2.4km |
19/12/2024 |
N/A |
Barrettsgrange , Fethard , Co. Tipperary |
the construction of a single-storey dwelling with associated effluent treatment plant and percolation area, and all associated site development works, including alterations to existing site entrance and associated roadside boundary setback... login required. |
Details... |
150m |
19/12/2024 |
N/A |
Ardsallagh House , Ardsallagh Estate , Fethard Co. Tipperary |
(a) demolition of mid-20th century 2-storey extension on north facade & single storey extensions on west facade of the two-storey with attic over basement dwelling (main house), conservatory ruins on south facade and courtyard outbuildings (b) construction of a new single storey extension & glass link to the west (rear) and a new single storey extension to the north (side) of main house (c) works to the main house including works to facades on all elevations including removal of existing cementitious render & full lime re-render, refurbishment of the limestone front door surround, cills, minor repairs & refurbishment of entrance railings, refurbishment of existing doors & windows to include slimline double glazing. The building will be... login required. |
Details... |
2.4km |
30/10/2024 |
N/A |
Kilconnell Stud Kilconnell , Fethard , Co. Tipperary |
change of use of 9no. stables into dog boarding kennels and proposed external dog play areas and for Retention of the existing agricultural sheds and feed silo including all associated site development works... login required. |
Details... |
2.3km |
07/06/2024 |
CONDITIONAL |
Ballyvadin , Fethard , Clonmel Co Tipperary |
the permanent removal of the now demolished structures and filled lagoon on his lands. These structures comprised of the following 1-Derelict Building (87.10sqm), Storage shed (45.82sqm), Stable Building (55.44sqm) and Corrugated Shed (143.52sqm)... login required. |
Details... |
1.9km |
07/06/2024 |
CONDITIONAL |
Ballyvadin , Fethard , Clonmel Co Tipperary |
the permanent removal of the now demolished structures and now filled lagoon on his lands at Ballyvadin, Fethard, Clonmel, Co Tipperary. These structures comprised of the following: “A”-... login required. |
Details... |
2.3km |
06/06/2024 |
N/A |
Ballyvadin , Fethard , Clonmel |
the permanent removal of the now demolished structures and filled lagoon on his lands. These structures comprised of the following 1-Derelict Building (87.10sqm), Storage shed (45.82sqm), Stable Building (55.44sqm) and Corrugated Shed (143.52sqm) ... login required. |
Details... |
1.9km |
06/06/2024 |
N/A |
Ballyvadin , Fethard , Clonmel |
the permanent removal of the now demolished structures and now filled lagoon. These structures comprised of the following: “A”-Steel framed, corrugated shee... login required. |
Details... |
3km |
19/12/2023 |
CONDITIONAL |
Glengaddy , Fethard , Co. Tipperary |
the construction of a (i) stable building with tack room (ii) roof over existing silage slab (iii) roofed horse walker (iv) manure area with effluent tank (v) sand area arena (VI) farm roadway and all associated site works... login required. |
Details... |
2.2km |
16/12/2022 |
CONDITIONAL |
Derryluskan , Fethard , Co. Tipperary |
a one and a half storey extension and granny flat to the side of existing dwelling, relocate existing vehicular entrance, upgrade septic tank and percolation area and all associated site development works... login required. |
Details... |
760m |
17/11/2022 |
CONDITIONAL |
Coolmoyne , Fethard , Co. Tipperary |
a). single-storey extensions to side and rear of existing dwelling, b). demolish room to rear of dwelling, c). refurbish and alter existing dwelling and all associated works... login required. |
Details... |
3km |
26/09/2022 |
CONDITIONAL |
Curraghscarteen , Fethard , Co Tipperary |
(i) a silage slab with manure area (ii) a slatted tank (iii) a flow channel and all associated site works. Permission for Retention is also required for Loose shed extension... login required. |
Details... |
2.7km |
30/08/2022 |
CONDITIONAL |
Ballyvadin , Fethard , Co. Tipperary |
a new single storey, 3 bedroom house, new entrance and driveway, new waste water treatment system, percolation area and associated site works and services ... login required. |
Details... |
2.7km |
18/08/2022 |
N/A |
Ballyvadin , Fethard , Co. Tipperary |
a new single storey, 3 bedroom house, new entrance and drivemway, new waste water treatment system, percolation area and assoicated site works and services ... login required. |
Details... |
1.5km |
17/06/2022 |
CONDITIONAL |
Rathbrit , Fethard , Co Tipperary |
the as constructed steel shed and permission to demolish existing rear single storey extension and to construct a new larger single storey extension to the rear of dwelling house with all with associated site works... login required. |
Details... |