1.7km |
07/12/2023 |
CONDITIONAL |
Fahybeg , Bridgetown , Co Clare |
for the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works... login required. |
Details... |
2.7km |
05/12/2023 |
N/A |
Coosane , Birdhill , Tipperary |
a single storey dwelling, detached domestic garage, new access from existing farm roadway, advanced wastewater treatment system and polishing filter, connection to necessary services together with all associated site and incidental works... login required. |
Details... |
2km |
12/10/2023 |
N/A |
Bridgetown , O Briensbridge , Co. Clare |
for the construction of 4 new dwellings, New vehicular entrance, Pedestrian access, footpaths and individual Wastewater Treatment systems with percolation areas including ancillary site works.... login required. |
Details... |
2.9km |
13/06/2023 |
CONDITIONAL |
Clare View Coosane , Birdhill , Co. Tipperary |
(a)proposed Part 1.5 storey/ part single storey dwelling, (b) proposed single storey garage ancillary to proposed dwelling, (c) proposed new treatment system, percolation area, (d) proposed new entrances from lane accessing onto public road and all associated site works and ancillary services... login required. |
Details... |
850m |
09/06/2023 |
CONDITIONAL |
Clonboy , Bridgetown , Co Clare |
for to erect an extension to the side of house and all associated site works... login required. |
Details... |
2.7km |
17/05/2023 |
N/A |
Montpelier , Castleconnell , Co. Limerick |
a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
870m |
15/05/2023 |
N/A |
Clonboy , Bridgetown , Co Clare |
for to erect an extension to the side of house and all associated site works... login required. |
Details... |
1.6km |
12/05/2023 |
CONDITIONAL |
Knockadrohid , O'Briens Bridge , Co. Clare V94 PF7K |
for change of use from residential dwelling to Long-term residential care facility for people with disabilities and retain existing rear extension all as per drawing documentation submitted together with all ancillary site works and services.... login required. |
Details... |
1.5km |
05/04/2023 |
CONDITIONAL |
Ardcloony , Killaloe , Co. Clare |
for development which will consist of a new single storey dwelling house and a new waste water treatment system and a new vehicular and pedestrian entrance onto the public road and all associated site works... login required. |
Details... |
2.1km |
09/03/2023 |
REFUSED |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Sec... login required. |
Details... |
2km |
06/03/2023 |
N/A |
Bridgetown , O'Brien's Bridge , Co Clare |
for the construction of 9 New Dwellings, New Vehicular Entrance, Pedestrian Access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works ... login required. |
Details... |
2.3km |
13/01/2023 |
N/A |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghers) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including welfare facilities, electrical infrastructure, parking, wastewater holding tank, rainwater harvesting tank, sec... login required. |
Details... |
2.1km |
23/11/2022 |
CONDITIONAL |
Cloonfadda , Killaloe , Co Clare |
to erect a dwellinghouse, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works... login required. |
Details... |
2.8km |
21/11/2022 |
CONDITIONAL |
Cloonfadda , Killaloe , Co Clare |
to remove existing septic tank and install an effluent treatment system and sand filter infiltration area and all associated site works... login required. |
Details... |
2.9km |
11/10/2022 |
N/A |
Faheymore North , O'Briensbridge , Co. Clare |
for development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 and 9 of A... login required. |
Details... |
1.9km |
19/09/2022 |
N/A |
Ardcloony , Killaloe , Co Clare |
the development consists of the unauthorised road network associated with previous planning permission reference No. P.16/114. It is proposed to RETAIN the road network for an indefinite period... login required. |
Details... |
2.9km |
07/09/2022 |
CONDITIONAL |
Gaarraunboy , Killaloe , Co. Clare |
of agricultural stables and sand arena as constructed ... login required. |
Details... |
2.6km |
12/08/2022 |
CONDITIONAL |
Fairyhall , Montpelier , Co. Limerick |
replacement cattle crush as constructed together with all associated incidental works... login required. |
Details... |
2.5km |
14/07/2022 |
REFUSED |
Cloonfadda Td , Killaloe , Co Clare |
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, re-locate existing agricultural entrance, including all ancillary site works... login required. |
Details... |
1.3km |
23/05/2022 |
CONDITIONAL |
Ardcloony , Killaloe , Co Clare |
to block up existing combined agricultural / residential entrance and replace with a relocated combined agricultural / residential entrance along with all ancillary site works ... login required. |
Details... |