1.4km |
04/04/2024 |
N/A |
Carheennascovoge , Carheennascovoge , Athenry |
of an existing sun lounge including all associated works and services to the existing dwelling house which was previously approved under Planning Ref. No. 99/238. Gross floor space of work to be retained: 16.11 sqm... login required. |
Details... |
1.4km |
23/02/2024 |
CONDITIONAL |
Prospect , Block 'G' Athenry Shopping Centre , Athenry Co. Galway |
for: a) the construction of a second floor extension, b) the change of use of part of existing building granted under pl. ref. no. 21/55 from office use to provide retail, office and assembly and recreation use, c) for all associated internal alterations, d) for the provision of an exit door to ... login required. |
Details... |
1.4km |
04/01/2024 |
N/A |
Prospect , Athenry |
of the existing pedestrian accessway to the new Clarin College... login required. |
Details... |
1.2km |
22/12/2023 |
N/A |
Prospect , Athenry , Co. Galway |
for the development consisting of: • The construction of a mixed use development of 37 no. residential units and 1 no. retail unit, within 5 no. building blocks; • Block 01 will consist of a 2-3 storey duplex building to accommodate 8 no. own door apartment units made up of 1 no. 1 bed unit, 6 no. 2 bed units and 1 no. 3 bed units; • Block 02 will consist of a 2-3 storey duplex building to accommodate 9 no. own door apartment units made up of 3 no. 1 bed units, 5 no. 2 bed units and 1 no. 3 bed unit; • Block 03 will consist of a 3 storey duplex building to accommodate 9 no. own door apartment units made up of 1 no. 1 bed unit, 6 no. 2 bed units and 2 no. 3 bed units; • Block 04 will consist of a 3 storey duplex building to accommodate 7 no. own door apartment units made up of 1 no. 1 bed unit, 5 no. 2 bed units and 1 no. 3 bed unit; • Block 05 will consist of a 3 storey duplex building to accommodate 2 no. ground floor retail units (gross floor area 209.55sqm) and 4 no. own door apartment units made up of 3 no. 2 bed units and 1 no. 3 bed unit; • Provision of private o... login required. |
Details... |
1.1km |
22/12/2023 |
N/A |
Mountain South , Athenry , Co. Galway |
for the: (1) construction of a new detached dwelling house, (2) domestic garage and (3) proposed effluent treatment system and percolation area and all associated site works. Gross floor space of proposed works: 270.114 sqm (house) & 48 sqm (garage)... login required. |
Details... |
640m |
18/12/2023 |
CONDITIONAL |
The Arches Farnablake East , Athenry , Co. Galway |
to: 1. convert existing garage attached to existing dwelling into a habitable space (area 45.98sqm), 2. demolish existing rear kitchen (area 13.30sqm) and construct a new rear extension (area 21.60sqm), 3. carry out minor mod... login required. |
Details... |
1.3km |
02/11/2023 |
CONDITIONAL |
Castleturvin td , Athenry , Co. Galway |
for the construction of new 2-storey dwelling along with garage, wastewater treatment system & all associated site works... login required. |
Details... |
1.2km |
31/08/2023 |
CONDITIONAL |
Newford Ballygarraun South & Prospect , Athenry , Co. Galway |
for the proposed development will consist of: • construction of a 4no. storey medical device manufacturing facility providing warehousing, production areas, administration offices & restaurant (GIA: 40,226.6 m2); • construction of a central utilities compound to comprise a gas insulated switchgear substation building (GIA: 124.57 m2), pumphouse building (GIA: 84.79 m2) & MV building (GIA: 306.46 m2); • the development includes 4no. surface car park areas, which comprise a total of 500no. car parking spaces (including 100no. EV charging spaces & 18no. accessible spaces), 10no. motorcycle parking spaces & 178no. bicycle parking spaces; • provision of an outdoor landscaped ‘Wild Plaza’ & a 2.1km nature trail; • provision of roof mounted solar PV panels & plant equipment on the roof of the manufacturing facility; • ... login required. |
Details... |
2km |
30/08/2023 |
CONDITIONAL |
Lecarrow , Athenry , Co. Galway |
