620m |
07/05/2025 |
No Data |
Ballybeg Rathnew |
construction of 61 dwellings, new entrance to public road, connection to all services and associate works including roads, footpaths, boundaries and boundaries treatments, open spaces and landscaping, attenuation areas... login required. |
Details... |
2km |
25/04/2025 |
New Application |
Ashford Co. Wicklow |
sports and recreation hub for Ashford Village. The development is comprised of the change of use and alterations/extension to the former detached Garda Barracks building (protected structure) to accommodate a multi-purpose community indoor sports and rec... login required. |
Details... |
1.1km |
24/04/2025 |
New Application |
Ballinaclogh Ballynabarny |
the development of grid connection infrastructure comprising the laying of ca. 3.3 kilometres (3,300 metres) of Medium Voltage underground electricity cables and associated infrastructure substantially under public roads and private lands to connect the ... login required. |
Details... |
2km |
15/04/2025 |
New Application |
Ballyknockan Beg Glenealy |
proposed conversion and refurbishment of existing farm buildings to four holiday cottages for agri-tourism, development of a courtyard with play area, car parking, waste water treatment system to EPA standards, connection to watermains, and associated wo... login required. |
Details... |
470m |
02/04/2025 |
New Application |
Milltown Shopping Park Milltown South |
alterations and extension and associated site works to existing warehouse... login required. |
Details... |
2.4km |
01/04/2025 |
New Application |
5 Abbey Rise Ballynerrin |
an attic conversion with dormer window to the rear, 1no roof light to the front of the existing house, relocation of existing solar panels and internal modifications for a new stairs access... login required. |
Details... |
1.2km |
27/03/2025 |
New Application |
4 Ashford Oaks Ballinalea |
to replace an existing window at first floor to the rear elevation with a double door screen for access to a new 14.57msq balcony with 2m high obscured glazing panels to balcony perimeter at south west and south east elevations to eliminate overlooking n... login required. |
Details... |
840m |
25/03/2025 |
New Application |
30, 31, 32, 33, 34 Units South Point Business Park |
• the approved block which comprises of units 33 and 34 (c.1086 sq.m) to be removed and the approved block which comprises of units 30, 31 & 32 (c. 1,623 sq.m) to be amalgamation into one block to facilitate the provision of a single industrial unit (c. ... login required. |
Details... |
1.3km |
19/03/2025 |
Further Information |
58 Seaview Cottages Ballybeg, Rathnew |
alterations and extension to an existing 53m2 dwelling. The works will include the following- 1. Demolition of an existing rear extension(habitable) circa 6 sq.m as well as the demolition of existing sheds (non-habitable) measuring 29.27 sq.m. . 2. The c... login required. |
Details... |
840m |
19/03/2025 |
Incomplete Application |
N11 South Point Business Park Charvey Lane |
amendments to the permission granted by Wicklow County Council under Planning Ref. 21558, comprising: The amalgamation of 2 no. approved blocks (comprising units 30, 31, 32, 33 and 34) to facilitate the provision of a single Industrial Unit (c. 2,285 sq.... login required. |
Details... |
1.4km |
10/03/2025 |
New Application |
The Mews Ballinalea |
for existing single-storey rear and side extensions, as constructed, with a total area of circa 74msq, Permission for the demolition of the existing front porch and the construction of a new single-storey front studio/bedroom extension of 16.5m², Permiss... login required. |
Details... |
1.3km |
03/03/2025 |
Incomplete Application |
58 Seaview Cottages Ballybeg |
alterations and extension to an existing 53m2 dwelling. The works will include the following- 1. Demolition of an existing rear extension circa 6 sq.m. 2. The construction of a new single storey split level extension to side and rear of existing dwellin... login required. |
Details... |
1.1km |
27/02/2025 |
Incomplete Application |
Ballinaclogh Ballynabarny |
development of grid connection infrastructure comprising the laying of ca. 3.3 kilometres (3,300 metres) of medium voltage underground electricity cables and associated infrastructure substantially under public roads and private lands to connect the sola... login required. |
Details... |
1.6km |
06/02/2025 |
CONDITIONAL |
117 Saunders Lane , Rathnew , Co. Wicklow |
construction of a new flat roof single storey extension to side and rear; Internal alterations to the existing dwelling; New landscaping and associated site works... login required. |
Details... |
2km |
28/01/2025 |
CONDITIONAL |
Ballymacahara , Ashford , Co. Wicklow |
proposed farm dwelling, waste water treatment system to EPA standards, garage, entrance and associated works... login required. |
Details... |
680m |
15/01/2025 |
N/A |
Ballybeg , Rathnew , Co. Wicklow |
99 dwellings (8 no.1 bedroom, 18 no. 2 bedroom, 55 no. 3 bedroom and 18 no. 4 bedroom) and a creche (271 sq. m). The development includes the provision of services, visitor bicycle parki... login required. |
Details... |
670m |
07/01/2025 |
N/A |
Ballybeg , Rathnew , Co. Wicklow |
99 dwellings (8 no.1 bedroom, 18 no. 2 bedroom, 55 no. 3 bedroom and 18 no. 4 bedroom) and a creche (271 sq. m). The development includes the provision of services, visit... login required. |
Details... |
2.1km |
19/12/2024 |
N/A |
Broomhall , Rathnew , Co. Wicklow |
proposed development will principally consist of the construction of 87 No. residential units (16 No. 2-bed duplex units, 16 No. 3-bed duplex units, 51 No. 3-bed houses and 4 No. 4-bed houses) and a creche (c. 162 sq m). The proposed development will range in height from 2 No. to 3 No. storeys. The proposed development will also include: 166 No. car parking spaces; bicycle parking & stores; bin stores; ESB sub-station; hard and soft landscaping; boundary treatments; public lighting; PV panels; and all associated si... login required. |
Details... |
1.7km |
06/12/2024 |
N/A |
Mount Usher View , Main Street , Ashford |
modifications to substitute consent permission An Bord Pleanala Ref ABP-312283-21 including: Demolition of the existing partly constructed built structures(indicated as Block A and B in as-granted); Construction of new block A(4 storey):Consisting of 1no. commercial retail unit on the lower ground floor accessed from the street level, 1no.commercial retail unit and 1no.community library on the Upper Ground Floor accessed from public stairs, podium lift and 8 no.1 bed residential units over the first, second floors over podium accessed by private staircases. Construction of new block B(4 storey): Consisting of 24 residential units(8no. 1beds, 8no. 2bed Apartments, 8no. 3bed duplex apartments) at the upper ground level, first, second and third floors over podium accessed by private staircases. Construction of new Block B1(4 Storey) consisting of 6no. residential units(2no. 1beds, 2no. 2bed Apartments, 2no. 3bed duplex apartments) on the upper ground level, first, second and third floors over podium accessed by private staircases. No Modifications to be carried out on Blocks C and D consisting of 11no. 3-storey terraced houses with ground-floor offices as permitted by reference to ABP-312283-21... login required. |
Details... |