup)
10 YEAR PLANNING PERMISSION FOR WORKS RELATING TO BRADÁN WIND FARM WHICH WILL CONSIST OF (1) THE UPGRADE OF APPROXIMATELY 0.7KM OF EXISTING ACCESS TRACK AND EXISTING SITE ENTRANCE, (2) CONSTRUCTION OF APPROXIMATELY 1.2KM OF NEW ACCESS TRACKS AND NEW SITE ENTRANCE, (3) CONSTRUCTION OF A 5.5M SPAN TEMPORARY BRIDGE AND ASSOCIATED ANCILLARY INFRASTRUCTURE... Read more
15/05/2024 Connaught
(full address available after signup)
Section 5 Declaration: maintenance works to an existing culvert and watercourse to allow for the placing of a micro hydro TURBINE in the existing culvert serving the watercourse... Read more
07/05/2024 Leinster
(full address available after signup)
for development. The development will consist of: (i) All works (within County Kilkenny) associated with the connection of the proposed Seskin WIND FARM to the national electricity grid, via underground 38kV electrical cabling within the public road corridor to the existing Kilkenny 110kV substation; (ii) Provision of 16 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (iii) Reinstatement of the road and track surfaces above cabling trench along existing roads and tracks; (iv) Carriageway strengthening works at ‘Black Bridge’ on the L1835 / L3037 (Protected Structure RPS Ref. D84); ... Read more
07/05/2024 Leinster
(full address available after signup)
PERMISSION The development will consist of a 220kV underground cable measuring approximately 4.0m in length, from the Ringsend Open Cycle Gas TURBINE (OCGT) plant permitted under application ref: PWSDZ3074/23 and the existing Irishtown 220kV substation, to facilitate electricity generated to be transferred to the national grid, and includes all associated works to facilitate the development.... Read more
26/04/2024 Leinster
(full address available after signup)
to replace an existing telecommunications installation, wind TURBINE, associated equipment compound and fencing with a new 15m monopole type telecommunications support structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets and associated site works . Revised by Significant Further Information which consists of Retention Permission sought for existing telecommunications installation, wind TURBINE and associated equipment compound and fencing and planning permissio... Read more
26/04/2024 Leinster
(full address available after signup)
The development will consist of a 220kV underground cable measuring approximately 4.0m in length, from the Ringsend Open Cycle Gas TURBINE (OCGT) plant permitted under application ref: PWSDZ3074/23 and the existing Irishtown 220kV substation, to facilitate electricity generated to be transferred to the national grid, and includes all associated works to facilitate the development.... Read more
25/04/2024 Munster
(full address available after signup)
Permission for a) a wind TURBINE with a maximum hub height of 85m, a maximum rotor diameter of 71m and a maximum overall blade tip height of 120.5m, b) a transformer building, c) associated site works, including temporary construction access, for energy self-supply on-lands adjacent to its existing plant. The TURBINE dimensions have been reduced from that originally granted under planning reg 10/6157 (PL04.238982). The application relates to a facility which is licensed by the environmental protection agency under an industrial emissions (IE) licence. Th... Read more
18/04/2024 Munster
(full address available after signup)
the construction of foundation drainage at the base of six wind TURBINEs ( TURBINEs number: 6, 7, 8, 9, 11, and 19)... Read more
29/03/2024 Munster
(full address available after signup)
for the erection of 4 no. wind TURBINEs with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and TURBINE foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to inc... Read more
20/03/2024 Munster
(full address available after signup)
The proposed development will consist of the removal of an existing 14.445 metres telecommunications monopole and replacement with a new 18 metres telecommunications monopole together with antennas, remote radio units (RRU`s), dish, GPS, cable ladder, gantry poles, nominal wind TURBINE affixed on top of monopole, supporting fixtures, concrete foundation, extension of an existing fence and all associated site development works to provide for high-speed wireless data and broadband services... Read more
28/02/2024 Leinster
(full address available after signup)
development which will consist of alterations to the development consented under Westmeath Planning Case Ref. 21/515 (parent permission) and are as follows: (i) reconfiguration of structures and pipework within the above ground installation (AGI) compound, (ii) increase the size of gas oil (secondary fuel) storage tanks and bund and realignment of tanks within the bund, (iii) remove one consented emergency diesel generator from the development layout and reposition of the second consented emergency diesel generator alongside an LV switchroom, (iv) reposition palisade fence associated with ancillary equipment compound approximately 15m to the west, (v) reconfigure and reposition fuel pumps (polishing and forwarding), MCC equipment, fire wate... Read more
