permission for the continued extraction of existing rock quarry, including extraction within the area previously permitted under ref. no. 01/1370 (ABP ref. PL15.128833) comprising c.37.5ha and the deepening of the quarry to a final depth of +60m AOD also in line with the existing permission, as well as the continuation of use of the permitted extension to the overburden area. Permission also sought for an extension of the extraction area of the permitted quarry by c.10.0ha to a proposed depth of +60m AOD in line with the depth permitted. The quarry will continue to be extracted at the average rate of 750,000 tonnes per annum. Permission also sought for the continuation of use of the readymix batching plant, prefabricated sales office and welfare facility, car parking area, aggregate storage bays, water recycling ponds and truck washout, and all associated plant permitted under 01/1370; and waste recovery facility with wheelwash and quarantine area and all associated plant permitted under ref. no. 04/1683 (ABP 15.211176). Permission also sought for an increase in the volume of waste intake in the permitted waste recovery facility from 10,000 tonnes to 20,000 tonnes. Permission for extension to the existing overburden storag...
Signup to read full development description