1.2km |
24/04/2025 |
N/A |
Brews Hill , Townparks , Navan |
The development will consist of partial demolition of the existing school building to allow the connection of a new part 3 storey, part single storey extension comprising five classrooms, specialist rooms, GP Dining area, PE Hall, toilets, stores and associated ancillary accommodation.?The development ... login required. |
Details... |
1.9km |
22/04/2025 |
N/A |
Belmount , Academy Street , Limekilhill Navan Co Meath |
EXTENSION OF DURATION OF PLANNING PERMISSION ABP Ref: 306021-19. (SHD) The construction of a residential development of 544 no. dwellings, 2 no. creches & open space areas as follows: A) 260 no. houses comprising; 18 no. 2 bed houses, 207 no. 3 bed houses, 35 no. 4 bed houses B) 198 no. apartments in 5 no. buildings (Block A - 5 storeys with a 6 storey setback, Block B – 6 storeys, Block C – 5 storeys, fronting onto Academy Street, Block D – 3 and 4 storeys & Block E – 4 storeys) comprising 46 no. 1 bed apartments & 152 no. 2 bed apartments; C) 15 no. 2 bed duplex apartments & 15 no. 3 bed duplex apartments in 3 no. 3 storey buildings; D) 8 no. 5 dwelling 3 storey corner blocks (each comprising, 1 no. 1 bed apartment, 2 no. 2 bed apartment & 2 no. 3 bed units) – 40 no. units in total; E) 2 no. 8 dwelling 3 storey corner blocks (each comprising 4 no. 1 bedroom and 4 no. 2 bedroom units) – 16 no. units in total; F) Provision of 2 no. creches, ESB kiosks, associated single storey bicycle storage & refuse storage buildings; G) Provision of open space within the development (including playground areas & communal open space areas); H) Access from 3 no. new junctions onto Academy Street, & a new pedestrian access onto the D... login required. |
Details... |
540m |
12/04/2025 |
N/A |
5 – 16 Sycamore Abbey Flower Hill , Navan , Co. Meath |
Minor internal & elevational changes to approved apartment block (Ref. No.: NA190283)... login required. |
Details... |
2.8km |
10/04/2025 |
N/A |
Liscartan , Navan , Co. Meath |
planning application for permission for the construction of a single storey detached dwelling including wastewater treatment system and percolation area, new entrance onto public road and all associated site works ... login required. |
Details... |
620m |
02/04/2025 |
N/A |
Navan Town Centre , Abbey Road , Navan Co. Meath |
change of use at ground floor level from retail and at first floor level from offices to day care services for people with disabilities, including offices and ancillary use, erect new signage and all ancillary and associated works... login required. |
Details... |
1.5km |
23/03/2025 |
N/A |
70 Woodlands , Dillonsland , Navan |
Retention Planning Application for existing Storage Sheds and Conservatory to rear of Dwelling at 70 Woodlands, Dillonsland, Navan C15 Y6Y1... login required. |
Details... |
180m |
21/03/2025 |
N/A |
131A Silverlawn , Navan , Co. Meath |
the development will consist of the following: (1) to demolish an existing domestic store and site boundary walls (2) to construct a detached two storey dwelling (3) to construct a new site entrance and boundary walls (4) to connect to all mains services (5) and all ancillary site development works... login required. |
Details... |
1km |
21/03/2025 |
N/A |
28 Blackcastle Demense , Navan , Co. Meath |
The proposed works consist of: Widen existing entrance and driveway to facilitate additional vehicular parking on site, together with all associated siteworks.... login required. |
Details... |
1.2km |
21/03/2025 |
N/A |
60 Academy Street , Navan , Co. Meath |
The proposed works consist of:
(a) Demolish existing single storey rear extension.
(b) Construct a two storey rear extension.
(c) Form a 1 bedroom apartment at ground floor level.
(d) Form a 1 bedroom apartment at first floor level.
