IDA Ireland Dundalk Science and Technology Park , Dundalk , Co. Louth
Jun 18 2025
DecisionJun 25 2025
Decision DueJul 21 2025
GrantedJul 20 2030
Expiry (if required)-
Submitted: 01 / 05 / 2025
-
Application Type:
PERMISSION -
Application Status:
APPLICATION FINALISED -
Council Decision:
CONDITIONAL (Granted)
Useful Links:
Development Description:
Permissiom will consist of the replacement of two existing signs from the Wuxi logo to the MSD logo. Placement and size of new proposed signs are similar (new proposed signs are slightly smaller). On the East Elevation facing the internal IDA roundabout and site entrance, sized approximately 10.5 metres wide and approximately 4 metres high, located at a height of approximately 22.5 metres to the top of the sign. The South Elevation facing the existing main manufacturing facility sized approximately 2.5 metres by 7 metres located at a height of approximately 22.5 metres to the top of the sign. Also, the reskin of existing totem signs, replacement notice board, 2 x MSD Logo at Main and Staff Entrance, diabond sign fitted on each side of pedestrian gate and the addition of an entrance sign to be proposed.
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.:
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.