23/02/2024 Leinster
(full address available after signup)
the continued operation of the existing Cronelea Upper WIND FARM; as permitted under Wicklow County Council Planning Register Reference 01/4273 (An Bord Pleanála Reference PL27.125044); for a further period of 15-years following the expiry of its current planning permission. The existing WIND FARM comprises (i) 3 no. wind TURBINEs and associated TURBINE foundations an... Read more
08/02/2024 Munster
(full address available after signup)
1. Solar PV panels to the existing hotel roof 2. Two new wind TURBINEs, not exceeding 21.2m height. 3. A Container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works... Read more
07/02/2024 Munster
(full address available after signup)
(1). Solar PV panels to the existing hotel roof (2). Two new wind TURBINEs, not exceeding 21.2m height (3). A container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works... Read more
19/01/2024 Connaught
(full address available after signup)
ten year planning permission with a 40-year operational life (from the date of commissioning of the development). (ii) Construction of 4 No. wind TURBINEs with an overall ground to blade tip height ranging from 149.85m to 150m inclusive. The wind TURBINEs will have a rotor diameter ranging from 115.7m to 117m inclusive and a hub height ranging from 91.5m to 92m inclusive. (iii) Construction of permanent TURBINE hardstands and Read more
22/12/2023 Munster
(full address available after signup)
temporary road widening works to the R691 along bends and junctions to enable the delivery of TURBINE components. These works consist of; • Temporary widening of section of the R691 in the townland of Harleypark and Aughnacrumpane comprising construction of a stoned area on a bend to accommodate abnormal load deliveries. The works will be in the roadside verge and require the demolition and reinstatement of a stone wall. • Temporary widening of section of the R691 in the townland of Harleypark comprising construction of a stoned area at a bend to accommodate abnormal load vehicles. The demolition of a stone wall and reinstatement is required to... Read more
21/12/2023 Connaught
(full address available after signup)
planning permission for the installation of three no. 20 kW wind TURBINEs within the grounds of the existing Connacht GAA Centre of Excellence previously permitted and constructed under Pl. Ref P08/1995. The three TURBINEs will have a tower height of 18m, a blade diameter of 9.8m and a blade tip height of 24m. The installation of the three no. wind TURBINEs will be adjacent to the existing 3G pitch and will include all associated site development works within t... Read more
19/12/2023 Connaught
(full address available after signup)
development will consist of (i) the construction of a 30m-high free-standing lattice meteorological mast with underground cabling to the existing Black Lough WIND FARM control building; and (ii) all associated ancillary works... Read more
08/12/2023 Connaught
(full address available after signup)
The development will consist of (i) the construction of a 30m-high free-standing lattice meteorological mast with underground cabling to the existing Black Lough WIND FARM control building; and (ii) all associated ancillary works.... Read more
04/12/2023 Munster
(full address available after signup)
temporary road widening works to the R691 along bends and junctions to enable the delivery of TURBINE components to consist of; a) Temporary widening of section of the R691 in the townland of Harleypark, Aughnacrumpane and Scotsborough comprising construction of a stoned area on a bend to accommodate abnormal load deliveries, the works will be in the roadside verge and require the demolition and reinstatement of a stone wall, b) Temporary widening of section of the R691 in the townland of Harleypark comprising construction of a stoned area at a bend to accommodate abnormal load vehicles, the demolition of a stone wall and reinstatement is requir... Read more
04/12/2023 Leinster
(full address available after signup)
for works relating to the TURBINE Delivery Route for Farranrory WIND FARM. The proposed development will consist of: • Construction of a Blade transfer area, located off the N76, in the townlands of Browns Town, and Rathaleek includes hardstanding areas for cranes, welfare facilities and parking for staff, laydown area for TURBINE blades, temporary removable security barrier and all associated drainage and ancillary works. • Temporary widening of a section... Read more
29/11/2023 Leinster
(full address available after signup)
