1.8km |
08/11/2024 |
N/A |
Fitzgeralds Woodlands Hotel , Knockanes , Adare Co. Limerick |
the Tree House Outdoor Dining Area comprising of wooden dining cabins, the shop/kitchen building, the bar/restaurant structure, the sanitary accommodation building and 9 no. storage containers/structures and all associated site works... login required. |
Details... |
1km |
08/11/2024 |
N/A |
The Manor Feilds , Adare , Co. Limerick. |
the installation of 3 bays of PV panels to include structural steel frames, concrete hardstandings, rainwater harvesting system with storage tanks and overflow to existing attenuation pond on-site and all associated site works... login required. |
Details... |
70m |
17/10/2024 |
N/A |
Rathkeale Road , Adare , Co. Limerick |
the part demolition of existing dwelling, changes to elevation, construction of two-storey extension comprising of two apartments and all ancillary site works... login required. |
Details... |
2.8km |
30/09/2024 |
N/A |
Garraunboy , Adare , Co. Limerick |
a domestic garage beside existing dwelling house and associated site works... login required. |
Details... |
60m |
13/09/2024 |
N/A |
Rathkeale Road , Adare , Co. Limerick |
the part demolition of existing dwelling, changes to elevation, construction of two-storey extension comprising of two apartments and all ancillary site works... login required. |
Details... |
200m |
12/09/2024 |
REFUSED |
Station Road , Blackabbey , Adare |
an extension to the existing garage at the rear of his dwelling house incorporating 2 additional overhead doors adjacent to the existing garage door with direct access to Abbey View Estate access roadway... login required. |
Details... |
3km |
04/09/2024 |
N/A |
Ballylongford , Adare , Limerick |
the (a) renovation of the existing dwelling house to include elevational changes; (b) demolition of the existing garage/ shed; (c) construction of a single storey extension to side of existing dwelling house; (d) all associated site works and services... login required. |
Details... |
500m |
27/08/2024 |
CONDITIONAL |
8 The Heritage , Blackabbey Adare , Co. Limerick |
the development that will consist of: the construction of a new single storey extension to the rear and side of the existing house and the construction of a new single storey extension to the front of the existing storage shed and all associated site works above and below ground... login required. |
Details... |
510m |
18/08/2024 |
CONDITIONAL |
6 Manor Court , Adare , Co. Limerick |
the construction of a granny flat to the side / front of Dwelling; with all associated site works... login required. |
Details... |
390m |
06/08/2024 |
CONDITIONAL |
5 The Demesne , Adare Manor , Adare Co. Limerick. |
construction of a detached domestic garage with first floor study/office space, change of elevations to dwelling house, construction of an additional chimney stack, conversion of attic space to living accommodation and all ancillary site works ... login required. |
Details... |
150m |
26/07/2024 |
CONDITIONAL |
No. 4 The Back Avenue , Adare , Co. Limerick. |
the demolition of the existing wc, kitchen and store and the part demolition of the existing hall, all to the rear of the existing house. Permission is also sought for the construction of a single-storey extension to the rear and ... login required. |
Details... |
2.1km |
24/07/2024 |
CONDITIONAL |
Knockanes , Adare , Co. Limerick |
demolition of the existing dwelling and the construction of a replacement dwelling; installation of a proprietary treatment system and polishing filter, relocation of entrance and all associated site works... login required. |
Details... |
1.7km |
21/06/2024 |
CONDITIONAL |
Fitzgeralds Woodlands Hotel , Knockanes. , Adare |
the relaxation room and covered walk-way, linking it to Revas Spa and for the storage building at Revas Spa... login required. |
Details... |
860m |
18/06/2024 |
CONDITIONAL |
Curraghbeg , Adare , Co. Limerick |
amendments to previously approved planning application ref: 21/474. The changes proposed include; reduced size extension moved to front of existing cottage, revised works to existing cottage, ... login required. |
Details... |
480m |
09/04/2024 |
REFUSED |
Rathkeale Road , Adare , Co. Limerick |
the development that will consist of: (1) construction of 25 no. residential units comprising 12 no. 3-bed houses and 13no. 4-bed houses; (2) connection ... login required. |
Details... |
890m |
05/03/2024 |
CONDITIONAL |
Adare Manor Hotel and Golf Resort , Adare Manor Adare , Co. Limerick |
the erection of 10,634.64m2 or 1.27 MWp of photovoltaic panels on lands located southwest of our golf course, with all associates site works at Tizzard Holdings Unlimited Company, Adare Manor Hotel and Golf Course, Co. Limerick, V94 W8WR. The development will comprise of photovoltaic panels with ground mounted frames with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways, temporary construction compound/set-down area. The development is situated within an Architect... login required. |
Details... |
2.8km |
05/03/2024 |
CONDITIONAL |
Curraghbridge , Adare , Co. Limerick |
the construction of a detached, single-storey dwelling house, detached garage, wastewater treatment system & polishing filter, new site entrance & associated boundary wall and all ancillary site works... login required. |
Details... |
2.5km |
22/02/2024 |
CONDITIONAL |
Curraghbridge , Adare , Co. Limerick |
the construction of an agricultural entrance together with all associated site works... login required. |
Details... |
160m |
21/12/2023 |
CONDITIONAL |
The Avenue , Adare , Co. Limerick |
the construction of a dormer bungalow style dwelling. The works will include connections to existing services and all associated siteworks... login required. |
Details... |