2.5km |
12/05/2025 |
New Application |
Coolkenna Tullow |
retention of existing slatted tank and permission to construct another slatted tank and all associated site works in my farmyard... login required. |
Details... |
2.8km |
09/04/2025 |
New Application |
Coolkenno Tullow |
removal of the dormer windows to the front elevation... login required. |
Details... |
300m |
26/02/2025 |
Grant |
Killinure Tullow |
construct a single storey dwelling, garage, on site wastewater treatment system, percolation area, bored well, new domestic splayed entrance and driveway and all associated site development works... login required. |
Details... |
2.5km |
15/11/2024 |
N/A |
Munny Lower , Tullow , Co. Wicklow |
construction of a part two storey, part single storey dwelling, new entrance, appropriate waste water treatment system, bored well, single storey garage and
all ancillary site works and landscaping... login required. |
Details... |
920m |
12/11/2024 |
CONDITIONAL |
Killinure , Coolkenno , Tullow |
permission to construct an agricultural entrance and all associated works... login required. |
Details... |
1.9km |
24/09/2024 |
CONDITIONAL |
Coolkenno Sports Field , Coolkenna , Tullow |
a In Line Amplification Site which consists of 2 no. fibre equipment cabins, 2 no. emergency generators, security fencing, access via right of way and associated works... login required. |
Details... |
2.7km |
02/09/2024 |
N/A |
Ballyconnell , Ballyconnell , Co. Wicklow |
an agricultural entrance on to existing laneway, all ancillary site works and services... login required. |
Details... |
2.3km |
24/06/2024 |
N/A |
Ballyconnell , Co. Wicklow |
a treatment system and percolation area, 1 no. log cabin ( general storage) and a garage to the rear of existing dwelling and retention for a dormer style extension and single storey extensi... login required. |
Details... |
2.3km |
24/06/2024 |
REFUSED |
Ballyconnell , Co. Wicklow |
a treatment system and percolation area, 1 no. log cabin ( general storage) and a garage to the rear of existing dwelling and retention for a dormer style extension and single storey extensi... login required. |
Details... |
1.5km |
17/06/2024 |
N/A |
Killinure , Coolkenno , Tullow |
a dwelling house with services and all associated site works... login required. |
Details... |
2.7km |
13/03/2024 |
N/A |
Munny House , Tullow , Co. Carlow |
change of use to a ninety day plus rentable unit... login required. |
Details... |
2.7km |
29/01/2024 |
CONDITIONAL |
Barnacashel , Coolkenno , Co. Wicklow |
construct a slatted cattle shed with concrete aprons and all associated site works in my farmland... login required. |
Details... |
1.5km |
09/10/2023 |
N/A |
Killinure , Coolkenno , Tullow |
to construct a dwelling house with services and all associated site works... login required. |
Details... |
2.5km |
11/04/2023 |
CONDITIONAL |
Coolkenna , Tullow , Co. Wicklow |
to construct and install a slurry bag and all associated site works... login required. |
Details... |
2.7km |
14/02/2023 |
REFUSED |
Money Upper , Coolkenna , Co. Wicklow |
1) 3 no. glamping pods, 1 no. log cabin and existing toilet/shower block facility all for short term camping use 2) conversion of part of existing traditional stone building for use as kitchenette and games room as part of camping facilities and 3) Permissi... login required. |
Details... |
2.5km |
25/08/2022 |
CONDITIONAL |
Coolkenna , Tullow , Co. Wicklow |
(1) renovation of existing traditional workers dwelling in my existing farmyard with services (2) permission for extension to rear of existing traditional workers dwelling and (3) permission for change of use of same to short-term letting use with all associated site works... login required. |
Details... |
2.8km |
19/04/2022 |
REFUSED |
Money Upper , Coolkenna , Co. Wicklow |
change of use of 2 no. traditional stone buildings from agricultural use to commercial short term letting use consisting of 3 no. short term letting units with services and all associated site works... login required. |
Details... |