for development at this site. The development will consist of : erecting a 2MW Wind TURBINE, located to the southwest of our main building; the Wind TURBINE will be installed with a hub height of 64 meters and a blade radius of 35.5 meters, with underground ducting connecting to the existing ESB substation and all associated site works at Queally Pig Slaughtering Limited T/A Dawn Pork and Bacon. The application relates to the development which comprises of an activity which holds an Integrated Pollution Control Licence (IPC) (Licence No. P0175-02)... Read more
24/11/2023 Munster
(full address available after signup)
Permission for the relocation and erection of a small micro generation research wind TURBINE at the north -eastern corner of the site. The wind TURBINE will be used to provide power to the Beaufort Building and for the educational purposes. The project involves: 1) construction of a concrete foundation for the TURBINE (measuring 12.25m2), 2) erection of the tower and TURBINE... Read more
21/11/2023 Munster
(full address available after signup)
temporary road widening works to the R691 along bends and junctions to enable the delivery of TURBINE components. These works consist of; (1) Temporary widening of section of the R691 in the townland of Harleypark, Aughnacrumpane and Scotsborough comprising construction of a stoned area on a bend to accommodate abnormal load deliveries. The works will be in the roadside verge and require the demolition and reinstatement of a stone wall, (2) Temporary widening of section of the R691 in the townland of Harleypark comprising construction of a stoned area at a bend to accommodate abnormal load vehicles. The demolition of a stone wall and reinstatement... Read more
21/11/2023 Leinster
(full address available after signup)
for the construction of a Blade transfer area, located off the N76, in the townlands of Browns Town, and Rathaleek includes hardstanding areas for cranes, welfare facilities and parking for staff, laydown area for TURBINE blades, temporary removable security barrier and all associated drainage and ancillary works. •Temporary widening of a section of the R691 in the townland of Ballyclovan at the junction of the R695 comprising construction of a stoned area to accommodate abnormal load deliveries.... Read more
17/11/2023 Leinster
(full address available after signup)
proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will pro... Read more
16/11/2023 Ulster
(full address available after signup)
permission for the installation of a TURBINE Service Base Compound consisting of an Office/Canteen unit, 2 no. storage containers, a 2-person toilet block unit with an associated underground alarmed effluent tank, and all ancillary site works on an area adjacent to the existing Drumlins Park WIND FARM 110kV Substation and Compound ... Read more
03/11/2023 Ulster
(full address available after signup)
permission for the installation of a TURBINE Service Base Compound consisting of an Office/Canteen unit, 2No. Storage containers, a 2-person toilet block unit with an associated underground alarmed effluent tank, and all ancillary site works on an area adjacent to the existing Drumlins Park WIND FARM 110kV Substation and Compound... Read more
31/10/2023 Connaught
(full address available after signup)
Permission for amendments to (i) extant planning permission PD18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD11/126 and PD18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD18/313. The output from the development will be 4.9MW, similar to the extant planning permissions. The amendments will provide for 1. Erection of two bespoke Enercon E138 TURBINEs models in lieu of the Vensys 121 TURBINE models agreed with the Plann... Read more
24/10/2023 Connaught
(full address available after signup)
Planning permission for a renewable wind energy development of a one (1) TURBINE WIND FARM. The proposed development will be located in the townland of Riverstown, approximately 2.2km north of Gorteen, Co. Sligo. The development will comprise of one (1) electricity generating wind TURBINE, which will have an overall maximum tip height of 180 meters, comprising a tower of nominally 112 meters high, and rotor diameter of up to 136 meters. The development will ... Read more
23/10/2023 Ulster
(full address available after signup)
(1) INSTALLATION OF A GRID TRANSFORMER IN THE PREVIOUSLY CONSENTED AND CONSTRUCTED LENALEA WIND FARM SUBSTATION TO PLANNING REFERENCES: 09/50116 AND 20/50835 AND (2) CONSTRUCTION OF AN INDEPENDANT POWER PRODUCER (IPP) BUILDING (MEASURING 149M2) ALONG WITH ASSOCIATED GRID COMPENSATION EQUIPMENT, A DIESEL GENERATOR, AND UNDER GROUND CABLE TRENCHES LINKING THE PROPOSED IPP BUILDING TO THE GRID TRANSFORMER, AUXILIARY EQUIPMENT, A BOREHOLE AND ALL ANCILLARY WORKS ... Read more
19/10/2023 Leinster
(full address available after signup)
continued use of an existing guyed wind monitoring mast, with instruments, 100m in height for a further period of three years. The purpose of the mast is to assess the suitability of the company`s adjacent lands for WIND FARM development. Previous planning application numbers: 15/86 and 20/183 on its lands... Read more
