3km |
19/12/2023 |
CONDITIONAL |
Glengaddy , Fethard , Co. Tipperary |
the construction of a (i) stable building with tack room (ii) roof over existing silage slab (iii) roofed horse walker (iv) manure area with effluent tank (v) sand area arena (VI) farm roadway and all associated site works... login required. |
Details... |
2.6km |
14/11/2023 |
N/A |
De Barra Farm , Tullamaine , Fethard |
(1) the construction of a storey and a half extension to dwelling, (2) the renovation of the existing dwelling, (3) the construction of a domestic garage and associated site works ... login required. |
Details... |
2.6km |
17/05/2023 |
CONDITIONAL |
Colman (Hennessey)/Rathdrum , Fethard , Co. Tipperary |
part demolition of existing cottage, and adjoining structures and construction of new extension, including raising the roof of the original cottage, construction of new detached ... login required. |
Details... |
2.1km |
16/12/2022 |
CONDITIONAL |
Derryluskan , Fethard , Co. Tipperary |
a one and a half storey extension and granny flat to the side of existing dwelling, relocate existing vehicular entrance, upgrade septic tank and percolation area and all associated site development works... login required. |
Details... |
2.2km |
02/12/2022 |
CONDITIONAL |
Moorstown , Fethard , Co Tipperary |
to construct a 36-meter- high multi use lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed with a 2.4 meter high palisade fence compound with associated ground equipment and associated site works including new access track... login required. |
Details... |
2.8km |
17/11/2022 |
CONDITIONAL |
Coolmoyne , Fethard , Co. Tipperary |
a). single-storey extensions to side and rear of existing dwelling, b). demolish room to rear of dwelling, c). refurbish and alter existing dwelling and all associated works... login required. |
Details... |
2.2km |
15/11/2022 |
N/A |
Milltownmore , Fethard , Co Tipperary |
a 36 metre high multi-user lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track... login required. |
Details... |
2.5km |
17/06/2022 |
CONDITIONAL |
Rathbrit , Fethard , Co Tipperary |
the as constructed steel shed and permission to demolish existing rear single storey extension and to construct a new larger single storey extension to the rear of dwelling house with all with associated site works... login required. |
Details... |
2km |
02/06/2022 |
CONDITIONAL |
Moorstown , Fethard , Co Tipperary |
(A) alterations to elevations of the existing dwelling house and changes to the roof height at the rear of the dwelling from planning permission granted under P314448. (B) Re... login required. |
Details... |
2km |
05/05/2022 |
N/A |
Moorstown , Fethard , Co Tipperary |
(A) alterations to elevations of the existing dwelling house and changes to the roof height at the rear of the dwelling from planning permission granted under P314075. (B) Re... login required. |
Details... |
2km |
07/04/2022 |
N/A |
Moorstown , Fethard |
A) alterations to elevations of existing dwelling house & changes to roof height at the rear of the dwelling from planning permission granted under P3/14075. B) an extens... login required. |
Details... |
1.8km |
07/04/2022 |
CONDITIONAL |
Tullamain , Fethard , Co. Tipperary |
a dwelling house, garage, driveway, new entrance, treatment system and all associated site development works ... login required. |
Details... |
2.2km |
14/03/2022 |
CONDITIONAL |
Milltownmore , Fethard , Co. Tipperary |
reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility, increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility, air handling bio-filter installati... login required. |
Details... |
2.2km |
03/06/2021 |
REFUSED |
Milltownmore , Fethard , Co. Tipperary |
reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility. Increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility. Air handling bio-filter insta... login required. |
Details... |
2.1km |
23/03/2021 |
CONDITIONAL |
Colman (Hennessy) , Fethard , Co. Tipperary |
construction of milking parlour building incorporating holding yard with crush/drafting yard, meal bin, office, flow channel, storage rooms, underground effluent tank and plant rooms and all associated site works. Demolition of milking parlour is also required ... login required. |
Details... |