2.8km |
15/12/2021 |
n/a |
CLOONAGH, BELCARRA, CASTLEBAR |
DWELLING HOUSE AND GARAGE WITH SEPTIC TANK AND PERCOLATION AREA TOGETHER WITH ALL ASSOCIATED SITE WORKS AND CONNECTION INTO EXISTING SERVICES... login required. |
Details... |
150m |
17/11/2021 |
n/a |
CUILLARE, BELCARRA |
CONSTRUCTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE ALONG WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.7km |
20/07/2021 |
Conditional |
LISNOLAN, MANULLA, CASTLEBAR |
RETAIN EXISTING HOUSE AS CONSTRUCTED, CONSTRUCT AN EXTENSION, INCLUDING INSTALLATION OF A NEW SEPTIC TANK/WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS AND SERVICES... login required. |
Details... |
730m |
01/07/2021 |
Conditional |
BALLINLASSA, BELCARRA, CASTLEBAR |
CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING HOUSE, UPGRADING OF EXISTING SEPTIC TANK AND PERCOLATION AREA AND ALL ANCILLARY WORKS... login required. |
Details... |
2.8km |
31/05/2021 |
Conditional |
LOGAPHUILL, CASTLEBAR |
CONSTRUCT NEW DWELLING HOUSE, GARAGE, SEWAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND SERVICES... login required. |
Details... |
1.3km |
29/04/2021 |
Conditional |
BALLAGHFARNA, BELCARRA, CASTLEBAR |
EXTEND EXISTING GARAGE TO SEPARATE LIVING ACCOMMODATION AND TO CONNECT TO EXISTING SERVICES... login required. |
Details... |
1.2km |
22/04/2021 |
Conditional |
BALLAGHFARNA, BELCARRA, CASTLEBAR, CO. MAYO |
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND ALL ANCILLARY WORKS INCLUDING CONNECTION TO EXISTING PUBLIC SERVICES... login required. |
Details... |
1.7km |
15/11/2019 |
CONDITIONAL |
BALLAGHFARNA , BELCARRA , CASTLEBAR |
UPGRADE EXISTING SEPTIC TANK SYSTEM BY CONSTRUCTING A NEW ON-SITE PET SYSTEM WITH SOIL POLISHING FILTER AND DECOMMISSION EXISTING SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
280m |
11/07/2019 |
CONDITIONAL |
BELCARRA , CASTLEBAR , CO. MAYO |
CONSTRUCT 22 HOUSING UNITS, CONSISTING OF 9 NO. DETACHED UNITS, 4 NO. SEMI-DETACHED UNITS AND 9 NO. TERRACED HOUSING UNITS, CONSTRUCTION OF A NEW SITE ENTRANCE, CONNECTION TO EXISTING SERVICES, NEW BOUNDARY TREATMENTS, SITE LANDSCAPING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
840m |
10/07/2019 |
CONDITIONAL |
ELMHALL , BALLYCARRA , CASTLEBAR |
CONSTRUCT DWELLING HOUSE AND GARAGE TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
90m |
29/05/2019 |
N/A |
CUILARE , BELCARRA , CASTLEBAR |
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, CONNECTION TO EXISTING PUBLIC SEWER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.1km |
23/05/2019 |
CONDITIONAL |
FAIRHILL , KNOCKBAUN , CASTLEBAR |
SINGLE STOREY EXTENSION OT THE NORTH WEST SIDE OF THE EXISTING DWELLINGHOUSE AND CONSTRUCTION OF A THREE-BAY DOMESTIC GARAGE... login required. |
Details... |
2.8km |
28/03/2019 |
CONDITIONAL |
LAKELAND UPPER , MANULLA , CASTLEBAR |
CONSTRUCT DWELLING HOUSE, SEPTIC TANK, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |