2.7km |
06/06/2023 |
N/A |
DERRYREAG (NDOIRE AIMHRÉIDH) , CO KERRY |
THE DEVELOPMENT IN COUNTY KERRY FORMS PART OF A RENEWABLE ENERGY DEVELOPMENT COMPRISING A FIVE-TURBINE WIND FARM AND ALL ASSOCIATED WORKS ON LANDS IN BOTH COUNTIES CORK AND KERRY. THE DEVELOPMENT IN COUNTY KERRY WILL CONSIST OF UPGRADE OF EXISTING FOREST ACCESS ROADS TO INCLUDE PASSING BAYS AND ALL ASSOCIATED DRAINAGE INFRASTRUCTURE, WORKS AT THE ENTRANCE TO AN EXISTING FOREST ROAD ACCESSED OFF THE N22 TO INCLUDE LOCALISED WIDENING OF THE FOREST ROAD AND CREATION OF A SPLAYED ENTRANCE, REMOVAL OF EXISTING VEGETATION FOR VISIBILITY SPLAYS AND REMOVAL OF STREET FUR... login required. |
Details... |
2.4km |
06/06/2023 |
Application Received |
Inchnamore / na hInse Móire, Milleeny / na Millíní, Derreenaling / an Doirín Álainn Co.Cork /Co.Chorcaí |
We, Inchamore Wind Designated Activity Company, intend to apply for permission for a ten-year planning permission for a renewable energy development. The entirety of the renewable energy development constitutes the provision of a five-turbine wind farm and all associated works on land in both Counties Cork and Kerry. The development for will consist of : 1) a wind farm with an operational lifespan of 35 years (from date of commissioning of the development), 2) the construction of five turbines with an overall ground to blade tip height ranging from 177m to 185m inclusive; a rotor diameter ranging of 149m to 155m inclusive; and a hub height ranging from 102.5m to 110.5m inclusive, 3)construction of permanent turbine hardstands and turbine foundations, 4) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. 5) installation of a (35-year life cycle) meteorological mast with a height of 110m and a 4m lightning pole on top, such that the overall structure will be 114m, 6) development of an on-site borrow pit, 7) construction of a new permanent internal site access roads to include passing bays and all associated drainage infrastructure. 8) development of a permanent internal site drainage network and sediment control systems. 9) construction of a permanent 38 kV electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, parking security fencing and gates, all associated underground cabling, wastewater holding tank, and all ancillary structures and works, 10) all associated underground electrical and communications cabling connecting the wind turbines to the on-site wind farm substation, 11) ancillary forestry felling to facilitate construction of the development, 12) all associated site development works including berms, landscaping, and soil excavation. Advisory note: A planning application is being lodged with Kerry County Council in relation to the elements of the project that are within the townland of Derryreag (Dhoire Aimhréidh) Co.Kerry, including the upgrade of the site entrance off the N22 and permanent forest track upgrade works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS).
Tá sé beartaithe againne, inchamore Wind... login required. |
Details... |
2.4km |
02/06/2023 |
Conditional Permission |
Slievereagh, Ballyvourney, Co. Cork, |
Construction of dwelling house and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works. A Natura Impact Statement will be submitted to the Planning Authority with the application. ... login required. |
Details... |
2.4km |
14/03/2023 |
Conditional Permission |
Slievereagh and Coomnaclohy, Ballyvourney, Co.Cork, |
Alterations to the dimensions of the 7 no. wind turbines permitted as part of the Knocknamork Renewable Energy development (planning reference 19/4972). The proposed development includes the provision of 7 no. wind turbines with an overall ground to blade tip height of 175m (an increase of 25m, from 150m), a rotor blade length of 75m and a hub height of 100m, an... login required. |
Details... |
2.9km |
05/05/2022 |
Conditional Permission |
Slievereagh, Ballyvourney, Macroom, Co.Cork |
Construct a dormer dwelling house, domestic garage, treatment unit and polishing filter unit and all site development works... login required. |
Details... |
2.2km |
04/04/2022 |
Conditional Permission |
Doirin Alainn, Baile Mhuirne, Derreenaling, Ballyvourney, Co.Cork |
The development will consist of a soil recovery facility for greenfield soil and stones with smaller quantities of concrete, bricks, tiles, and ceramics (the concrete, bricks, tiles, and ceramics will be used for internal road building). The proposed development will involve the remediation... login required. |
Details... |
2.2km |
23/02/2022 |
N/A |
Doirin Alainn, Derreenaling, Baile Mhuirne, Co. Cork |
The development will consist of a soil recovery facility for greenfield soil and stones with smaller quantities of concrete, bricks, tiles, and ceramics (the concrete, bricks, tiles, and ceramics will be used for internal road building). The proposed development will involve the remediation... login required. |
Details... |
1.9km |
13/12/2021 |
Conditional Permission |
Derreenaling (Td), Ballyvourney, Co. Cork, |
Erecting a 30m high latticework telecommunications structure together with antennas, dishes and associated telecommunications equipment enclosed by security fencing and all associated site works with an extension to the existing access track.... login required. |
Details... |
1.9km |
16/09/2021 |
Conditional Permission |
Slievereagh, Ballyvourney, Macroom, Co. Cork |
Construction of a one and a halfstorey dwelling, domestic garage, sewerage system, site entrance and all associated works. ... login required. |
Details... |