40m |
17/01/2022 |
GRANT PERMISSION |
Unit 41, Robinhood Industrial Estate, Ballymount, Dublin 12 |
Change of use from cold storage to light industrial use.... login required. |
Details... |
240m |
02/12/2021 |
GRANT PERMISSION |
Unit S1, Ballymount Drive, Ballymount Industrial Estate, Dublin 12 |
Erection of 2 two storey industrial units adjacent to existing S1 unit comprising of warehouse, office and toilet at ground floor level and proposed storage to mezzanine floor level; alterations to external area/existing car park and all associated site works.... login required. |
Details... |
370m |
10/09/2021 |
GRANT PERMISSION |
Unit 2D, Sunbury Industrial Estate, Ballymount Road Lower, Dublin 12 |
Erection and installation of an exhaust ventilation duct to the front of existing Community , Cultural and Sports Club Facility including the installation of a n... login required. |
Details... |
190m |
08/07/2021 |
GRANT PERMISSION |
Unit 2, Ballymount Road Lower, Walkinstown, Dublin 12 |
Erection of signage on the front (southern elevation) of the building, including a trough light for external illumination of the sign at first floor level; reuse of the existing signage structure at the so... login required. |
Details... |
300m |
15/03/2021 |
GRANT PERMISSION |
Unit 4F, Ballymount Drive, Ballymount Industrial Estate, Dublin 12 |
Extend the existing service workshop to provide additional service bays and covered secure parking.... login required. |
Details... |
250m |
11/03/2021 |
GRANT PERMISSION |
Ballymount Drive, Ballymount Industrial Estate, Dublin 12 |
Construction of a new industrial unit for storage and office purposes, the relocation of an existing fire escape door on existing Unit D1, and all associated site works.... login required. |
Details... |
490m |
10/03/2021 |
GRANT PERMISSION |
CHM Premises, Ballymount Road Lower, Walkinstown, Dublin 12 |
Demolition of an existing warehouse/factory building and ancillary outbuildings/structures and the construction of a residential development of 171 apartments with supporting tenant amenity facilities (gym, lounges and meeting room), café, creche, landscaping, public realm improvements, and all ancillary site development works. The proposed development will consist of 2 x studio apartments, 59 x 1-bedroom apartments, 103 x 2-bedroom apartments and 7 x 3-bedroom apartments contained in two apartment blocks ranging in height from 1 to 8 storeys. The proposed development provides for outdoor amenity areas, landscaping, under-podium car parking, bicycle rac... login required. |
Details... |
180m |
15/01/2021 |
GRANT PERMISSION |
Unit 2, Ballymount Road Lower, Walkinstown, Dublin 12 |
Use of the premises as a warehouse with ancillary trade counters (for the sale of building related products principally to trade); internal alterations include general reconfiguration of the space to create trade counters and warehouse space including new stairs and lift core; external changes... login required. |
Details... |
490m |
23/07/2020 |
GRANT PERMISSION |
Lower Ballymount Road, Walkinstown, Dublin 12 |
Erection of a wall, 28.4 metres long x 2.4 metres high and a side gate along the eastern site boundary.... login required. |
Details... |
430m |
08/06/2020 |
GRANT PERMISSION |
Unit 82, Block 5, Western Parkway Business Park, Ballymount Drive, Dublin 12 |
Alterations to existing northern elevation comprising of four additional windows on northern elevation, two on ground floor and two on first floor.... login required. |
Details... |
260m |
26/03/2020 |
GRANT PERMISSION |
33 Robinhood Industrial Estate, Clondalkin, Dublin 22. |
Sud-division of unit previously granted planning permission under planning Ref. SD16A/0065 into two separate units; minor internal alterations to layout of the previous grant.... login required. |
Details... |
140m |
23/08/2019 |
GRANT PERMISSION FOR RETENTION |
Unit 4, Ballymount Business Park, Ballymount Drive, Robinhood, Dublin 12 |
Retention of first floor mezzanine with a staircase within the interior of the existing warehouse, the exterior is retained. The new mezzanine floor is to be used as additional workspace.... login required. |
Details... |