290m |
13/03/2024 |
N/A |
Churchtown , Newcastle West , Co Limerick |
the construction of a single storey dwelling house with attached domestic garage, front boundary entrance walls, connection to all public utilities / services with all associated site works... login required. |
Details... |
2.8km |
21/02/2024 |
N/A |
Cloonyscrehane , Newcastle West , Co. Limerick |
the re-opening of previously closed vehicular entrance into their private residence and all associated site works on their site... login required. |
Details... |
1.6km |
15/02/2024 |
N/A |
Rathnaneane , Newcastle West , Co. Limerick |
the erection of Domestic Garage for the storing of Recreational Vehicle (Camper Van) and vintage cars and all associated site works on his site... login required. |
Details... |
1.6km |
09/02/2024 |
N/A |
21 Chapel Close , Newcastlewest , Co. Limerick |
the construction of a rear ground floor extension & side first floor extension above a side annex & all associated site works... login required. |
Details... |
780m |
07/02/2024 |
N/A |
Gortboy , Newcastle West , Limerick |
an extension to enclose the existing covered porch area, relocation of the main entrance to the building and all associated site works... login required. |
Details... |
1.9km |
02/02/2024 |
N/A |
Woodfield Manor Cloonyscrehane , Newcastle West , Co. Limerick |
construction of twelve apartments in a single 3-storey block in place of 12 apartments in two 3-storey blocks previously granted planning permission under ref. no. 21-531 and numbered 80-91... login required. |
Details... |
2km |
19/01/2024 |
CONDITIONAL |
Doocatteen , Newcastle West , Co. Limerick |
the construction of a two storey dwelling house, entrance, driveway, wastewater treatment unit, polishing filter and all ancillary site works... login required. |
Details... |
2.7km |
16/01/2024 |
N/A |
Kilrodane , Ardagh , Newcastle West |
the construction of an easy feed slatted cubicle house with underground slatted tank, feed barriers, feed passage, ancillary concrete and walkway, and all associated ancillary site works at our farmyard... login required. |
Details... |
1.4km |
09/01/2024 |
N/A |
Scoil Mhuire agus Íde , Bóher Buí Newcastle West , Co. Limerick |
The development will consist of:
(i) A new two storey school building standalone extension, incorporating Classrooms, Specialist Teaching spaces, Special Education Needs Unit, Offices and Ancillary accommodation. Services to include roof mounted photovoltaic panels & plant room.
(ii) An external heat pump and gas tank compound and a standalone substation b... login required. |
Details... |
2.6km |
15/12/2023 |
N/A |
Drominmacturlough , Newcastlewest , Co Limerick |
the construction of a new single storey dwelling, entrance, domestic garage, wastewater treatment system and polishing filter, and ancillary works... login required. |
Details... |
1.2km |
15/12/2023 |
N/A |
Cullinagh , Newcastlewest , Co. Limerick |
the development that will comprise permission for development as follows: (1) Permission for retention of alterations and extension to existing dwelling, (2) Permission to co... login required. |
Details... |
230m |
14/11/2023 |
N/A |
Cois Teampaill , Churchtown , Newcastle West |
the construction of 14 residential units in total comprising of seven no. two-storey terraced town houses and seven no. single-storey terraced bungalows, demolition and removal of existing unfinished foundations, and associated site works... login required. |
Details... |
960m |
09/11/2023 |
N/A |
Fullers Folly , Bridge Street , Newcastle West |
the proposed development that will consist of: Development of the West Limerick Tourism Hub @ Fullers Folly to include: Refurbishment and renovation of the Fullers Folly buildings (which is a protected structure, RPS 1488 & 1489) and courtyard, and change of use to commercial, community and tourism. Construction of a new building between the two existing structures. Develop the buildings and site to include toilets, café, visitor information, retail, viewing area, interpretation and open courtyard space. Develop a pedestrian link between the Fullers Folly courtyard and the riverside. Works to include all site development works for the buildings and site including utilities, drainage, landscaping and public realm. Improvements works to the entrance from Bridge Street to the Folly including provision of pedestrian walkways. In accordance with Article 120(1)(b)(i) of the Planning and Development Regulations 2001, as amended, the Local Authority has carried out a screening for environmental imp... login required. |
Details... |
420m |
09/11/2023 |
N/A |
Limerick Greenway , Station Road , Newcastle West |
the proposed development that will consist of: The construction of a services building at the Limerick Greenway Hub @ Newcastle West for commercial, community and tourism use. The building will include bike hire, coffee dock, toilets, store and services. Works to include all site development works for the building including utilities, landscaping and public realm around the building. This proposal is a continuation of the previously approved Part 8 Planning for a carpark, Ref No. 228019. In accordance with ... login required. |
Details... |
800m |
24/10/2023 |
CONDITIONAL |
Churchtown , Newcastle West , Co. Limerick |
the demolition of the existing dwelling house and outbuildings, construction of a new replacement dwelling house, upgrade and utilise existing vehicular entrance, upgrade existing onsite effluent disposal system with all associated site works... login required. |
Details... |
1.3km |
18/10/2023 |
N/A |
Cullinagh , Newcastle West , Co. Limerick |
the (A) Subdividivision of land, (B) Construction of new entrance gates into existing house, (C) Construction of 4no. single storey dwellings (D) Construction of new service road, public footpaths, Car Parking a... login required. |
Details... |
1km |
18/10/2023 |
CONDITIONAL |
North Quay , Newcastle West , Co. Limerick |
the removal of existing front window and to Install new front door, for access to 1st and 2nd floors and change of use of ground floor dental surgery to residential apartment. (The building is a Protected Structure RPS 1501)... login required. |
Details... |
1.1km |
04/10/2023 |
CONDITIONAL |
The Old Myson (Rettig) Heating Controls Factory , Sheehans Rd. Gortboy , Newcastle West |
a permanent hardcore surface for storage of new products manufactured onsite which are stainless steel vessels, pipework, platforms, ductwork and other systems... login required. |
Details... |
430m |
25/09/2023 |
N/A |
Carrig Desmond , Churchtown Road Newcastle West , Co. Limerick |
the construction of a residential development of 53 no. dwelling houses and all ancillary site works at Carrig Desmond, Churchtown Road, Newcastle West, Co. Limerick. The development comprises ... login required. |
Details... |
870m |
06/09/2023 |
N/A |
Ballygowan Park , The Demesne , Newcastle West |
construction of an all-weather pitch with drainage and fencing, the erection of floodlighting, construction of a stepped spectator stand, 2x dugouts, a clubhouse to include changing rooms, toilets, meeting room and all associated site works... login required. |
Details... |