2.5km |
13/01/2025 |
N/A |
Parochial House , Portnard , Cappamore Co. Limerick. |
the installation of a new waste water treatment system and all associated site works. The works are within the curtilage of a Protected Structure (RPS 1053) ... login required. |
Details... |
1.9km |
07/11/2024 |
N/A |
Dromsally Woods , Main Street Turagh , Cappamore |
the construction of 7 no 2-storey houses, alterations and extension to the estate road, connection to the public sewer & all services together with associated sit... login required. |
Details... |
2.1km |
20/09/2024 |
CONDITIONAL |
Killuragh , Cappamore , Co. Limerick |
the construction of a vehicular entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
1.8km |
18/09/2024 |
N/A |
Turagh , Cappamore , Co. Limerick |
a two storey extension as constructed to the rear of the existing dwelling and all ancillary site works... login required. |
Details... |
2.4km |
05/09/2024 |
CONDITIONAL |
Dromsallagh , Cappamore , Co. Limerick |
the construction of a new two-storey dwelling, together with a new entrance, detached garage, sewage treatment system and all ancillary site works... login required. |
Details... |
220m |
15/07/2024 |
CONDITIONAL |
Tuogh , Cappamore , Co. Limerick |
the construction of a new dwelling house, garage, entrance, drive-way, packaged wastewater treatment system with percolation area and all ancillary site works... login required. |
Details... |
1.7km |
11/07/2024 |
REFUSED |
Tinnatarriff , Cappamore , Co. Limerick |
the re-construction of sections of exterior walls, re-roof and refurbish existing derelict farmhouse dwelling, construct a new extension, upgrade existing entrance for improved sight lines and install a new waste water treatment and disposal system and all associated works... login required. |
Details... |
1.3km |
01/05/2024 |
REFUSED |
Dromsally , Cappamore , Co. Limerick |
alterations to the existing site which include the provision of motorhome, construction of masonry boundary wall along the rear site boundary, and all ancillary site services... login required. |
Details... |
1.6km |
29/04/2024 |
REFUSED |
Superoil Service Station , Dromsally Road , Cappamore |
a period of 3 years for the extended shop, sheds on western boundary, shed and toilet block on eastern boundary, skip yard, car wash, totem pole all within the revised site boundaries. The unauthorised works that are the subject of Enforcement Notice DC-181-21. Planning Permission for the demolition of the existing service station and for the construction of a new service station which will include: Co... login required. |
Details... |
2km |
29/03/2024 |
CONDITIONAL |
Turagh , Cappamore , Co. Limerick |
the proposed development comprising a change of use of commercial/shop building to a dwelling including all necessary alterations and modifications. Permission is also sought to construct 2 No. modular designed... login required. |
Details... |
2km |
07/03/2024 |
CONDITIONAL |
Main Street , Cappamore , Co. Limerick. |
the construction of a domestic garage / store and all associated site works. The development is within the curtilage of a protected structure (RPS No. 1061)... login required. |
Details... |
1.7km |
12/01/2024 |
CONDITIONAL |
Dromsally , Cappamore , Co Limerick |
the construction of a two storey extension to his dwelling, and ancillary works... login required. |
Details... |
2.6km |
06/12/2023 |
CONDITIONAL |
Dromineenboy , Pallasgreen , Co. Limerick |
the construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and all ancillary site works... login required. |
Details... |
1.9km |
07/11/2023 |
CONDITIONAL |
Moore Street , Turagh , Cappamore |
the construction of new 22-unit housing development consisting of the following: 6 No 4 bedroom detached dwellinghouses, 2 No 3-bedroom semi-detached dwellinghouses, 10 No 3 bedroom townhouses, and 4 no 2 bedroom townhouses, new vehic... login required. |
Details... |
1.9km |
20/09/2023 |
CONDITIONAL |
Turagh , Cappamore , Co. Limerick |
the construction of a vehicular entrance, dwelling house, domestic garage, connection to main services together with all associated site works... login required. |
Details... |
1.9km |
14/09/2023 |
CONDITIONAL |
1 Saint Marys Terrace , Cappamore , Co. Limerick |
the demolition of existing garden shed to side of existing dwelling house and for the construction of a replacement garden shed to the rear of the garden together with all associated site works... login required. |
Details... |
2.2km |
02/09/2023 |
CONDITIONAL |
Killuragh , Cappamore , Co. Limerick |
the construction of a vehicular entrance off existing private passageway, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
2km |
16/02/2023 |
N/A |
Eyon , Cappamore , Co.Limerick |
the construction of an underground slurry storage tank including all ancillary site works... login required. |
Details... |
2.7km |
01/02/2023 |
CONDITIONAL |
Portnard , Cappamore , Co. Limerick |
the installation of Flood lighting to playing pitch consisting of 8 number 20metre lighting columns, construction of a hurling wall, development of a lighted walking track around perimeter of existing playing pitches together with all associated site works at the existing sports grounds... login required. |
Details... |