Glasheenanargid, Taurbeg and Taurmore, Co.Cork,
Jul 28 2025
Further Info. ReceivedSep 08 2025
Decision DueNov 03 2025
Appeal Submitted-
Submitted: 14 / 07 / 2025
-
Application Type:
Permission -
Application Status:
Application Closed -
Council Decision:
N/A (Unknown)
Useful Links:
Development Description:
Permission for the continued operation of the existing Taurbeg Wind Farm, which includes 11 no. turbines, a 38kV substation and associated infrastructure (as permitted by cork county council ref N/02/3608) for a further period of 10 years from the date of expiry of the current planning permission and for the decommissioning of the entire Taurbeg Wind Farm at the end of that further period. All elements of the wind farm are pre-existing and no modifications are proposed to the existing Taurbeg wind farm as part of this planning application. The Taurbeg wind farm comprises the following elements: 1. 11 no. existing wind turbines with a tip height of 108.2 metres and all associated foundations and hardstanding areas, 2) 1 no. existing onsite 38kV electrical substation including a control building, associated electrical plant and equipment, welfare facilities and a wastewater holding tank, 3) 1no. existing meteorological mast with height of 67m, 4) all existing underground electrical and communications cabling connecting the existing wind turbines to the existing onsite 38kV substation, 5) an existing gated site entrance and existing internal access tracks, 6) existing site drainage, 7) existing ancillary infrastructure, associated site fencing and signage. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in relation to the proposed development and accompany this planning application. The EIAR assess both the continued operation of the Taurbeg wind farm as well as integral elements of the wider project comprising the undertaking of removal of commercial forestry and restoration of farmland habitat at Coom and Knockatee County Kerry, which constitute offsetting measures associated with the continued operation of the Taurbeg Wind Farm. These offsetting measures are located in a separate planning authority jurisdiction (Kerry County Council) and will be subject of a separate planning application to the planning authority.
Nearby Applications:
Appeals / Commencement
No Appeals Found
Decision Appealed:
- Appeal Submitted:
- Appeal Status:
- Appeal Decision:
- An Coimisiún Pleanála File Ref.: 500020
- Note: If an appeal has been lodged and information isn't showing then this means An Coimisiún Pleanála hasn't published the data for reuse by PlanningAlerts.ie. You will need to follow up directly on the ACP website. Use the reference number, above, if available.
No Commencement Found
Commencement Information:
- Notice Submitted:
- Start Date:
- BCMS Notice:
- View on BCMS Website
Copyright:
Planning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.