620m |
24/01/2024 |
N/A |
Unit 25 GB Business Park, Ballytrasna, Little Island, Co Cork |
Permission for the removal of the existing (temporary) storage structures on the western side of the existing light industrial building and the construction of 2 no. single storey extensions (totaling 1,026 sq.metres) to the w... login required. |
Details... |
1.8km |
15/01/2024 |
N/A |
Belvelly Port Facility, Marino Point, Marino, Cobh, Co.Cork |
Permission for the construction of a grain storage and distribution facility and all ancillary site works. The proposed development consists of a grain storage building and grain handling storage building with associated headhouse structure. The proposed development also includes the provision of 2 no. weighbridges and... login required. |
Details... |
520m |
21/11/2023 |
Conditional Permission |
Unit 5 Gb Business Park, Little Island, Co. Cork, T45VF59 |
Permission for an extension to their ancillary office on the ground and first floor. The extension on the first floor is for an increase in sanitary facilities at the office.... login required. |
Details... |
1.9km |
28/09/2023 |
Refused |
Belvelly Port Facility, Marino (Townlands), Marino Point, Cobh, Co.Cork |
The proposed development will consist of; 1) the construction of a stationary battery energy storage system which will include 154 no. 20ft. containers and 22 no. medium voltage transformers and connection to the existing substation, 2) the construction of a new internal access road, to connect to an internal road previously permitted under application register reference: 19/6783, whi... login required. |
Details... |
1.8km |
12/09/2023 |
Conditional Permission |
Fota Wildlife Park, Fota Island Foaty, Carrigtwohill, Co Cork |
Permission for the erection of a new steel-framed building to house a group of Siamang Gibbon. This new building will replace the small existing timber Siamang Gibbon building which is to be demolished. The development includes ... login required. |
Details... |
2km |
21/08/2023 |
N/A |
Vacant Site at Maple Rise, Pembroke Woods Pembroke, Passage West, Co Cork |
Permission for development of 10 houses and 5 apartments (over three stories), and all ancillary site works, including car parking and modified access.... login required. |
Details... |
620m |
14/08/2023 |
Conditional Permission |
Harbour Point Business Park, Courtstown, Little Island, Co.Cork |
The provision of external signage to East facing elevations of units U2 and U3 and all other ancillary and associated site development works... login required. |
Details... |
690m |
28/07/2023 |
Conditional Permission |
Unit 2 GB Business Park, Ballytrasna, Little Island, Co Cork |
Works to industrial warehouse development (Previous Pl.Reg.No. 03/1563): 1) amalgamation of two approved warehouse units, 2) construction of loading bay extension, 3) construction of glazed porch extension, 4) elevational c... login required. |
Details... |
90m |
27/07/2023 |
N/A |
Clash Road, Ballytrasna, Little Island, Co Cork |
Construction of 14 no. dwellinghouses (12 no. three-bedroom houses and 2 no. four-bedroom houses) which is an increase in density from 6 no. detached dwelling houses granted permission under Pl.Reg.No. 18/4473, incorporating revised site layout and minor re-alignmen... login required. |
Details... |
70m |
17/07/2023 |
N/A |
Ballytrasna, Clash Road, Little Island, Co. Cork |
Permission is sought for a two-storey detached dwelling, domestic garage along with associated site and ancillary works.... login required. |
Details... |
620m |
14/07/2023 |
N/A |
Units U2 and U3 Harbour Point Business Park, Courtstown, Little Island, Co Cork |
Provision of external signage to east facing elevations of units U2 & U3 and all other ancillary and associated site development works.... login required. |
Details... |
720m |
23/06/2023 |
Conditional Permission |
'Lynwood', Clash Road, Ballytrasna, Little island, Co.Cork |
Permission for the construction of an extension to existing dwelling house, alterations to existing elevations and all associated works... login required. |
Details... |
90m |
16/06/2023 |
N/A |
Clash Road, Ballytrasna, Little Island, Co.Cork |
Permission to increase in density from 6 no. detached dwelling houses granted under pl.reg.no. 18/4473 to 14 no. two-storey semi-detached dwelling houses (12 no. three-bedroom houses and 2 no. four-bedroom houses) incorporating revised site layout and minor re-... login required. |
Details... |
90m |
16/06/2023 |
Application Received |
Clash road, Ballytrasna, Little island Co.Cork |
Permission to increase in density from 6 no. detached dwelling houses granted under pl.reg.no. 18/4473 to 14 no. two-storey semi-detached dwelling houses (12 no. three-bedroom houses and 2 no. four-bedroom houses) incorporating revised site layout and minor re-... login required. |
Details... |
70m |
15/05/2023 |
N/A |
Ballytrasna, Little Island, Co Cork, |
Two storey detached dwelling, domestic garage along with associated site and ancillary works.... login required. |
Details... |
70m |
15/05/2023 |
Invalid Application |
Ballytrasna, Little Island, Co Cork |
Two storey detached dwelling, domestic garage along with associated site and ancillary works.... login required. |
Details... |
2km |
05/05/2023 |
N/A |
Vacant Site at Maple Rise, Pembroke Woods, Pembroke, Passage West, Co.Cork |
Development of 10 houses and 5 apartments, (over three stories), and all ancillary site works, including car parking and modified access... login required. |
Details... |
2km |
05/05/2023 |
Invalid Application |
Vacant Site at Maple Rise, Pembroke Woods, Pembroke, Passage West Co.Cork |
Development of 10 houses and 5 apartments, (over three stories), and all ancillary site works, including car parking and modified access... login required. |
Details... |
1.7km |
20/04/2023 |
Refused |
No. 8 Horsehead, Pembroke, Passage West, Co. Cork |
The construction of a retaining wall with protective railing on top, along the rear/northern boundary and returned to the eastern end, the raising and alteration of the existing ground levels to include a sunken seating area at the rear garden of the dwelling. The development included all the required site works, including site drainage, landscaping and the construction of a series of planters located on the external face of the retaining wall. The development consisted of works to the boundary, and within the curtilage of a protected structure RPS-ID511 (Horsehead House), as list... login required. |
Details... |
280m |
14/03/2023 |
Conditional Permission |
Harbour View, Well Road, Courtstown, Little Island, Co.Cork |
Permission for the demolition of existing single storey side sunroom and front porch to be replaced by single storey side extension, front porch and side apex roof light to existing single storey dwelling... login required. |
Details... |