Skip to main content
Our Subscriber Plan is now 50% off Discount expires on Friday, 19 June 2026. Get in touch about our Business Accounts and generate a free test alert.

a 1.6654 Ha site incorporating Unit 1 Esprit Logistics Park , Moortown , Celbridge

Jun 10 2025

Application Received

Jul 30 2025

Further Info. Requested

Sep 02 2025

Further Info. Received

Oct 03 2025

Decision

Oct 05 2025

Decision Due

Nov 17 2025

Granted

Nov 16 2030

Expiry (if required)
  • Submitted: 10 / 06 / 2025
  • Application Type:
    PERMISSION
  • Application Status:
    APPLICATION FINALISED
  • Council Decision:
    CONDITIONAL (Granted)

Useful Links:

Development Description:

for amendments to the Warehouse and Light Industrial Development permitted under Kildare County Council Reg. Ref. 22/627 (as amended by Kildare County Council Reg. Ref. 24/87 and 24/88 and proposed to be amended by Kildare County Council Reg. Ref. 25/60553 and 25/60601) and amendments to an existing Maintenance Station-Aviation Industry Light Industrial Unit (currently operated by Lufthansa Technik). The amendments principally comprise: the omission of Unit A (a permitted Warehouse with a Gross Floor Area of 2,708 sq m) and the relocation of the existing delivery yard and select existing car parking spaces to facilitate the construction of an extension to the existing Maintenance Station-Aviation Industry Light Industrial Unit. The extension, which requires the removal of the existing northwest facing gable wall (17.6 sq m), will have a maximum height of 13.15 metres and a Gross Floor Area of 3,990 sq m (resulting in the overall Maintenance Station-Aviation Industry Light Industrial Unit having a Total Gross Floor Area of 7,710 sq m). The development will also include: the decommissioning of the existing site entrance to / exit from the Maintenance Station-Aviation Industry Light Industrial Unit in Esprit Logistics Park. Access to / egress from the proposed extended Maintenance Station-Aviation Industry Light Industrial Unit will be via the proposed reconfigured permitted Unit A site access / egress. The development will also include: the omission of the permitted height restrictor at the site access / egress at the R405; the provision of 21 No. car parking spaces in lieu of the 27 No. previously permitted to serve Unit A (resulting in the overall Maintenance Station-Aviation Industry Light Industrial Unit having 101 No. car parking spaces); gates; canopy; plant; modifications to the permitted hard and soft landscaping and boundary treatments; and all associated site and development works above and below ground. Revised by Significant Further Information which consists of: elevational changes including the addition of green walls, revised curtain walling, windows, and cladding; landscape modifications including planted landscaped berms and additional planting; modifications to boundary treatments and gates; changes to the car parking layout and the addition of zebra crossings

Nearby Applications:

Appeals / Commencement

No Appeals Found

Decision Appealed:

  • Appeal Submitted:
  • Appeal Status:
  • Appeal Decision:
  • An Coimisiún Pleanála File Ref.:
  • Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.

No Commencement Found

Commencement Information:

Copyright:

Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.