2.6km |
23/01/2025 |
N/A |
Arklow MD , |
erection of new over ground fibre optic cables on existing timber poles, the erection of new poles and associated fibre optic cables... login required. |
Details... |
2.3km |
14/01/2025 |
n/a |
Clonough, Ballylarkin |
Permission for retention of alterations to dwelling as a change to that... login required. |
Details... |
2.8km |
09/01/2025 |
n/a |
Coolgreany, Coolgreany |
Permission to construct 16 no. houses which will consist of the following: a) 13... login required. |
Details... |
700m |
03/12/2024 |
n/a |
Ashwood Upper, Ballylarkin |
Permission to erect a two storey dwelling with services and also... login required. |
Details... |
2.2km |
08/10/2024 |
CONDITIONAL |
Armstrong Timber Engineering Ltd , Kish Business Park Clogga Road , Arklow Co. Wicklow. |
saw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works... login required. |
Details... |
1km |
03/10/2024 |
n/a |
Scarnagh Upper, Ballylarkin |
Permission for retention of domestic garage building and permission to make... login required. |
Details... |
2.2km |
03/10/2024 |
N/A |
Armstrong Timber Engineering Ltd , Kish Business Park Clogga Road , Arklow Co. Wicklow |
saw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works... login required. |
Details... |
1.4km |
01/10/2024 |
N/A |
Curranstown Lower , Arklow , Co. Wicklow |
permission for: (a) construction of a new agricultural entrance (b) demolition of existing 2 bay shed (c) construction of a machinery shed
(d) construction of an ag... login required. |
Details... |
3km |
27/09/2024 |
n/a |
Knockbaun, Coolgreany |
(1) Permission for retention of alterations to dwelling... login required. |
Details... |
1.6km |
17/09/2024 |
CONDITIONAL |
Teach Beag , Curranstown , Arklow |
Permission for upgrade to existing sewage treatment system... login required. |
Details... |
1.4km |
23/08/2024 |
N/A |
Curranstown Lower , Arklow , Co. Wicklow |
construction of a fully serviced dormer dwelling house with detached domestic garage and associated site works and new access drive to existing shared entrance... login required. |
Details... |
1.4km |
19/08/2024 |
N/A |
Curranstown Lower , Arklow , Co. Wicklow |
construction of a fully serviced dormer dwelling house with detached domestic garage and associated site works and new access drive to existing shared entrance... login required. |
Details... |
1.5km |
19/07/2024 |
N/A |
Curranstown , Arklow , Co. Wicklow |
upgrade of septic tank... login required. |
Details... |
2.6km |
17/07/2024 |
N/A |
Ballinabanoge , Co. Wicklow |
a dwelling , garage, bored well, wastewater treatment system to current EPA standards and all associated ancillary site works and services... login required. |
Details... |
730m |
02/07/2024 |
n/a |
Scarnagh Lower, Ballylarkin |
Permission to erect a fully serviced dwelling house with domestic garage... login required. |
Details... |
2.8km |
25/06/2024 |
n/a |
Coolgreany, Coolgreany |
Permission to construct a 12 no. unit residential housing scheme which will... login required. |
Details... |
2.3km |
04/05/2024 |
CONDITIONAL |
Armstrong Timber Engineering , Kish Business Park , Arklow |
single storey industrial unit (Gross Area 945 Sqm) and all associated site works... login required. |
Details... |
2km |
26/04/2024 |
n/a |
Killowen Upper, Kilgorman |
Permission for the construction of a dwelling house and all associated site work... login required. |
Details... |
2km |
12/04/2024 |
n/a |
Killowen Upper, Kilgorman |
Permission for the construction of a dwelling house... login required. |
Details... |