1.1km |
18/07/2024 |
N/A |
Ballynoran , Carrick On Suir , Co. Tipperary |
the demolition of a single storey dwelling with basement section and stables and construction of a new single storey replacement dwelling, waste water treatment plant with percolation area and all other associated site works... login required. |
Details... |
1.1km |
12/07/2024 |
N/A |
Ballynoran , Carrick On Suir , Co. Tipperary |
the demolition of a single storey dwelling with basement section and stables. Construction of a new single storey replacement dwelling, waste water treatment plant with percolation area and all other associated site works... login required. |
Details... |
1.1km |
02/07/2024 |
N/A |
Ballynornan , Carrick On Suir , Co. Tipperary |
the demolition of a single storey dwelling with basement section and stables and construction of a new single storey replacement dwelling, waste water treatment plant with percolation area and all other associated site works... login required. |
Details... |
2.2km |
24/05/2024 |
REFUSED |
Ballynoran , Carrick on Suir , Co. Tipperary |
a single storey dwelling, tertiary wastewater treatment system and soil polishing filter, new entrance and all associated siteworks... login required. |
Details... |
2.2km |
13/05/2024 |
N/A |
Ballynoran , Carrick on Suir , Co. Tipperary |
the construction of a single storey dwelling, tertiary wastewater treatment system and soil polishing filter and all associated siteworks... login required. |
Details... |
2.6km |
20/10/2023 |
CONDITIONAL |
Ballyclogh , carrick-on-suir , Co. Waterford |
for a single storey dwelling, garage, entrance, driveway, wastewater treatment system, percolation area and all associated site development works at ... login required. |
Details... |
1.6km |
13/09/2023 |
CONDITIONAL |
Dove Hill Centre , Ballynoran , Co.Tipperary |
the change of use of the existing structure from its permitted use as a retail store to its proposed retained use as a storage warehouse. All landscaping and site works are included... login required. |
Details... |
220m |
13/07/2023 |
CONDITIONAL |
Ballydine , Kilsheelan , Co. Tipperary |
the existing temporary carpark (contractor carpark facility) and associated existing service roadway and existing compound area, comprising a mix of existing stone base and also tarmac surface treatment, and including existing site lighting installations, existing fencing, existing smoking shelter and existing bicycle rack. We also wish to apply for permission to extend the existing carpark by circa 2m to the east to accommodate the construction of 178 no permanent carparking spaces (which includes for the designation of 17 no. new e-car charging carparking spaces and 1 no. new combined disabled/e-car charging carparking space), upgrade of the existing surface finish to a tarmac finish as applicable throughout, installation of line markings and kerbing, drainage works includi... login required. |
Details... |
80m |
18/04/2023 |
CONDITIONAL |
Ballydine , Kilsheelan , Co. Tipperary |
the change of use of an existing storage facility to a 3D printing facility (manufacturing) with associated administration area/office, including new façade treatment and entrance canopy to the existing south-eastern elevation, new access doors to the north-eastern elevation, upgrade/replacement of all existing doors, new rooftop guardrail and roof ladder access system, new services compound, minor drainage work... login required. |
Details... |
220m |
22/11/2022 |
N/A |
Ballydine , Kilsheelan , Co. Tipperary |
the existing contractor carpark facility and associated service roadway, comprising a mix of existing stone base and also tarmac surface treatment, including 8 no. existing lighting poles, smoking shelter and bicycle rack. Planning permission is also sought for the extension of the existing contractor carpark by 2m to the east, upgrading of the existing surface finish to a tarmac finish throughout, installation of line markings and kerbing to accommodate the construction of 178 no. permanent carparking spaces which includes for the designation of 18 no. new e-car charging carparking spaces and 1 no. new d... login required. |
Details... |
2.1km |
07/09/2022 |
CONDITIONAL |
Manganstown , Kilsheelan , Clonmel Co. Tipperary |
the construction of straw storage shed, a farmyard manure store, a milking parlour extension, and an underground slatted tank together with all associated concrete yards, walls and site works and to demolish a farmyard manure store, also RETENTION PERMISSION for a milking parlour extension... login required. |
Details... |
920m |
16/03/2022 |
CONDITIONAL |
Ballynoran , Carrick on Suir |
To retain indefinitely the as constructed single storey domestic garage, single storey domestic shed and all associated site development works ... login required. |
Details... |
2.5km |
24/01/2022 |
N/A |
Ballinderry , Carrick-on-Suir , Co. Tipperary |
development will consist of: to construct a new 34.2 square meter single storey garage extension to an existing dwelling and all associated site works... login required. |
Details... |
2.5km |
08/12/2021 |
N/A |
Ballinderry , Carrick-on-Suir , Co. Tipperary |
development will consist of: to construct a new 34.2 square meter single storey garage extension to an existing dwelling and all associated site works... login required. |
Details... |
240m |
25/11/2021 |
CONDITIONAL |
Ballydine , Kilsheelan , Clonmel |
the development consists of a new modular computer server suite to the south of the existing administration building as described hereunder. The development consists of a proposed single-storey computer server suite sized approximately 195 square metres and approximately 3.4 metres high and located to the south of the existing administration building and to the east of the existing manufacturing site. These works include minor modifications to existing internal roads and paths and the use of existing temporary construction facilities including fencing, site lighting... login required. |
Details... |
2.5km |
22/09/2021 |
REFUSED |
The Cottage , Ballinaraha , Kilsheelan |
construction of a two storey extension consisting of kitchen, bedroom and balcony to the southern side, a new entrance porch, extension and new roof to existing utility shed to the eastern side and associated site works to the existing dwelling... login required. |
Details... |
650m |
14/09/2021 |
CONDITIONAL |
Ballydine , Kilsheelan , Clonmel |
development on this site of circa c.7.48 hectares. The development will consist of a 10-year permission for the construction of a Solar PV Energy Development comprising installation of Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries, underground cabling and ducting, 1 no. customer control building, 1 no. switchgear and transformer building, site perimeter (stock proof) security fence and associated access gates, mainten... login required. |
Details... |
1.6km |
27/08/2021 |
CONDITIONAL |
Dove Hill Centre , Ballynoran , Carrick-on-Suir |
change of use from retail unit to restaurant with ancillary kitchen, storage, preparation area and all associated site works... login required. |
Details... |
1.6km |
10/08/2021 |
N/A |
Dove Hill Centre , Ballynoran , Carrick-on-Suir |
change of use from retail unit to restaurant with ancillary kitchen, storage, preparation area and all associated site works... login required. |
Details... |