17/10/2023 Connaught
(full address available after signup)
Planning permission for amendments to (i) extant planning permission PD/18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD/11/126 and PD/18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD/18/313. The output from the development will be 4.9MW similar to the extant planning permissions. The amendments will provide for: 1. Erection of two bespoke Enercon E138 TURBINEs models in lieu of the Vensys 121 TURBINE models agreed wi... Read more
12/10/2023 Connaught
(full address available after signup)
The development shall consist of planning permission for the erection of two (2) number, three (3) meter high helical vertical axis wind TURBINEs, with each wind TURBINE upon a twelve (12) meter high demountable support pole, all to support the previously approved planning permission P22/419 and to include all other ancillary site services and development works associated with this permission as contained within the application documentation.... Read more
11/10/2023 Ulster
(full address available after signup)
GRANT OF A 10 YEAR PLANNING PERMISSION FOR DEVELOPMENT OF A 14 TURBINE WIND FARM ON A SITE IN THE TOWNLAND OF AUGHT, APPROXIMATELY 5KM WEST OF QUIGLEY`S POINT. THE DEVELOPMENT WILL COMPRISE OF 14 NO ELECTRICITY GENERATING WIND TURBINES WITH A HUB HEIGHT OF 65 METRES AND A ROTOR DIAMETER OF 71 METRES GIVING AN OVERALL HEIGHT OF UP TO 100.5 METRES, HARDSTANDING, AN ELECTRICAL COMPOUND AND SUBSTATION BUILDING, ASSOCIATED SITE ROADS AND SITE WORKS. IT IS PROPOSED T... Read more
06/10/2023 Leinster
(full address available after signup)
A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables WIND FARM development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and... Read more
06/10/2023 Munster
(full address available after signup)
an amendment to the planning application previously granted permission under planning reference 20/972. The previously consented planning application included the construction of 9 TURBINEs with maximum overall ground to blade tip height of up to 150 metres, associated foundations and hardstand areas; new site entrances, upgrade of existing site entrances; new on-site 38KV substation and all ancillary site works. The proposed amendments to the previously consented application comprise: (1) Increase the tip height of the TURBINEs from 150 to 156.5 metre... Read more
29/09/2023 Connaught
(full address available after signup)
Permission for a development relating to the: • The construction of one Enercon E138 Wind TURBINE on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m • Installation of the hardstanding area for the Wind TURBINE. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c.282m from the proposed wind Read more
22/09/2023 Leinster
(full address available after signup)
a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables WIND FARM development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and... Read more
22/09/2023 Munster
(full address available after signup)
(1) The construction of 7 no. wind TURBINEs and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated wit... Read more
15/09/2023 Leinster
(full address available after signup)
Permission to erect a 3MW Wind TURBINE, located at the East area of our existing biopharmaceuticals plant; the Wind TURBINE will be installed with a hub height of 80 meters and a blade radius of 45 meters, with underground ducting connecting to the existing ESB substation. The application relates to the development which comprises of an activity which holds an Industrial Emissions Discharge (IED) Licence (Licence No. P1122-01)... Read more
15/09/2023 Connaught
(full address available after signup)
Permission for the proposed Project relating to: •The construction of one Enercon E138 Wind TURBINE on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m •Installation of the hardstanding area for the Wind TURBINE. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c.282m from the proposed wind Read more
08/09/2023 Munster
(full address available after signup)
for development comprising of : a) 1940m of underground electrical cabling in Keereen Upper and Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) to the Woodhouse Substation (operational). b) Works within the existing Woodhouse Substation compound in Keereen Upper, comprising a new control building 5.3m X 3.8m and 4.6m high; a 110kV electrical transformer c.6m in height, with associated plinth and bund; an electrical transformer bay; 2 No. lightening masts 17.5m in height and ancillary electrical equipment. Works within the Woodhouse Substation compound will also include a new access track 17m long and 4.5m in width; additional palisade gateway 4.9m wide and 2.6m in height with palisade fencing within the compound and ... Read more
07/09/2023 Munster
(full address available after signup)
the construction of foundation drainage at the base of six wind TURBINEs ( TURBINEs number: 6, 7, 8, 9, 11, and 19)... Read more
