2.7km |
01/03/2024 |
N/A |
Clooneen Td. Dromore West Co. Sligo. , |
to construct a two-storey dwelling house and domestic garage, install a wastewater treatment system and percolation area and carry out all ancillary site works... login required. |
Details... |
2.9km |
12/02/2024 |
CONDITIONAL |
Fortland , Easkey , Co Sligo |
Planning permission to demolish existing domestic sheds, construct new extension to existing dwelling house, together with all associated alterations and including all associated site works... login required. |
Details... |
2.2km |
31/01/2024 |
N/A |
Castletown , Easkey , Co. Sligo |
1. to retain waste water treatment system, with aeration unit, packaged tertiary intermitted filter and 300mm deep gravel infiltration layer with all ancillary works.
2. Permission to construct 55 sq meter storage shed for domestic use.... login required. |
Details... |
1.3km |
02/01/2024 |
CONDITIONAL |
Killeenduff , Easkey , Co. Sligo |
proposed alterations to developments previously granted under planning re PL21/330 - (1) Reposition roofed manure pit (2) Construction of a new walled silage slab & storage/loose shed along with all associated site works... login required. |
Details... |
2.2km |
19/12/2023 |
N/A |
Castletown , Easkey , Co. Sligo |
to retain waste water treatment system, with aeration unit, packaged tertiary intermitted filter and 300mm
deep gravel infiltration layer with all ancillary works.
Permission to construct 55 sq meter storage shed for domestic use.... login required. |
Details... |
1.1km |
24/11/2023 |
REFUSED |
eir Exchange , Castletown , Easkey Co.Sligo |
To erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing.... login required. |
Details... |
1.1km |
20/11/2023 |
N/A |
eir Exchange , Castletown , Easkey Co.Sligo |
To erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing.... login required. |
Details... |
1.1km |
20/09/2023 |
N/A |
eir Exchange , Castletown , Easkey Co.Sligo |
to erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing... login required. |
Details... |
1.1km |
25/08/2023 |
N/A |
eir Exchange , Castletown , Easkey Co.Sligo |
To erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing.... login required. |
Details... |
1km |
02/06/2023 |
CONDITIONAL |
Main Street , Easkey , Co. Sligo |
carry out repairs and maintenance work to a protected structure (RPS 181) as follows; 1) Repair sagging roof, 2) New full height window to be installed in lieu of the existing rear door opening, 3) General... login required. |
Details... |
760m |
03/05/2023 |
CONDITIONAL |
Bridge House , Bunowna , Easkey Co. Sligo. |
development consisting of (1) Repair/replace roof, fascias, gutters and downpipes, (2) Repair render to external façade where required, (3) Repair/replace windows and doors, (4) Repair/replace floorboards and joists, (5) Retain/repair existing features including fireplaces, internal doors, skirtings, and coving where possible, (6) Retain and repair timber stairs, (7) Repair bou... login required. |
Details... |
2.1km |
09/12/2022 |
CONDITIONAL |
Castletown Td. , Easkey , Co Sligo |
development consisting of the construction of a single storey machinery/storage shed (97.3 sqm) and carrying out of ancillary site works... login required. |
Details... |
1km |
22/08/2022 |
CONDITIONAL |
Killeenduff , Co Sligo |
development consisting of the construction of an extension to the rear of our existing house along with the removal of the existing pebble dash finish on the existing house, and refinishing the house with a painted nap plaster sand cement finish along with any other ancillary works attached... login required. |
Details... |
1000m |
03/05/2022 |
CONDITIONAL |
Curraghnagap Td , Easkey , Co Sligo |
construction of a mobile home / caravan site to consist of: (1) 45 no mobile home bases; (2) serviced parking area for 10 no motor homes; (3) office chalet (floor area = 76.6m2); (4) shower and laundry block (floor are... login required. |
Details... |
1.3km |
13/04/2022 |
CONDITIONAL |
Killeenduff , Easkey , Co. Sligo |
development consisting of proposed alterations to developments previously granted under planning ref PL21/330 - (1) Demolish existing buildings (2) Construction of a new roofed manure pit, 4 bay enclosed dry shed with storage/office space, walled silage ... login required. |
Details... |
300m |
12/04/2022 |
CONDITIONAL |
Adervoher Td , Easkey East ED , Co. Sligo |
development consisting of proposed development of lands consisting of 0.8853 hectares as 'Easkey Glamping Village' to consist of the following elements: (i) Works to the front roadside boundary to enable safe access and suitable sightlines, (ii) Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room, bathrooms & bin store (Total area of 223.60 m2), (iii) Communal Area with Firepit, BBQ, outdoor seating and play area, (iv) 3no. storey and ha... login required. |
Details... |
1.7km |
15/03/2022 |
CONDITIONAL |
Cloonagleavragh , Easkey , Co. Sligo |
development consisting of construction of a loose shed, walled silage slab & slatted cubicle shed with underground slurry storage tank along with all associated site works... login required. |
Details... |
2.8km |
07/03/2022 |
CONDITIONAL |
Ballymeeney Td , Dromore West , Co. Sligo |
development consisting of permission for the following: (1) Construct dwelling house, effluent treatment system and percolation area (2) Construct domestic garage/shed (3) Carry out all ancillary site works... login required. |
Details... |
2.3km |
28/02/2022 |
REFUSED |
Killeenduff , Easkey , Co Sligo |
Development consisting of the construction of a new Agricultural Machinery Shed including all other ancillary site work and services... login required. |
Details... |
1.3km |
19/08/2021 |
CONDITIONAL |
Killeenduff , Easkey , Co. Sligo |
development consisting of (1) demolition of existing buildings (2) construction of a new roofed manure pit, 4 bay enclosed dry shed with storage/office space, walled silage slab, roofed handling facility and 6 bay enclosed dry bedded shed along with all associated site works... login required. |
Details... |