10m |
21/04/2023 |
N/A |
Main Street , Birdhill , Co.Tipperary |
(1) the construction of a single storey dwelling house (2) a new single storey garage (3) new hard and soft landscaping (4) provision of a new foul water treatme... login required. |
Details... |
170m |
17/02/2023 |
CONDITIONAL |
Birdhill , Co. Tipperary |
to demolish existing dwelling house & shed and replace with a new dwelling house & garage, upgrade existing waste water treatment system & construct a new entrance along with all ancillary site works... login required. |
Details... |
1.4km |
03/02/2023 |
CONDITIONAL |
Gortybrigane , Birdhill , Co Tipperary |
construction of a traditional style single storey dwellinghouse, onsite wastewater treatment system and site entrance, together with associated siteworks ... login required. |
Details... |
2.1km |
21/12/2022 |
CONDITIONAL |
Lackenavea (Dunally) , Birdhill , Co. Tipperary |
internal modifications to existing dwelling, carry out alterations to an adjacent outbuilding to convert it to habitable space and to construct an extension... login required. |
Details... |
2.9km |
21/11/2022 |
N/A |
Cloonfadda , Killaloe , Co Clare |
to remove existing septic tank and install an effluent treatment system and sand filter infiltration area and all associated site works... login required. |
Details... |
2.9km |
19/09/2022 |
N/A |
Ardcloony , Killaloe , Co Clare |
the development consists of the unauthorised road network associated with previous planning permission reference No. P.16/114. It is proposed to RETAIN the road network for an indefinite period... login required. |
Details... |
2.4km |
29/08/2022 |
CONDITIONAL |
Thornhill , Birdhill , Co Tipperary |
a domestic store and partially constructed domestic store and Permission to complete this store which is partially used for the storage of pet food in connection with an online pet food business operating from the existing dwelling house, all within the curtilage of a protected structure... login required. |
Details... |
750m |
24/08/2022 |
CONDITIONAL |
Shannonside Business Park , Birdhill , Co. Tipperary |
the replacement of car parking and associated works which are arising from the R494 upgrade project and the associated Compulsory Purchase Order for the existing overflow car park... login required. |
Details... |
760m |
18/08/2022 |
N/A |
Shannonside Business Park , Lackenavea Birdhill , Co. Tipperary |
replacement car parking and associated works. These works are arising from the R494 upgrade project and the associated Compulsory Purchase Order for the existing overflow car park... login required. |
Details... |
2.4km |
15/08/2022 |
N/A |
Thornhill , Birdhill , Co. Tipperary |
domestic store and to retain and complete a domestic store which is partially used for the storage of pet food in connection with an on line pet foot business operating from the existing dwelling house, all within the curtilage of a protected structure... login required. |
Details... |
2.5km |
18/07/2022 |
CONDITIONAL |
Ballyhane , Birdhill , Co Tipperary |
the raising of the existing roof to accomodate two new bedrooms in the roofspace. Also the construction of three new dormer windows to the front of the house... login required. |
Details... |
1.4km |
22/06/2022 |
N/A |
The Farmyard , Birdhill , Co. Tipperary |
demolition of the existing derelict outbuilding and construction of a replacement building to incorporate self-contained granny flat, games room, fuel store together with all associated site and incidental works... login required. |
Details... |
2.5km |
24/05/2022 |
CONDITIONAL |
Cappanakeady , Birdhill , Co. Tipperary |
minor alterations to the floor area, location of roof light and minor positional alterations to window, door positions on single storey extension to the rear (no... login required. |
Details... |
2.8km |
18/05/2022 |
CONDITIONAL |
Cloonfadda Tld , Killaloe , Co Clare |
to refurbish an existing house and to construct a ground floor and dormer roof extension and a Granny Flat extension to the existing dwelling house and all associated site works ... login required. |
Details... |
750m |
27/04/2022 |
CONDITIONAL |
Cooleen , Birdhill , Co.Tipperary |
portable style changing rooms and toilet block facilities, on site waste water treatment system, alterations to existing entrance and all ancillary works... login required. |
Details... |
740m |
14/04/2022 |
N/A |
Birdhill , Co. Tipperary |
Portable slyle changing rooms and toilet block facilities, on site waste water treatment system, alterations to existing entrance and all ancillary works... login required. |
Details... |
2.3km |
23/03/2022 |
N/A |
Cooleen , Birdhill , Co Tipperary |
storage shed and covered lean-to to the southern side of existing dwelling... login required. |
Details... |
2.1km |
01/03/2022 |
N/A |
Coosane , Birdhill , Tipperary |
construction of single storey dwelling, detached domestic garage, new access from existing farm roadway, advanced wastewater treatment system and polishing filter, connection to necessary services together with all associated site and incidental works... login required. |
Details... |
2.5km |
10/02/2022 |
CONDITIONAL |
Ballyhane , Birdhill , Co. Tipperary |
domestic store to front of house... login required. |
Details... |