2.6km |
19/11/2021 |
n/a |
CARROWBAUN, SWINFORD, CO MAYO |
CONSTRUCTION OF A NEW DWELLING HOUSE ALONG WITH ON-SITE WASTE WATER TREATMENT SYSTEM ALONG WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.7km |
07/10/2021 |
Conditional |
NEWPARK, SWINFORD, CO. MAYO |
ALTERATIONS AND EXTENSION TO EXISTING DWELLING ALONG WITH ALL ANCILLARY SITE WORKS AS REQUIRED... login required. |
Details... |
1.8km |
25/08/2021 |
Conditional |
PARK ROAD, SWINFORD, CO MAYO |
CONSTRUCTION OF 3 NO. DWELLINGS WITH CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
23/07/2021 |
Conditional |
KILKELLY ROAD, SWINFORD, CO MAYO |
ALTERATIONS AND EXTENSIONS TO EXISTING COMMERCIAL UNIT ALONG WITH ANCILLARY SITE WORKS... login required. |
Details... |
1.3km |
17/05/2021 |
Conditional |
CARROWCANADA, SWINFORD |
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES... login required. |
Details... |
1.7km |
14/05/2021 |
Refused |
RATHSCANLAN, SWINFORD, CO MAYO |
HOUSING DEVELOPMENT CONSISTING OF 6 DWELLING HOUSES WITH CONNECTION TO PUBLIC SERVICES AND ASSOCIATED SITE SERVICES... login required. |
Details... |
1.2km |
09/03/2021 |
Refused |
RATHDUBH, KILBRIDE, SWINFORD |
CONSTRUCTION OF NEW ENTRANCE ROADWAY TO THE EXISTING HOUSING ESTATE TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.5km |
02/12/2019 |
CONDITIONAL |
Newpark , Swinford , Co. Mayo |
Construction of access road to facilitate access to the existing forestry plantation. The proposed road shall have a bell mouth access onto the regional road and internal turning circle together with all ancillary site works... login required. |
Details... |
630m |
29/10/2019 |
CONDITIONAL |
CUILLAUN , SWINFORD |
CONSTRUCT DWELLINGHOUSE, DOMESTIC GARAGE AND EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
80m |
21/10/2019 |
CONDITIONAL |
SWINFORD WATER TREATMENT PLANT , KILBRIDE , SWINFORD |
CONSTRUCTION OF A RAW WATER BALANCE TANK, CONSTRUCTION OF A SOLIDS RESIDUALS MANAGEMENT SYSTEM (TO INCLUDE BACKWASH SETTLEMENT AND EQUALISATION TANKS, SUPERNATANT B... login required. |
Details... |
2.6km |
26/08/2019 |
CONDITIONAL |
CLOONAGHBOY , CULMORE , SWINFORD |
CONSTRUCT DWELLING HOUSE, GARAGE, SEPTIC TANK AND PERCOLATION AREA, COMPLETE WITH ALL ASSOCIATED WORKS... login required. |
Details... |
2km |
12/07/2019 |
CONDITIONAL |
UNIT 1 , POUND LANE , SWINFORD |
CHANGE OF USE OF EXISTING GROUND FLOOR UNIT 1 FROM COMMERCIAL CLASS 1, 2 AND 3 TO CLASS 8 - MONTESSORI FACILITY TOGETHER WITH OTHER MINOR ALTERATIONS AND ALL ASSOCIATED SITE WORKS AND CONNECTION INTO EXISTING SERVICES... login required. |
Details... |
90m |
08/07/2019 |
CONDITIONAL |
KILBRIDE , SWINFORD , CO. MAYO |
RETENTION OF BASEMENT EXTENSION AND BASEMENT GARAGE AS CONSTRUCTED TO THE PRE-EXISTING DWELLING ALSO PERMISSION TO UPGRADE EXISTING SEWERAGE TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.2km |
19/03/2019 |
CONDITIONAL |
CLOONAGHBOY , SWINFORD , CO. MAYO |
RETENTION OF 3 NO. DOMESTIC STORAGE SHEDS CONSTRUCTED TO THE REAR OF THE EXISTING DWELLING HOUSE TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.1km |
14/03/2019 |
CONDITIONAL |
KILBRIDE , SWINFORD , CO. MAYO |
CHANGE OF USE FROM RESIDENTIAL TO COMMUNITY FACILITY (CLASS 1b). EXTENSION TO SIDE OF BUILDING 29SQM. ALTERATIONS TO EXISTING BUILDING INCLUDING THE REMOVAL OF EXISTING CHIMNEYS AND CHANGES TO WINDOW AND DOOR FENES... login required. |
Details... |
1.8km |
13/02/2019 |
CONDITIONAL |
DERRYRONAN , SWINFORD , CO. MAYO |
RETAIN DWELLING HOUSE AS CONSTRUCTED, AMENDED SITE BOUNDARIES ALONG WITH ANCILLCARY SITE WORKS, P11/537 AND P16/766 REFERS... login required. |
Details... |
2.6km |
11/02/2019 |
CONDITIONAL |
KNOCKRANNY , SWINFORD |
RETAIN FOUNDATION FOR DOMESTIC GARAGE AND MATERIAL WIDENING OF THE PRE-EXISTING VEHICULAR ACCESS. CONSTRUCTION OF EXTENSION TO EXISTING DWELLING AND CONSTRUCTION OF DOMESTIC GARAGE TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |