320m |
16/03/2022 |
INVALID APPLICATION |
Unit 75 (DUB12), Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22 |
Erect 775.46sq.m or 289.80 kWp of photovoltaic panels on the roof of storage building with all associated site works.... login required. |
Details... |
340m |
29/11/2021 |
GRANT PERMISSION |
Turnpike Road, Ballymount, Dublin 22, D22P5R7 |
2 new signs at site entrance featuring company logo; 5 new signs on building facade featuring company logo and name; 2 Totem signs featuring company logo and opening times etc; all associated site works.... login required. |
Details... |
170m |
16/11/2021 |
GRANT PERMISSION |
483, Ballymount Cottages, Turnpike Road, Ballymount, Dublin 12 |
Change of use of existing detached warehouse unit to vehicle service workshop including new internal works to from new staff canteen and toilet accommodation; new fire door exit doors; roller shutter door to existing elevations and attached illuminated building signage.... login required. |
Details... |
460m |
23/03/2021 |
GRANT EXTENSION OF DURATION OF PERMISSION |
Merrywell Industrial Estate, Lower Ballymount Road, Dublin 12. |
Detached industrial unit comprising 960sq.m of workshop area plus 720sq.m stores/offices/staff facilities on two floors totalling 1680sq.m together with hardstanding area, diesel storage tanks, wash bay facilities, site boundary walls/fencing and all associated site development works.... login required. |
Details... |
120m |
26/02/2021 |
GRANT PERMISSION |
3 Dental, Red Cow House, Naas Road, Dublin 12 |
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.... login required. |
Details... |
300m |
15/12/2020 |
GRANT PERMISSION |
Wilton Works, Robinhood Road, Dublin 22 |
The relocation of the use of the existing apprentice joinery workshop training centre for young apprentices from its existing location on site to warehouse unit 2 involving the change of use from warehouse to apprentice joinery workshop training centre and all ancillary internal and external works including the extension of the first floor mezzanine of 747sq.m, minor modifications of the front entrance and provision of a canopy with integrated signage and provision of a waste wood store for recycling as fule for the boiler 29sq.m and ... login required. |
Details... |
140m |
14/12/2020 |
GRANT PERMISSION |
Turnpike Road, Ballymount, Dublin 22. |
First floor extension over existing ground floor welfare facilities including changes to the elevations; erection of new cladding to the front (north east) elevation and part of the side (north west) elevation including for all associated signage and for alterations to the roof line of the existing porch at ... login required. |
Details... |
470m |
23/11/2020 |
GRANT PERMISSION |
Units 5,6,7,8,9, Turnpike Business Park, Turnpike Lane, Ballymount, Dublin 22 |
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/num... login required. |
Details... |
2.3km |
16/04/2020 |
GRANT PERMISSION |
Newlands Golf Club, Newlands Cross, Clondalkin, Dublin 22 |
2 single storey shed for the storage of bags and trolleys and for the use as a practice swing room, located in the area adjacent to the maintenance yard and parking and all associated works.... login required. |
Details... |
490m |
09/12/2019 |
GRANT PERMISSION |
Fox and Geese, Robinhood Road, Clondalkin, Dublin 22 |
Construction of new offices (approx. 75sq.m) at first floor level, accessed externally, above existing fork lift charging building 2.... login required. |
Details... |
470m |
13/06/2019 |
GRANT PERMISSION & GRANT RETENTION |
Turnpike Business Park, Turnpike Road, Ballymount, Dublin 22 |
Internal extension of floorplates and amalgamation of units 5, 6, 7, 8 and 9 and their change of use from light industrial to create a two storey office based industry unit of 1,520sq.m within the overall Turnpike Business Park development; Retention for the amalgamation of units 5, 6, and 7 that includes the retention of the internal extension of the original mezzanine floor to create a first floor level above the entire ground floor of these units and change of use of these units at ground and first floor level from light industrial to office based industry (910sq.m overall). Permission for the demolition of the first floor (281sq.m) within units 8 and 9 and the construction of a new first floor (305sq.m) above the entire ground floor of these units and the change of use... login required. |
Details... |
390m |
07/03/2019 |
GRANT PERMISSION |
160, Holly Road, Western Industrial Estate, Dublin 12 |
Construction of vehicular access onto Holly Road.... login required. |
Details... |
390m |
08/01/2019 |
GRANT PERMISSION |
Otter House, Naas Road, Dublin 22. |
Erection of 2 external signs above third floor level to the north and east facing elevations of building; each sign will be internally illuminated with flex face light boxes contained within concealed fixing and all ancillary works necessary.... login required. |
Details... |