2.7km |
17/04/2024 |
N/A |
7 Elder Heath Green, Kiltipper, Dublin, D24 X5DP |
Garden Room/Home Office... login required. |
Details... |
1.7km |
10/04/2024 |
N/A |
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24 |
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (218sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.... login required. |
Details... |
2.8km |
27/03/2024 |
N/A |
3, Elder Heath Hill, Killinardan, Dublin 24 |
Retention for 3 no. roof lights (2 facing east a 1 facing south). A detached garden room of 16sq.m floor area. Permission for a rear, ground floor extension of 22sq.m floor area with a stove flue. A gable window facing south at attic level.... login required. |
Details... |
2.4km |
26/03/2024 |
N/A |
The Green Isle Hotel, Boot Road, Clondalkin, Dublin 22 |
Retention permission for the removal of existing scrub plantation and for the plantation and for the placing of clean broken stone at ground level, for the creation of an overflow carparking area for work vehicles and buses and for the erection of a green mesh fence and galvanised palisade... login required. |
Details... |
320m |
15/02/2024 |
REQUEST ADDITIONAL INFORMATION |
Unit 2, Buildings 2 & 3, Cookstown Industrial Estate, Dublin 24. |
Change of use from Warehouse to Gym facility, with minor internal modifications including reception area, changing/shower rooms, studio and office all with associated and ancillary site works and external signage.... login required. |
Details... |
270m |
09/02/2024 |
GRANT PERMISSION |
Unit 5 & 8, Building 2 & 3, Cookstown Industrial Estate, Tallaght, Dublin 24 |
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.... login required. |
Details... |
390m |
09/02/2024 |
DECLARED NOT EXEMPT |
Unit 11, Cookstown Enterprise Centre, Tallaght, Dublin 24, 24 YHF5 |
Car Park Space within gated compound locked at certain hours. Looking to put container within space.... login required. |
Details... |
240m |
26/01/2024 |
GRANT PERMISSION FOR RETENTION |
A9, Cookstown Business Centre, Tallaght, Dublin 24, D24 Y171 |
Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m... login required. |
Details... |
3km |
02/01/2024 |
REFUSE PERMISSION |
Thomas Davis GAA Club, Kiltipper Road, Tallaght, Co. Dublin |
Install a 21 metre monopole carrying telecommunications and broadband equipment, together with associated equipment and cabinets enclosed within a 2.4 metre palisade fence compound at Thomas Davis GAA Club, Kiltipper Road, Tallaght, Dublin.... login required. |
Details... |
470m |
12/12/2023 |
GRANT PERMISSION |
321, The Lawn, Belgard Heights, Tallaght, Dublin 24, D24T6W3 |
Construction of first floor side extension over previously converted garage. Works will consist of construction of bedroom with en-suite and associated works... login required. |
Details... |
350m |
07/12/2023 |
GRANT PERMISSION |
B&Q, Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, D24 W5RV. |
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.... login required. |
Details... |
1.6km |
18/10/2023 |
GRANT PERMISSION |
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24 |
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement ... login required. |
Details... |
2.7km |
29/09/2023 |
GRANT PERMISSION |
At Bus stop No. 5121 Green Isle Road, (outside Corkagh Park), Kingswood, Dublin 22 |
Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.... login required. |
Details... |
70m |
25/08/2023 |
REFUSE PERMISSION |
Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24 |
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision... login required. |
Details... |
1.3km |
24/08/2023 |
GRANT PERMISSION |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
Demolition of an existing electrical switch room, boiler rooms and existing single storey office building and two associated modern extensions at the rear of the existing Coach House and Stables Buildings; Works to the Coach House and Stables Buildings (currently in office use) include the removal of existing modern interventions (internally & externally) and to restore the buildings to their earlier character when used as stables and coach house; Works include replacement of modern windows and doors with historically accurate ones, lime rendering of external walls, replacement of concrete roof tiles with natural slate and of modern gutters and downpipes; Some modern wall opes will be closed as blind windows; Internally, modern office layouts will be removed and replaced with earlier stables and loft layouts; The change of use of the buildings from office to exhibition/display spaces; Works to the derelict Gardener's Cottage will include its reconstruction based on photographic evidence to reflect its earlier appearance, while the modern windows and door will be removed from the adjacent Cart House to return it to its earlier form, all for use as exhibition/display spaces; Works to the existing two storey Finance Building include altering its south-eastern fa9ade to align with a new courtyard dividing wall, replacing the existing facade with a new glazing system along with solid elements of render, stone & zinc cladding; The internal l... login required. |
Details... |
70m |
10/08/2023 |
INVALIDATE APPLICATION |
Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24 |
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision... login required. |
Details... |
230m |
04/08/2023 |
GRANT PERMISSION FOR RETENTION |
Building 1, Units 1a, 1b, 1c, Buildings 81a and 81b, Cookstown Estate Road, & Buildings 2 & 3, at Old Belgard Rd, Cookstown Industrial Estate, Dublin 24 |
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant ... login required. |
Details... |
1.4km |
27/06/2023 |
GRANT PERMISSION |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
Removal of the three existing grounds keeping sheds and a portacabin unit and replacement of these with a new single building facility in the same location to contain all staff and storage requirements for the groundskeeping and maintenance of the Belgard Castle Estate; The proposed building is 795sq.m in area and consists of areas for storage of machinery ground maintenance equipment, general storerooms and a mechanical and electrical plant room; A part mezzanine floor will provide for additional storage space at first floor; Staff facilities to be provided include for an office area, a canteen, changing/locker rooms with toilets and showe... login required. |
Details... |
390m |
07/06/2023 |
GRANT PERMISSION |
Plot Adjacent 4 Colberts Fort, Tallaght, Dublin 24. |
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.... login required. |
Details... |
380m |
28/04/2023 |
GRANT PERMISSION |
Glen Abbey Complex, Belgard Road, Dublin 24 |
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay amb... login required. |
Details... |