2.1km |
15/03/2024 |
N/A |
UPMC Whitfield Hospital , Cork Road Butlerstown North , Waterford |
for development consisting of a proposed exit onto the R680 Road along with associated site development works all adjoining to the existing hospital ... login required. |
Details... |
590m |
11/03/2024 |
N/A |
13 Tir Connell Close , Lismore Heights , Waterford |
for extension to front of existing property, attachment of existing garage space to house, removal of garage roof and to replace with flat roof to tie into the existing house.... login required. |
Details... |
590m |
22/02/2024 |
N/A |
Bausch + Lomb Ireland , Unit 424 – 425 IDA Industrial Estate , Cork Road Waterford |
the proposed 1-storey extension (348m² Approx.) to the Northern side, the Part 1-storey & Part 2-storey extension (3614m² Approx.) to the Northern & Eastern sides of the existing Bausch + Lomb Ireland facility. The extensions are to include new production facilities, storage areas, offices, link corridors and staff accommodation. This is also to include new ... login required. |
Details... |
250m |
20/02/2024 |
N/A |
IDA Industrial Park , Old Kilmeadan Road , Knockhouse Lower Waterford. |
Proposed solar PV energy development comprising the installation of solar photovoltaic (PV) panels on ground mounted frames/ support structures, underground cabling and ducting, inverters, client kiosk, security fencing, pole mounted CCTV cameras, landscaping, temporary... login required. |
Details... |
2.5km |
06/01/2024 |
CONDITIONAL |
Butlerstown GAA Club , Holycross Butlerstown , Waterford |
To erect an equipment shed/office, incl. landscaping and all associated site development works... login required. |
Details... |
680m |
11/12/2023 |
N/A |
Jabil Healthcare , Unit 210 IDA Waterford Industrial Park , Cork Road Waterford |
a) Internal alterations at first floor level of Building A to form additional floor space (616m2) including installation of associated rooflights & external windows; b) construction of a new entrance lobby (5.90m2) and fir... login required. |
Details... |
2.8km |
29/11/2023 |
N/A |
DAWN PORK & BACON , GRANNAGH BUSINESS COMPLEX GRANNAGH , WATERFORD CO KILKENNY |
for development at this site. The development will consist of : erecting a 2MW Wind Turbine, located to the southwest of our main building; the Wind Turbine will be installed with a hub height of 64 meters and a blade radius of 35.5 meters, with underground ducting connecting... login required. |
Details... |
910m |
29/11/2023 |
CONDITIONAL |
60 Pinewood Avenue , Hillview , Waterford |
The construction of a single storey extension to the side, modifications to the existing front elevation and all associated site works.... login required. |
Details... |
2.3km |
05/10/2023 |
CONDITIONAL |
Woodstown , Butlerstown , Waterford |
to erect a dwelling house with sewage treatment system & all ancillary works... login required. |
Details... |
1.6km |
04/10/2023 |
CONDITIONAL |
Costa Coffee Unit , Waterford Retail Park , Cork Road Butlerstown |
Provision of a drive-thru lane for the Costa Coffee Unit, including a canopy and service hatch on the southwestern side of the unit, a height restrictor/entrance barrier on the access lane, 3.5m wide drive-thru lane and associated hard and soft landscaping, resulting in the removal of 24 no. existing carparking spaces; Provision of associated s... login required. |
Details... |
1.5km |
29/08/2023 |
REFUSED |
Waterford Retail Park , Cork Road , Butlerstown North Waterford |
development which will consist of a standalone 3 storey building to accommodate medical related uses with all associated ancillary accommodation and standalone ESB substation (totalling 3490sqm gross floor area). Access will be from the existing Waterford Retail Park access on the Outer Ring Road through the existing car park where an additional 102 park... login required. |
Details... |
0m |
25/08/2023 |
CONDITIONAL |
IDA Industrial Park , Old Kilmeadan Road , Knockhouse Lower Waterford. |
Proposed single storey cold room extension and the provision of a single storey electrical switch room to the north of the site and to include all associa... login required. |
Details... |
10m |
01/08/2023 |
N/A |
IDA Industrial Park , Old Kilmeadan Road , Knockhouse Lower Waterford. |
Proposed single storey cold room extension and the provision of a single storey electrical switch room to the north of the site and to include all associated site works, drainage, alteration... login required. |
Details... |
550m |
31/07/2023 |
CONDITIONAL |
Units 212-215 Waterford Training Centre , Waterford Industrial Park Cork Road , Waterford |
for the demolition of an existing carpentry training facility, and for the construction of a new two-story replacement training facility building, comprising of a carpentry training workshop and classroom together with all associated site development works at... login required. |
Details... |
230m |
21/07/2023 |
CONDITIONAL |
Units 10b and 10c Cleaboy Business Park , Old Kilmeadan Road , Waterford |
of the amalgamation of the existing rear warehouse/storage areas only ... login required. |
Details... |
230m |
19/07/2023 |
N/A |
Units 10b and 10c Cleaboy Business Park , Old Kilmeadan Road , Waterford |
Indefinite retention of the amalgamation of the existing rear warehouse/storage areas only... login required. |
Details... |
830m |
14/07/2023 |
CONDITIONAL |
14 Greenbank , Ashley Court , Waterford |
the construction of a new extension to existing house at First Floor Level over the existing Playroom/Study. The proposed extension will consist of a new master bedroom with en-suite and walk-in wardrobe... login required. |
Details... |
2.1km |
05/07/2023 |
CONDITIONAL |
UPMC Whitfield Hospital , Cork Road Butlerstown North , Waterford |
Indefinite retention of 3 no. single storey temporary structures consisting of 1. Mobile MRI trailer unit with prefabricated link corridor (44.1m²); 2. Prefabricated building containin... login required. |
Details... |
960m |
06/06/2023 |
CONDITIONAL |
'Londis' Cleaboy Shopping Complex , Cleaboy Road , Waterford |
to construct a new small single storey extension (19 sq.m.) to the front of the existing shop, modifications to the front facade, signage and front/side elevations, together with all associated site development works... login required. |
Details... |
3km |
22/05/2023 |
N/A |
Mountneill , Mooncoin , Co Kilkenny |
to construct a new livestock shed with new slatted tank and all associated works... login required. |