1.3km |
18/09/2023 |
CONDITIONAL |
Farragh , Killala , Co.Mayo |
The application will consist of planning permission to (1) Demolish part of existing house and existing porch, (2) Demolish existing shed, (3) Construct extension and carry out alteratio... login required. |
Details... |
2.9km |
10/07/2023 |
N/A |
Old Ashai Plant , Killala Business Park , Killala |
The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the south of the site ,will consist of a Double Storey Electrolyser Building of up to 24m height; Fin Fan Coolers of up to 10.5m height; Hydrogen Storage Area of 7m height; Hydrogen Gas Tube Filling Station of up to 9m height, Gas Injection Compound and Gas Above Ground Installation Building of 4m height; Electrical Substation up to 15m height and Ancillary Equipment Building of up to 3m height; Fire Water Tank of up to 14m height; Pump House of up to 5m height; Administration/welfare building and control block building of up to 4m height.
The Energy Centre, to the north of the site, will consist of 9no. Gas Engines generating up to 106MW of power, housed in a Gas Engine Building of up to 13.6m height with two stacks of up to 25m height, Distillate fuel tank of up to 11.2m height, Firewater tank of up to 10m height, associated pumps, sludge tank of 2.1m height and Pump house of 5... login required. |
Details... |
2.6km |
13/06/2023 |
CONDITIONAL |
Killybrone , Killala , Co.Mayo |
The application will consist of planning permission to (1) Construct new Domestic Garage, and (2) Carry out all required ancillary works on site.... login required. |
Details... |
1.9km |
22/05/2023 |
CONDITIONAL |
Mullafarry Townland , Killala , Co. Mayo |
The development will consist of an Inert Waste Recovery Facility within an application area of c. 1.8 Ha.... login required. |
Details... |
2.9km |
21/04/2023 |
N/A |
The townlands of Tawnaghmore Lower and Meelick , Killala , Ballina |
The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the south of the site ,will consist of a Double Storey Electrolyser Building of up to 24m height; Fin Fan Coolers of up to 10.5m height; Hydrogen Storage Area of 7m height; Hydrogen Gas Tube Filling Station of up to 9m height, Gas Injection Compound and Gas Above Ground Installation Building of 4m height; Electrical Substation up to 8m height and Ancillary Equipment Building of up to 3m height; Fire Water Tank of up to 14m height; Pump House of up to 5m height; Administration/welfare building and control block building of up to 4m height.
The Energy Centre, to the north of the site, will consist of 9no. Gas Engines generating up to 106MW of power, housed in a Gas Engine Building of up to 13.6m height with two stacks of up to 25m height, Distillate fuel tank of up to 11.2m height, Firewater tank of up to 10m height, associated pumps, sludge tank of 2.1m height and Pump house of 5m Height, ... login required. |
Details... |
1.7km |
27/02/2023 |
CONDITIONAL |
Castlereagh , Killala , Co. Mayo |
Change of house type to that as granted previously under P18/495 ... login required. |
Details... |
1.7km |
22/02/2023 |
CONDITIONAL |
Castlereagh , Killala |
change of house type to that as granted previously under planning reference P18/496... login required. |
Details... |
1.1km |
13/12/2022 |
CONDITIONAL |
Rathcash , Killala |
demolish existing detached dwelling house, construct replacement detached dwelling house, construct domestic shed (adjoining existing shed) together with all associated site works... login required. |
Details... |
1.2km |
09/06/2022 |
CONDITIONAL |
RATHOWEN EAST , KILLALA , CO. MAYO |
CONSTRUCT NEW CLUBHOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA INCLUDING ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.1km |
15/12/2021 |
CONDITIONAL |
LEADYMORE , KILLALA , CO. MAYO |
CONSTRUCTION OF A WALLED SILAGE SLAB AND SLATTED CUBICLE SHED AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
1.8km |
08/12/2021 |
CONDITIONAL |
MULLARRY & CLOONAWILLIN , KILLALA |
1.0 HECTARE EXTENSION TO AN EXISTING AUTHORISED QUARRY AND WILL COMPRISE OF THE FOLLOWING: EXTRACTION OF MATERIAL BY BLASTING MEANS DOWN TO A LEVEL OF -2.0mOD; TRANSPORTATION OF EXTRACTED MATERI... login required. |
Details... |
2.1km |
18/10/2021 |
N/A |
LEADYMORE , KILLALA , CO MAYO |
CONSTRUCTION OF A WALLED SILAGE SLAB AND SLATTED CUBICLE SHED AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.2km |
20/08/2021 |
CONDITIONAL |
CASTLEREAGH , KILLALA |
DEMOLISH EXISTING DETACHED DWELLING HOUSE, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
13/08/2021 |
CONDITIONAL |
TONROE UPPER , KINCON , BALLINA |
RETAIN EXISTING DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DETACHED DOMESTIC SHED INCLUDING ALL ANCILLARY SITE WORKS ... login required. |
Details... |
1.9km |
23/07/2021 |
CONDITIONAL |
FARRAGH , KILLALA |
EXTEND AND RECONSTRUCT DWELLING HOUSE, CONSTRUCT DOMESTIC GARAGE, RETAIN MINOR ALTERATIONS TO INCLUDE GABLE WINDOW, RETAIN EXTENSION TO REAR OF DWELLING HOUSE... login required. |
Details... |
1.9km |
22/07/2021 |
CONDITIONAL |
FARRAGH , KILLALA |
REVISIONS TO AN EXISTING GRANT OF PERMISSION REF. NO. P11/824 & P11/8240. THE PROPOSED REVISIONS INCLUDE FOR: (1) CHANGE OF HOUSE TYPE AND DESIGN TO PREVIOUSLY GRANTED. (2) REVISIONS TO THE SITE LAYOUT TO INC... login required. |
Details... |
2km |
01/07/2021 |
CONDITIONAL |
MULLAFARRY TD , KILLALA |
CONTINUED USE AND OPERATION OF THE EXISTING LIMESTONE QUARRY (C. 3.97 HA) INCLUDING WHEELWASH, SETTLEMENT LAGOONS, PORTABLE OFFICE, WORKSHOP AND ALL ASSOCIA... login required. |
Details... |
1.7km |
13/04/2021 |
CONDITIONAL |
MULLAFARRY , KILLALA , CO MAYO |
FILLING OF LANDS WITH INERT WASTE FOR THE PURPOSE OF QUARRY RESTORATION, AND ALL ASSOCIATED ANCILLARY WORKS... login required. |
Details... |