930m |
27/04/2022 |
N/A |
Ballywilliam , Nenagh , Co. Tipperary |
the construction of a vehicular entrance, dwelling house, garage, private well, domestic wastewater treatment system with polishing filter, together with all associated site works ... login required. |
Details... |
2.8km |
27/04/2022 |
N/A |
Carrigatoher , Nenagh , Co.Tipperary |
a change of house type as previously granted under planning file 201422. The change of house design is to a single storey bungalow.... login required. |
Details... |
2.8km |
22/04/2022 |
N/A |
Carrigatoher , Nenagh , Co.Tipperary |
a change of house type as previously granted under planning file 201422. The change of house design is to a single storey bungalow.3... login required. |
Details... |
2.4km |
09/02/2022 |
N/A |
Carrigatogher (Abbott) , Nenagh , Co Tipperary |
dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works... login required. |
Details... |
2.2km |
27/01/2022 |
CONDITIONAL |
Carrigatoher , Nenagh , Co Tippeary |
domestic garage attached to existing dwelling and domestic shed... login required. |
Details... |
2.7km |
22/12/2021 |
CONDITIONAL |
Ballyhogan , Carrigatoher , Nenagh |
alterations to existing dwelling to include, changes to elevations, extension to the rear, demolition of conservatory, alterations to porch, provision of new entrance and closing of existing entrance and all ancillary works... login required. |
Details... |
1.6km |
22/12/2021 |
CONDITIONAL |
Carrow , Capparoe , Nenagh |
construct a two-storey dwelling house, garage, entrance, wastewater treatment system and percolation area, and ancillary works, along with 2 no. Agricultural entrances to allow access to the family lands and neighbours land and ancillary works ... login required. |
Details... |
2km |
23/11/2021 |
N/A |
Capparoe , Nenagh , Co. Tipperary |
single storey extensions to both side elevations of existing dwelling, internal and external alterations to existing dwelling together with all other associated site works... login required. |
Details... |
3km |
28/10/2021 |
N/A |
Castlecranna , Carrigatoher , Nenagh |
completion of dwelling and detached domestic garage as previously permitted (planning ref (07/51/1217), connection to necessary services, boundary treatments together with all associated site works and Permission for installation of waste water treatment system... login required. |
Details... |
2.9km |
14/10/2021 |
CONDITIONAL |
Barbaha , Carrigatoher , Nenagh |
erection of new calf weaning shed and ancillary dungstead... login required. |
Details... |
1.7km |
17/09/2021 |
CONDITIONAL |
Gortmore , Carrigatoher , Nenagh |
construction of a vehicular entrance, dwelling house, domestic wastewater treatment plant with polishing filter together with all associated site works... login required. |
Details... |
2km |
11/08/2021 |
CONDITIONAL |
Gortnacleha , Capparoe , Nenagh Co. Tipperary |
construction of a part two storey/part single storey dwelling house, garage ancillary to dwelling, septic tank and percolation area, new entrance from public road, all associated site works thereto... login required. |
Details... |
1km |
30/07/2021 |
CONDITIONAL |
Ballywilliam , Nenagh , Co Tipperary |
to close existing site entrance and construct a new entrance at an alternative location towards the south-west of the site, together with associated siteworks... login required. |
Details... |
2.5km |
16/07/2021 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
construction of a storey-and-half dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works... login required. |
Details... |
2.8km |
05/07/2021 |
CONDITIONAL |
Carrigatoher (Harding) , Nenagh , Co Tipperary |
the erection of a 36m free standing steel lattice telecommunications mast to accommodate aerials, antennae and dishes; complete with an enclosed compound surrounded by a 2.4m security fence; associated electrical cabinets and telecommunications equipment: access track and all associated site works... login required. |
Details... |
1.7km |
24/06/2021 |
REFUSED |
Carrow , Capparoe , Nenagh |
construction of a two storey dwelling house, garage, entrance, wastewater treatment system and percolation area and ancillary works, along with two agricultural entrances to allow access to the family lands and neighbours land and ancillary works... login required. |
Details... |
940m |
22/06/2021 |
N/A |
Ballywilliam , Nenagh , Co Tipperary |
a dwelling house, detached garage, waste water treatment system, provide water supply, entrance/exit and all associated site works... login required. |
Details... |
1.4km |
15/06/2021 |
UNCONDITIONAL |
Erinagh , Capparoe , Nenagh Co. Tipperary |
an extension to dwellinghouse, construct garage, septic tank treatment system, percolation area and a new entrance and all ancillary site works ... login required. |
Details... |
940m |
02/06/2021 |
N/A |
Ballywilliam , Nenagh , Co Tipperary |
construct dwelling house, detached garage, waste water treatment system, provide water supply, entrance/exit and all associated site works... login required. |
Details... |
2.8km |
12/05/2021 |
N/A |
Carrigatoher (Harding) , Nenagh , Co. Tipperary |
the erection of a 36m free standing steel lattice telecommunications mast to accommodate aerials, antennae and dishes, complete with an enclosed compound surrounded by a 2.4m security fence, associated electrical cabinets and telecommunications equipment, access track and all associated site works... login required. |
Details... |