1.2km |
19/08/2024 |
N/A |
Block G2-4 , Smithstown Business Park , Shannon |
for development which will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and all associated site works ... login required. |
Details... |
780m |
02/08/2024 |
N/A |
Building 156 Shannon Free Zone , Shannon , County Clare V14 VH70 |
for the installation of a 62 kW ground mounted Solar PV System and all associated site works... login required. |
Details... |
2.8km |
26/07/2024 |
N/A |
Shannon Airport , Shannon , Co. Clare |
the development will consist of the demolition of existing single storey administration offices, consolidation/protection works to the western end of the shared services building, the removal and upgrade of the facade to the eastern end of the main terminal building over 2no. stories, the reconfiguration of t... login required. |
Details... |
700m |
27/06/2024 |
CONDITIONAL |
Units 37-40 (former Iceland) & 40A (Dealz) , Shannon Town Centre , Tullyvarraga & Tullyglass Shannon Co Clare |
for development, the development will consist of an amendment to the permitted amalgamated retail unit as granted under Reg. Ref. No. 23/634 and will comprise the provision of an ancillary off - licence sales area of c. 95.1sq.m and all ancillary site services and site development works... login required. |
Details... |
2.3km |
07/06/2024 |
CONDITIONAL |
Shannon Airport , Rineanna South , Shannon |
for a 1.2mW PV solar farm development. The proposed works will consist of a 1.2mW PV solar farm located within the airfield, with an area of approximately 2.25 hectares, comprising of linear arrays of... login required. |
Details... |
2.8km |
24/05/2024 |
CONDITIONAL |
Shannon Airport , Shannon , Co. Clare |
for development which will consist of a single-storey extension to existing Gates 1 to 5 departures terminal, provision of external plant area and covered external circula... login required. |
Details... |
1.6km |
18/05/2024 |
CONDITIONAL |
4 Ard Na Gréine , Shannon , Co. Clare |
for the construction of a second storey extension to dwelling and all associated site works... login required. |
Details... |
1.3km |
15/05/2024 |
CONDITIONAL |
Ei Electronics Campus , Shannon Industrial Estate , Shannon Co. Clare. |
for the development of an extension to the existing light-industrial manufacturing facility, consisting of a single storey of high bay warehousing with ancillary office, manufacturing, and R&D areas over 3 storeys resulting in a combined 5100m² of new floor area, with screened roof level plant. The development will include the provision of 3 no. ramped loading bays, 3 no. at grade loading door... login required. |
Details... |
1.1km |
03/05/2024 |
N/A |
Treacy's Oakwood Hotel , Airport Road Smithstown , Shannon Co Clare |
for development at an existing hotel consisting of: extension to Second Floor to accommodate additional 29 no. Bedrooms; extension to First Floor to accommodate additional ... login required. |
Details... |
1.8km |
29/04/2024 |
N/A |
Clonloghan , Newmarket-on-Fergus , Co Clare |
to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works... login required. |
Details... |
1.2km |
26/04/2024 |
CONDITIONAL |
Radharc Doire Smithstown , Shannon , Co. Clare. |
for development which will consist of (a) the construction of 13 no. two storey dwelling houses, (b) 15 no. two storey dwelling houses with optional additional attic bedroom accommodation. Total no. of 28 houses (c) all a... login required. |
Details... |
1.4km |
27/03/2024 |
CONDITIONAL |
Smithstown Industrial Estate , Shannon Co Clare , V14 N993 |
of the erecting of 1,764.23 m2 or 370.83 kWp of photovoltaic panels on the existing two roofs of our buildings located east and south of our factory land, with all associates site works ... login required. |
Details... |
1km |
01/03/2024 |
CONDITIONAL |
No 117 Cluain Airne , Shannon , Co Clare |
of a complete single-storey garage to the rear and a complete single-storey extension to the side of existing semi-detached bungalow... login required. |
Details... |
1.4km |
21/02/2024 |
CONDITIONAL |
3 Inis Sioda , Shannon , Co Clare |
for development, the development will consist of an attic conversion to a living space to existing dwelling, a retention permission for a material change o... login required. |
Details... |
1.3km |
01/02/2024 |
CONDITIONAL |
Smithstown Light Engineering , Bay H1A - Smithstown Industrial Estate Shannon , Co. Clare |
for development, the development will consist of proposed roof mounted Photovoltaic PV panels on an existing profile metal roof and all associated site works ... login required. |
Details... |
2km |
20/12/2023 |
CONDITIONAL |
Illaunmanagh , Tullyvarraga , Shannon Co Clare |
to relocate the existing temporary 'Polytunnel' structure to a new location within the site for a period of 5 years along with associated site works. The works are to take place within the curtilage of a protected structure (RPS No 664)... login required. |
Details... |
2.8km |
20/12/2023 |
N/A |
Clonmoney West , Shannon , Co. Clare |
to import inert fill to agricultural lands to improve the agricultural output of the land, provide for internal access road and all ancillary site works required to facilitate the proposed development ... login required. |
Details... |
700m |
19/12/2023 |
CONDITIONAL |
Shannon Town Centre , Tullyvarraga & Tullyglass , Shannon Co Clare |
for the amalgamation of units no. 40a (Dealz) and Units 37-40 (Formerly Iceland) to form one single retail unit in the Shannon Town Centre Shopping Centre. PERMISSION is being sought for the outlined as well as signage, internal demolition, and all associated site development works... login required. |
Details... |
1.4km |
11/12/2023 |
CONDITIONAL |
23 Tullyvarraga Crescent , Shannon , Co Clare |
of dwelling house and attached garage as constructed and all associated site works... login required. |
Details... |