550m |
04/12/2024 |
N/A |
Shanavaughy , Ballacolla , Co Laois |
construct a dwelling house, waste water treatment system, percolation area, connection to public watermain, new splayed entrance and associated site work... login required. |
Details... |
2.5km |
03/12/2024 |
N/A |
Oldglass , Ballacolla , Co. Laois |
(1) Retention permission for Quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators. (2) Retention permission for the on-going temporary storage on the quarry of clean st... login required. |
Details... |
2.5km |
29/11/2024 |
N/A |
Oldglass , Ballacolla , Co. Laois |
(1) Retention permission for Quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators. (2) Retention permission for the on-going temporary storage on the quarry of clean st... login required. |
Details... |
2.8km |
11/11/2024 |
N/A |
Kilbreedy , Rathdowney , Co. Laois |
New dwelling house, garage, septic tank and percolation area, new site entrance, ancillary site services and all associated site works... login required. |
Details... |
2.8km |
07/11/2024 |
N/A |
Kilbreedy , Rathdowney , Co. Laois |
construct new dwelling house, garage, septic tank and percolation area, new site entrance, ancillary site services and all associated site works... login required. |
Details... |
1.7km |
11/10/2024 |
CONDITIONAL |
Cuffsborough , Ballacolla , Portlaoise Co. Laois |
construct: A. New Contemporary Style 3-bedroom Dormer Style House, with attached carport to be constructed in two phases. The first phase is for all ground floor accommodation and phase two is... login required. |
Details... |
1.7km |
26/09/2024 |
N/A |
Cuffsborough , Ballacolla , Portlaoise Co. Laois |
construct A. New Contemporary Style 3-bedroom Dormer Style House, with attached carport to be constructed in two phases. The first phase is for all ground floor accommodation and phase two is ... login required. |
Details... |
1.7km |
20/09/2024 |
N/A |
Cuffsborough , Ballacolla , Portlaoise Co. Laois |
A.Construct New Contemporary Style 3-bedroom Dormer Style House, with attached carport to be constructed in two phases. The first phase is for all ground floor accommodation and phase two is ... login required. |
Details... |
2.5km |
31/05/2024 |
N/A |
Oldglass , Ballacolla , Co. Laois |
(1) retain permission for quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators; (2) retention permission for the on-going temporary storage on the quarry of clean st... login required. |
Details... |
2.3km |
02/05/2024 |
CONDITIONAL |
Grantstown , Ballacolla , Co. Laois |
construct a dormer style dwelling house, domestic garage, septic tank and percolation area, new entrance and all associated and necessary site works... login required. |
Details... |
2.5km |
12/04/2024 |
N/A |
Oldglass , Ballacolla , Co. Laois |
(1) Retain Quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators. (2) Retain the on-going temporary storage on the quarry of clean stone from other qua... login required. |
Details... |
2.3km |
01/03/2024 |
CONDITIONAL |
OLDGLASS , GRANTSTOWN , BALLACOLLA CO. LAOIS |
CONSTRUCT A TWO-STOREY DWELLING HOUSE (IN TWO PHASES),
A DOMESTIC EFFLUENT TREATMENT SYSTEM, A NEW SITE ENTRANCE AND ANCILLARY SITE WORKS... login required. |
Details... |
2.3km |
09/02/2024 |
N/A |
OLDGLASS , GRANTSTOWN , BALLACOLLA CO. LAOIS |
construct a two-storey dwelling house (in two phases), a domestic effluent treatment system, a new site entrance and ancillary site works... login required. |
Details... |
2.3km |
22/01/2024 |
N/A |
Oldglass , Grantstown , Ballacolla |
construct a two-storey dwelling house (in two phases), a domestic effluent treatment system, a new site entrance and ancillary site works... login required. |
Details... |
2.3km |
05/01/2024 |
N/A |
Oldglass , Grantstown , Ballacolla |
construct a two-storey dwelling house (in two phases), a domestic effluent treatment system, a new site entrance and ancillary site works... login required. |
Details... |
2.3km |
14/12/2023 |
N/A |
Oldglass , Grantstown , Ballacolla |
construct a two-storey dwelling house (in two phases), a domestic effluent treatment system, a new site entrance and ancillary site works... login required. |
Details... |
2.5km |
21/09/2023 |
N/A |
Oldglass , Ballacolla , Co. Laois |
Retain Quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators. (2) Retention permission for the on-going temporary storage on the quarry of clean stone from ot... login required. |
Details... |
2.9km |
19/09/2023 |
CONDITIONAL |
Cruell , Ballacolla , Co. Laois |
Construct a single storey dwelling house, entrance, garage, septic tank with secondary treatment system and all associated site works... login required. |
Details... |
2.5km |
19/09/2023 |
N/A |
Oldglass , Ballacolla , Co. Laois |
(1) Retention permission for Quarrying of lands consisting of 2.48 hectares in area and permission for the extraction at the quarry with a maximum annual extraction rate of 1,000 tonnes, where the stone is extracted using standard 360 degree excavators. (2) Retention permission for the on-going temporary storage on the quarry of clean st... login required. |
Details... |