2.5km |
16/05/2022 |
N/A |
Knockanalban , Mullagh , Co Clare |
to build a new dwelling, garage, install a wastewater treatment system and all other associated site and ancillary works... login required. |
Details... |
1.4km |
11/05/2022 |
N/A |
Knockliscrane , Miltown Malbay , Co Clare |
to carry out alterations and to extend and refurbish an existing dwelling along with all associated works ... login required. |
Details... |
620m |
05/05/2022 |
N/A |
Dough Tld. , Spanish Point , Co. Clare |
to construct a Hobby Garage/Store and associated site works on a site adjacent to their existing dwelling house... login required. |
Details... |
2km |
03/05/2022 |
N/A |
Breaffy South , Miltown Malbay , Co Clare |
to RETAIN existing dwelling house with connection to treatment system Planning Ref. P21/897 and existing public water supply ... login required. |
Details... |
780m |
22/04/2022 |
N/A |
Dough , Miltown Malbay , Co. Clare |
for development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works... login required. |
Details... |
2.5km |
16/03/2022 |
REFUSED |
Breaffy South , Miltown Malbay , Co Clare |
demolish part of existing dwelling/storage area, to extend existing dwelling and connect to existing septic tank... login required. |
Details... |
2.1km |
04/03/2022 |
N/A |
Quilty East , Quilty , Co Clare |
to demolish partly constructed dwelling house of previously granted permission (Pl Ref: P8/26220) to RETAIN septic tank as granted under previously granted permission (Pl Ref: P8/26220). Construct new private dwelling i... login required. |
Details... |
2.8km |
16/02/2022 |
CONDITIONAL |
Ballymackea More , Quilty , Co Clare |
to erect new dwelling house, garage, foul sewer treatment plant, percolation area and new site entrance... login required. |
Details... |
1.4km |
09/02/2022 |
N/A |
Crosses of Annagh , Quilty , Co Clare |
to build a Dwelling House, install a wastewater treatment system & all other associated site and ancillary works... login required. |
Details... |
2.8km |
09/02/2022 |
CONDITIONAL |
Ballymackea More , Mullagh , Co Clare |
for the development which will consist of a private garage and store c/w ancillary site works... login required. |
Details... |
2.8km |
07/12/2021 |
N/A |
Ballymackea More , Quilty , Co Clare |
to erect new dwelling house, garage, foul sewer treatment plant, percolation area and new site entrance... login required. |
Details... |
2.5km |
25/11/2021 |
N/A |
Breaffy South , Miltown Malbay , Co Clare |
to erect dwelling house, foul sewer treatment plant, percolation area and new site entrance... login required. |
Details... |
630m |
10/11/2021 |
REFUSED |
Dough , Spanish Point , Co Clare |
to construct a storage shed along with associated site works... login required. |
Details... |
1.3km |
05/11/2021 |
CONDITIONAL |
Armada Hotel , Spanish Point , Co Clare |
to alter the elevations of an existing office an to change its use from an office to a cafe ancillary to the existing Armada Hotel Complex along with associated site works ... login required. |
Details... |
2.1km |
14/10/2021 |
CONDITIONAL |
Poulawillin , Mitown Malbay , Co Clare |
for the construction of a single storey dwelling house, detached domestic garage, waste water treatment system, polishing filter, new site entrance and associated boundary wall and all ancillary site works ... login required. |
Details... |
1.9km |
06/10/2021 |
CONDITIONAL |
Breaffy South , Miltown Malbay , Co Clare |
of minor alterations to the orientation and position of the dwelling as constructed under permission P03/2347 including revised boundaries and retention of a pre-existing agricultural shed, yard and hay barn... login required. |
Details... |
1.4km |
05/10/2021 |
CONDITIONAL |
Armada Hotel , Spanish Point , Co Clare |
to construct a ESB Substation and a new screen to the external store area along with associated site works ancillary to the existing Armada Hotel Complex... login required. |
Details... |
1.3km |
22/09/2021 |
N/A |
Armada Hotel , Spanish Point , Co Clare |
to install a new wastewater treatment plant and polishing filter to serve the existing Armada Hotel Complex along with associated site works. The application will be accompanied by a Natura Impact Statement... login required. |
Details... |
2km |
25/08/2021 |
CONDITIONAL |
Breaffy South , Miltown Malbay , Co Clare |
to install a new wastewater treatment system and percolation area to service an existing house and construct a new entrance along with all associated works ... login required. |
Details... |
1.7km |
21/07/2021 |
CONDITIONAL |
Breaffy South , Spanish Point , Miltown Malbay Co Clare |
to alter and extend existing dwelling house. The works involve the following; a) to construct front and rear single storey extensions. b) to alter the internal floor layouts c) to alter the site entrance along with associated site works... login required. |
Details... |