(e) Together with all associated siteworks.... login required. |
Details... |
1.3km |
07/03/2025 |
N/A |
Bru na hAbhainn , Blackcastle Demesne Blackcastle , Slane Road Navan Co. Meath |
the construction of 4 No. Apartments (3 No. two bed and 1 No. one bed), car parking, connection to existing services and all ancillary site development works ... login required. |
Details... |
930m |
06/03/2025 |
N/A |
Geoghegan's , 23/24 Trimgate Street , Navan Co Meath C15 DN47 |
The development will consist of (1) demolition of a single-storey storeroom extension to the rear /side of the premises, and demolition of a single storey store-room located in the existing yard/ car parking area to the rear of the premises (2) the construction of a part single-storey, part two-storey extension to provide increased storage space, new office space and improved staff facilities for Geoghegan’s (3) internal alterations to the existing premises, and (4) provisio... login required. |
Details... |
2.4km |
05/03/2025 |
CONDITIONAL |
Navan Wastewater Treatment Works , Ferganstown and Ballymacon , Boyne Road |
10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of covers to existing primary settlement tanks; ... login required. |
Details... |
860m |
05/03/2025 |
N/A |
Windtown / Proudstown Link Road , Clonmagadden Park Navan , Co. Meath |
to construct 1 no. two storey semi detached building (two dwelling units) with connection to existing mains services, extend existing service road, construct boundary walls and complete all ancillary site works... login required. |
Details... |
640m |
27/02/2025 |
N/A |
Mill Lane Navan Co. Meath , A site located between Distillery Quay Apartments to the north-west Pollboy Gate Mixed Use Building to the south-east , and with frontage onto the River Blackwater to the south-west. |
The development will consist of:
• Construction of a five storey over split level basement building, with top floor set-back, to provide 25no. short term tourist letting accommodation units consisting of 24no. 1 bedroom and 1no. 2 bedroom units); To include ESB substation, common room, reception and staff facilities at ground floor and common room, gym and plant room at fourth floor level;
• To include external terraces at ground floor to the rear serving common room and accommodation units; external balconies at first, second and third floors to the front and rear serving accommodation units; external roof terraces at fourth floor serving common room and gym to the rear / side and serving accommodation units to the front / side at this level;
• Split basement level to provide 18no. car spaces accessed through new opening from Distillery Quay apartments basement car park an... login required. |
Details... |
640m |
21/02/2025 |
N/A |
Mill Lane Navan Co. Meath , A site located between Distillery Quay Apartments to the north-west Pollboy Gate Mixed Use Building to the south-east , and with frontage onto the River Blackwater to the south-west. |
The development will consist of:
• Construction of a five storey over split level basement building, with top floor set-back, to provide 25no. short term tourist letting accommodation units consisting of 24no. 1 bedroom and 1no. 2 bedroom units); To include ESB substation, common room, reception and staff facilities at ground floor and common room, gym and plant room at fourth floor level;
• To include external terraces at ground floor to the rear serving common room and accommodation units; external balconies at first, second and third floors to the front and rear serving accommodation units; external roof terraces at fourth floor serving common room and gym to the rear / side and serving accommoda... login required. |
Details... |
860m |
14/02/2025 |
N/A |
Windtown / Proudstown Link Road , Clonmagadden Park Navan , Co. Meath |
the development consists of to construct 1 no. two storey semidetached building (two dwelling units) with connection to existing mains services, extend existing service road, construct boundary walls and complete all ancillary site works... login required. |
Details... |
1.4km |
14/02/2025 |
REFUSED |
No.1 Connolly Avenue , Navan , Co. Meath C15 P5C6 |
the development will consist of (1) the demolition of existing single story extensions to the side and rear of existing dwelling (2) alterations to existing dwelling in... login required. |
Details... |
1.2km |
07/02/2025 |
N/A |
1 Dunloe Avenue , Windtown , Co. Meath C15 YDV5 |
the conversion of an existing detached garage (area of 24.9m²) located at the rear of the dwelling into a home office with sanitary and changing facilities, alterations to the garage front elevation, and associated works... login required. |
Details... |
1.4km |
04/02/2025 |
N/A |
No.1 Connolly Avenue , Navan , Co. Meath C15 P5C6 |
the development will consist of (1) the demolition of existing single story extensions to the side and rear of existing dwelling (2) alterations to existing dwelling in... login required. |
Details... |