21/08/2023 Ulster
(full address available after signup)
(A) CONSTRUCTION OF ONE ENERCON E138 WIND TURBINE ON A 99M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 169M, (B) THE CONSTRUCTION OF WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, (C) PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE, (D) CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS... Read more
17/08/2023 Ulster
(full address available after signup)
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCE... Read more
17/08/2023 Connaught
(full address available after signup)
Permission for development relating to the: •The construction of one Enercon E138 Wind TURBINE on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind TURBINE. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c.282m from the proposed wind Read more
11/08/2023 Leinster
(full address available after signup)
the proposed development will comprise a 170MW (electrical output) Open Cycle Gas TURBINE (OCGT) Power Plant. The proposed development will comprise an electricity generating plant which will use Hydrotreated Vegetable Oil (HVO) as fuel and will be connected to a previously consented 110kV substation (ABP-303678-19) and associated site works and improved access from the R152. The development comprises the following elements: a) Three gas TURBINE buildings (each 990m2) each housing 1 no. Read more
08/08/2023 Munster
(full address available after signup)
the demolition and removal of existing build on-site. The construction of a new Gas Fired open cycle TURBINE Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas TURBINE and 1 no. 44 m high Exhaust Stack, 1 no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse building, 1no. fuel oil storage tank, 1 no. dimine... Read more
20/07/2023 Munster
(full address available after signup)
A new grid connection route connecting the permitted Ballylongford windfarm (Kerry County Council planning ref 19/381) ( An Bord Pleanala ref- PL08.304807) at Aghanagran Middle And Lower, Ballyline West And Tullahennel South, Ballylongford, to the proposed 38kVsubstation (Kerry County Council planning ref 23/431) at Tullamore, Listowel, Co Kerry. The route will entail the installation of approximately 7.3km of 38kv underground electric cable passing through townlands of Aghanagran Lower, Ballyline West, Kilgarvan, Coolkeragh, and Tullamore in County, Kerry The proposed grid route is proposed to be via underground cables located along the public roads : L10028, R552, and L-1009, and private property. The new grid route is a change a pr... Read more
19/07/2023 Connaught
(full address available after signup)
The installation of a modular medium-voltage electricity substation at the Spion Kop WIND FARM to be located adjacent to the existing electricity switchroom. The substation will contain electrical equipment and apparatus to facilitate the connection of the development permitted under Leitrim County Council Planning Register Reference 19/230 (An Bord Pleanála Reference ABP-307627-20) to the national electricity network. The proposed development also comprises ancillary underground electrical and communications cabling and associated site development and reinstatement works.... Read more
12/07/2023 Leinster
(full address available after signup)
Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation... Read more
07/07/2023 Munster
(full address available after signup)
Permission for the installation of a wind TURBINE and associated works... Read more
30/06/2023 Ulster
(full address available after signup)
erect domestic Wind TURBINE and all associated works... Read more
23/06/2023 Ulster
(full address available after signup)
(1) A 38KV UNDERGROUND CABLE GRID CONNECTION APPROXIMATELY 9KM IN LENGTH FROM THE CONSENTED DERRYKILLEW COMMUNITY WIND FARM (AN BORD PLEANÁLA REF. NO. 307520, DONEGAL COUNTY COUNCIL REF. NO. 19/51750) TO LANDS AT TOWNPARKS, NORTH OF THE EXISTING CATHALEEN`S FALL 110KV SUBSTATION IN BALLYSHANNON, (2) A PARTIAL SECTION OF A 38KV OVERHEAD LINE GRID CONNECTION CROSSING 130M OVER THE RIVER ERNE AT CATHALEEN`S FALL, BALLYSHANNON, AND (3) THE DERRYKILLEW COMMUNITY WIND FARM 38KV SUBSTATION AND A BATTERY ENERGY STORAGE SYSTEM. AN ENVIRONMENTAL IMPACT ASSESSMENT ... Read more
20/06/2023 Munster
(full address available after signup)
for development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind TURBINEs with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and TURBINE foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security... Read more
13/06/2023 Connaught
(full address available after signup)
