2.4km |
27/04/2022 |
N/A |
Ballywilliam , Nenagh , Co. Tipperary |
the construction of a vehicular entrance, dwelling house, garage, private well, domestic wastewater treatment system with polishing filter, together with all associated site works ... login required. |
Details... |
3km |
27/01/2022 |
CONDITIONAL |
Carrigatoher , Nenagh , Co Tippeary |
domestic garage attached to existing dwelling and domestic shed... login required. |
Details... |
180m |
22/12/2021 |
CONDITIONAL |
Carrow , Capparoe , Nenagh |
construct a two-storey dwelling house, garage, entrance, wastewater treatment system and percolation area, and ancillary works, along with 2 no. Agricultural entrances to allow access to the family lands and neighbours land and ancillary works ... login required. |
Details... |
1.3km |
23/11/2021 |
N/A |
Capparoe , Nenagh , Co. Tipperary |
single storey extensions to both side elevations of existing dwelling, internal and external alterations to existing dwelling together with all other associated site works... login required. |
Details... |
2km |
27/10/2021 |
CONDITIONAL |
Kilmore , Silvermines , Co. Tipperary |
a) proposed new part 1.5 storey/part single storey dwelling, b) proposed new treatment system, percolation, c) alterations/change of use of existing dwelling to new single storey garage (ancillary to dwelling), d) proposed new entrance from public road, e) and all associated site works/services... login required. |
Details... |
2.9km |
01/10/2021 |
CONDITIONAL |
Carrigatogher (Ryan) , Nenagh , Co Tipperary |
extension to existing garage to rear of dwelling for the storage of vintage vehicles and all associated site works... login required. |
Details... |
2.8km |
17/09/2021 |
CONDITIONAL |
Gortmore , Carrigatoher , Nenagh |
construction of a vehicular entrance, dwelling house, domestic wastewater treatment plant with polishing filter together with all associated site works... login required. |
Details... |
1.2km |
11/08/2021 |
CONDITIONAL |
Gortnacleha , Capparoe , Nenagh Co. Tipperary |
construction of a part two storey/part single storey dwelling house, garage ancillary to dwelling, septic tank and percolation area, new entrance from public road, all associated site works thereto... login required. |
Details... |
2.5km |
30/07/2021 |
CONDITIONAL |
Ballywilliam , Nenagh , Co Tipperary |
to close existing site entrance and construct a new entrance at an alternative location towards the south-west of the site, together with associated siteworks... login required. |
Details... |
1.2km |
16/07/2021 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
construction of a storey-and-half dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works... login required. |
Details... |
200m |
24/06/2021 |
REFUSED |
Carrow , Capparoe , Nenagh |
construction of a two storey dwelling house, garage, entrance, wastewater treatment system and percolation area and ancillary works, along with two agricultural entrances to allow access to the family lands and neighbours land and ancillary works... login required. |
Details... |
2.4km |
22/06/2021 |
N/A |
Ballywilliam , Nenagh , Co Tipperary |
a dwelling house, detached garage, waste water treatment system, provide water supply, entrance/exit and all associated site works... login required. |
Details... |
940m |
15/06/2021 |
UNCONDITIONAL |
Erinagh , Capparoe , Nenagh Co. Tipperary |
an extension to dwellinghouse, construct garage, septic tank treatment system, percolation area and a new entrance and all ancillary site works ... login required. |
Details... |
2.4km |
02/06/2021 |
N/A |
Ballywilliam , Nenagh , Co Tipperary |
construct dwelling house, detached garage, waste water treatment system, provide water supply, entrance/exit and all associated site works... login required. |
Details... |
2.6km |
28/04/2021 |
CONDITIONAL |
Lisbrien/Lissenhall , Nenagh , Co. Tipperary |
proposed new car park, new site entrance, relocation/alterations to existing agricultural entrance, proposed new all-weather area and including all associated site works... login required. |
Details... |
2.9km |
23/04/2021 |
CONDITIONAL |
Carrigatogher , Nenagh , Co. Tipperary |
erection of a dwelling house, garage entrance, driveway, install an effluent treatment system and percolation area and carry out associated site works ... login required. |
Details... |
2.9km |
14/04/2021 |
N/A |
Carrigatoher , Nenagh , Co. Tipperary |
erection of dwelling house, garage, entrance, driveway, install an effluent treatment system and percolation area and carry out associated site works... login required. |
Details... |
2.6km |
22/03/2021 |
N/A |
Lisbrien/Lissenhall , Nenagh , Co. Tipperary |
proposed car park, new site entrance, relocation / alterations to existing agricultural entrance, proposed new all weather area and including all associated site works... login required. |
Details... |
170m |
12/03/2021 |
CONDITIONAL |
Carrow , Capparoe , Nenagh Co. Tipperary |
existing domestic garage as constructed... login required. |
Details... |
1.4km |
18/12/2020 |
CONDITIONAL |
Tulla , Capparoe , Nenagh |
retain existing unauthorised domestic garage and all associated works.... login required. |
Details... |