1.3km |
18/04/2025 |
N/A |
Lands adjacent to Unit 900, Northwest Logistics Park, Ballycoolin, Dublin 15. |
We, Earlsland Corporation Unlimited Company, intend to apply for planning permission for development on lands adjacent to Unit 900, Northwest Logistics Park, Ballycoolin, Dublin 15. The application si... login required. |
Details... |
2.8km |
15/04/2025 |
N/A |
1 Chapelwood Drive, Hollystown, Dublin 15, D15 HP21 |
The development will consist of an increase in the maximum number of children to be accommodated in the existing Creche from 50 at any one time ( as conditioned within Condition No.4 of the Grant of P... login required. |
Details... |
1.7km |
14/04/2025 |
N/A |
Unit 3.1, Osprey House, Dublin Airport Logistics Park, St. Margarets, Co. Dublin |
Permission for Retention of alterations to the rear façade and marshalling yard of Industrial Logistics Warehouse. The alterations consist of the reconfiguration and relocation of permitted loading d... login required. |
Details... |
2km |
28/03/2025 |
N/A |
Hollymount, Spricklestown, The Ward, Co. Dublin, D11 T208 |
The development will consist of: Relocation of the front vehicular access. Addition of a new front canopy over a reoriented front-facing door. Installation of a new gable window on the front side and... login required. |
Details... |
2.5km |
27/03/2025 |
N/A |
St. Margarets GAA Club, Kilreesk, St. Margarets, Co. Dublin, K67 EY27 |
The Development consists of an extension at ground floor of 289 sq.m. consisting of a meeting room , club shop, office and storage areas and the provision of a viewing terrace at first floor with a le... login required. |
Details... |
2.5km |
27/03/2025 |
N/A |
St. Margarets GAA Club, Kilreesk, St. Margarets, Co. Dublin, K67 EY27 |
The development consists of an extension at ground floor of 289 sq.m. consisting of a meeting room, club shop, office and storage areas and the provision of a viewing terrace at first floor with a lea... login required. |
Details... |
2.5km |
21/03/2025 |
N/A |
Kilreesk, St. Margaret's, Co. Dublin |
The development consists of an extension at ground floor of 289 sq.m. consisting of a meeting room, club shop, office and storage areas and the provision of viewing terrace at first floor with a lean ... login required. |
Details... |
2.5km |
21/03/2025 |
Invalid Application |
Kilreesk, St. Margaret's, Co. Dublin |
The development consists of an extension at ground floor of 289 sq.m. ... login required. |
Details... |
1.8km |
07/03/2025 |
N/A |
Huntstown Powerstation, Huntstown, Co. Dublin |
The replacement of approx. 251 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates and all associated site works.... login required. |
Details... |
1.8km |
07/03/2025 |
N/A |
Huntstown Powerstation, Huntstown, Co. Dublin |
The replacement of approx. 251 m of existing 2.4 m high chainlink peri... login required. |
Details... |
1.3km |
04/03/2025 |
Invalid Application |
Maersk Unit No. 3, Quantum Distribution Park, Newtown, Kilshane Cross, |
Retention permission is sought for development at c.3.23 Ha site at Ma... login required. |
Details... |
1.3km |
04/03/2025 |
N/A |
Maersk Unit No. 3, Quantum Distribution Park, Newtown, Kilshane Cross, Dublin 11 |
Retention permission is sought for development at c.3.23 Ha site at Maersk for the following modifications to Unit No. 3: a new staff entrance with a new external canopy provided over the entrance (no... login required. |
Details... |
990m |
21/02/2025 |
N/A |
Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west of the N2 interchange with the Cherryhound-Tyrrelstown M2/M3 Link Road, Townland of Cherryhound,, the Ward, County Dublin |
Planning permission is sought for the proposed development that will consist of the installation of 1 no. temporary signage structure with uplighting, mounted on a lightweight steel structure over a c... login required. |
Details... |
990m |
21/02/2025 |
N/A |
Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west of |
The proposed development will consist of the installation of 1 no. tem... login required. |
Details... |
1.8km |
14/01/2025 |
Invalid Application |
Huntstown Power Station, Huntstown, Co. Dublin |
Permission for works to an existing Above Ground Natural Gas Installat... login required. |
Details... |
1.8km |
14/01/2025 |
N/A |
Huntstown Power Station, Huntstown, Co. Dublin |
Permission for works to an existing Above Ground Natural Gas Installation at Huntstown Power Station. The works will consist of the replacement of approx. 251 m of existing 2.4 m high chainlink perim... login required. |
Details... |
2.6km |
23/12/2024 |
APPLICATION DECLARED INVALID |
Huntstown Power Station, Huntstown, Co. Dublin |
***OUTSIDE DCC JURISDICTION***The replacement of approx. 251 m of existing 2.4 m high chainlink perimeter fencing and associated access/emergency gates with new 2.4 m high security fencing, gates and all associated site works.... login required. |
Details... |
1.4km |
19/12/2024 |
GRANT PERMISSION |
O'Toole Transport, Bay Lane, Hollywoodrath, D15 WDN7 |
The development will consist of an extension to the existing facility ... login required. |
Details... |
1.5km |
19/12/2024 |
N/A |
O'Toole Transport, Bay Lane, Hollywoodrath, D15 WDN7 |
The development will consist of an extension to the existing facility of 2112m2 warehousing cold storage with 39m2 dispatch office, an extension to truck park area to northeast boundary and all associ... login required. |
Details... |
2.6km |
18/12/2024 |
Invalid Application |
5 The Oaks,, Hollystown,, Dublin 15, D15X2D0 |
Retention planning permission for a 1.Detached single storey garage co... login required. |
Details... |