for a 10-year permission for development at this site at Letter, Moycullen, Co. Galway. This site is located within a Gaeltacht area. The proposed development will consist of the provision of a synchronous condenser, enclosed within a building (12.5 metres high) with associated plant and apparatus, transformers, circuit breakers, modular electrical control containers, air compressor, cooling equipment, underground cabling (including 110kV connection to the adjacent Buffy substation (within Ardderroo WIND FARM), lightning protection poles, perimeter security fencing, drainage, landscaping, temporary construction compound, access tracks (new and upg... Read more
09/06/2023 Leinster
(full address available after signup)
The development will consist of 1 no. 2.MW Wind TURBINE, Service Road,... Read more
06/06/2023 Munster
(full address available after signup)
Development is sought for a period of 10 years at a 10.22 hectares site within ESB Aghada Generating Station consisting of 1) Construction/installation of an open cycle gas TURBINE (OCGT) generating unit and associated plant and equipment, comprising the following main components with approximate dimensions as stated : Gas TURBINE air intake [24m x 18m x 26m high], Generator enclosure [24m x 18m x 14.5m high], Gas TURBINE enclosure [53m x 15m x 26m high], Exhau... Read more
06/06/2023 Munster
(full address available after signup)
We, Inchamore Wind Designated Activity Company, intend to apply for permission for a ten-year planning permission for a renewable energy development. The entirety of the renewable energy development constitutes the provision of a five- TURBINE WIND FARM and all associated works on land in both Counties Cork and Kerry. The development for will consist of : 1) a WIND FARM with an operational lifespan of 35 years (from date of commissioning of the development), 2) ... Read more
06/06/2023 Munster
(full address available after signup)
THE DEVELOPMENT IN COUNTY KERRY FORMS PART OF A RENEWABLE ENERGY DEVELOPMENT COMPRISING A FIVE- TURBINE WIND FARM AND ALL ASSOCIATED WORKS ON LANDS IN BOTH COUNTIES CORK AND KERRY. THE DEVELOPMENT IN COUNTY KERRY WILL CONSIST OF UPGRADE OF EXISTING FOREST ACCESS ROADS TO INCLUDE PASSING BAYS AND ALL ASSOCIATED DRAINAGE INFRASTRUCTURE, WORKS AT THE ENTRANCE TO AN EXISTING FOREST ROAD ACCESSED OFF THE N22 TO INCLUDE LOCALISED WIDENING OF THE FOREST ROAD AND CREATION OF A SPLAYED ENTRANCE, REMOVAL OF EXISTING VEGETATION FOR VISIBILITY SPLAYS AND REMOVAL OF ... Read more
02/06/2023 Munster
(full address available after signup)
is sought for the continued operation of the existing Booltiagh WIND FARM as permitted by An Bord Pleanala Ref: 03.120616 (Clare County Council Pl. Ref: 00/567) for a further period of 10 years from the date of the expiry of the current planning permission (30th September 2025) per Condition no. 2 of the consent issued and for the decommissioning of the WIND FARM at the end of that further period. The proposed development development does not comprise any modifications to the existing operational Read more
01/06/2023 Connaught
(full address available after signup)
for the following: (1) alterations to the Cnoc Raithní (Knockranny) WIND FARM (Galway County Council pl. ref. no. 13/829 & ABP ref: 07.243094 comprising 11no. wind TURBINEs with an overall ground to blade tip height of 150m (an increase of 19.5m & 9.5m from 130.5m & 140.5m, as previously permitted), a rotor blade length of 68m or 69m & a hub height of 81m or 82m; associated increase in TURBINE foundations; & omission of permitted on-site 110kV substation & unde... Read more
26/05/2023 Munster
(full address available after signup)
Permission for; a) a wind TURBINE with a maximum height of 85m, a maximum rotor diameter of 71 m and a maximum overall blade tip height of 120.5m; b) a transformer building; c) associated site works, including temporary construction access, for energy self-supply on lands adjacent to its plant Ardnageehy, Charleville, Co.Cork. The TURBINE dimensions have been reduced from that originally granted permission under planning reg 10/6157 (PL04.238982). The application relates to a facility which is licensed by the Environmental Protection Agency under industr... Read more

We have set this post up so that the map and statistics will refresh every week. Bookmark the page so you can quickly return to see the growth of "wind farm" and "turbine" planning applications over time. If you feel that additional keywords could be included then please let us know


Did you know?

Businesses can sign up for PlanningAlerts.ie to get notified of any specific keywords that interest you. Taking this blog post as an example, if you want to be notified of any wind farm planning applications then this is straightforward to set up.

Sign up for a business account

Businesses can also request this data (along with an updated feed) in a format that suits them (Excel, RSS, email updates). Get in touch and let us know how you would like this data and any further refinements beyond "wind farm" and "turbine" that you require. Let us search all 31 planning registers on your behalf and we will inform you whenever a relevant planning application is submitted, updated, decided or commenced.

Contact Us


Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.