for the construction of a new slatted shed with loose bedded area & all associated ancillary concrete... login required. |
Details... |
1.7km |
11/08/2023 |
CONDITIONAL |
Clarke St./Cross St. Athenry , Co. Galway |
for a change of the opening & delivery hours in respect of an existing discount foodstore. The current opening & delivery hours are stipulated by condition no. 10 of an amendment of the parent planning pe... login required. |
Details... |
550m |
01/08/2023 |
N/A |
Furzypark , Athenry , Co. Galway |
to construct 2no. warehousing storage buildings which includes a new site entrance & adjustments of the road fronting the development, car parking & all associated site works & services. The works include an increased capa... login required. |
Details... |
1.4km |
07/07/2023 |
REFUSED |
Main Road Prospect , Athenry , Co Galway |
for development to include: construction of 72 no. residential units comprising of: (i) 30 no. houses (8no. two storey two bed residential dwellings, 19 no. two storey three bed residential dwellings, 2 no. three bed courtyard houses, 1 no. four bed courtyard house) (ii) 42 no. apartments units–(including 22 no. two beds & 20 no. one bed apartment units) set out in 9 no. two-storey blocks. Creation of new vehicular and pedestrian access from/to the existing Prospect Road, pro... login required. |
Details... |
2.9km |
30/06/2023 |
REFUSED |
Moneyteige , Craughwell , Co. Galway |
to construct a new dwellinghouse, domestic garage, wastewater treatment system & all associated site works... login required. |
Details... |
1.5km |
26/06/2023 |
CONDITIONAL |
Castleturvin , Athenry , Co. Galway |
for construction of first floor side extension & ground floor rear extension to existing dwelling & all associated services & site development works... login required. |
Details... |
560m |
28/04/2023 |
CONDITIONAL |
Furzypark , Athenry , Co. Galway |
for the development comprising of two road maintenance vehicle storage sheds and associated site works. Shed 01 has an approximate ridge level of 34.5m and shed ... login required. |
Details... |
1.8km |
27/04/2023 |
CONDITIONAL |
Knockaunglass , Athenry , Co. Galway |
for the construction of a residential development consisting of 15 no. houses. The development will consist of the construction of: 8no. 4 bed semi-detached (2 storey) houses, 2no. 3 bed semi-detached (2 storey) houses, 3no. 3 bed terraced (2 storey) houses, 2no. 2 bed terraced houses. The proposed development will also include for: provision of public open space, private open space, bicycle parking, footpath connections, public lighting, landscaping and revised boundary t... login required. |
Details... |
1km |
26/04/2023 |
REFUSED |
Farranablake East with ancillary works in the townlands of Baunmore and Gortnahown , Athenry , Co. Galway |
for the construction of a residential development consisting of 49 no. houses, together with ancillary works in the townlands of Baunmore and Gortnahown. The development will consist of the construction of: 18 no. 4 bed semi-detached (2 storey) houses, 10 no. 3 bed semi-detached (2 storey) houses, 13 no. 3 bed terraced (2 storey) houses, 3 no. 4 bed detached houses, 5 no. 2 bed terraced houses. The proposed development will also include for; The demolition of a shed ruin on site, provision of public open space areas (including a playground), private open space areas,... login required. |
Details... |
2km |
17/04/2023 |
CONDITIONAL |
Raheen Industrial Estate , Athenry , Co. Galway |
to sub-divide an existing site into two lots hereinafter referred to as ‘Site A’, which has an area of 3,276 sqm and ‘Site B’, has an area of 3,243 sqm. Planning permission also for the construction of a new storage warehouse on ‘Site B’ to include new vehicle access, parking, lighting, and all an... login required. |
Details... |
900m |
21/02/2023 |
CONDITIONAL |
Farnablake East , Athenry , Co. Galway |
to construct a domestic garage including all associated works and services at the rear of his dwelling house. Gross floor space of proposed works: 51 sqm ... login required. |
Details... |