  Ballinaheese , Beech Road , Arklow

Apr 19 2018

Application Received

May 31 2018

Further Info. Requested

Jun 22 2018

Further Info. Received

Aug 07 2018

Decision

Aug 15 2018

Decision Due

Sep 17 2018

Withdrawn

Oct 17 2018

Commencement Notice

Nov 08 2018

Commencement Started

Sep 16 2023

Expiry (if required)
  • Submitted to Wicklow County Council, 19 / 04 / 2018
  • Application Type: RETENTION
  • Current Status: APPLICATION FINALISED
  • Decision Text: CONDITIONAL
  • Decision Summary: Granted
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
house and garage as constructe... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    1.8km 25/04/2022 N/A townlands of Killiniskyduff , Tiknock , Kilbride the installation of underground electrical infrastructure between the existing Arklow Gas-insulated Switchgear (GIS) 220kV Substation and the permitted Pollahoney GIS Substation. This will include the installation of approximately two underground electricity cable circuits, each at 3.12km in length and associated underground ducting, horizontal directional drilling, joint bays, communication cabling infrastructure between the existing Arklow GIS 220kV Subst... login required. Details...
    1.7km 29/03/2022 N/A Ballinclea , Arklow , Co. Wicklow construction of a storage/machinery shed and all associated site works... login required. Details...
    1.8km 09/03/2022 N/A Templerainey Ballymoney and Killiskyduff , Arklow , Co. Wicklow a 10 year permission for the construction of an electrical substation and associated 110kV and MV ancillary infrastructure required to connect ground mounted soclar PV generation to the electricity transmission system; energy sto... login required. Details...
    1.7km 08/03/2022 N/A Kilbride Educational Campus , Kilbride , Arklow construction of a new educational campus and a new link road that will servce the school campus which will include the provision of two school buildings. Gaelscoil an Imbhir Mhóir a two-storey, 16 classrooms primary school with two special needs rooms and ancillary spaces with total floor of circa 3093sqm serving 480 pupils. Gaelshólaiste na Mara a three-storey, post primary ... login required. Details...
    1.6km 01/03/2022 CONDITIONAL Ballinacor , Arklow , Co. Wicklow erection of a ground floor extension (incorporating a domestic garage/store), first floor extension and to carry out alterations to existing dwelling house. Permission is also s... login required. Details...
    2.9km 21/12/2021 N/A Snugborough , Arklow , Co. Wicklow the construction of a new detached single storey dwelling, with separate detached single storey domestic garage, and new on-site waste water treatment facility to current EPA standards, together with a new private well, and all ancillary site works... login required. Details...
    2.6km 13/12/2021 N/A Snugborough , Arklow , Co. Wicklow construction of a bungalow with garage, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works... login required. Details...
    740m 13/12/2021 N/A Shelton , Beech Road , Arklow dwelling, connection to water main, effluent disposal systems to current EPA COP standards and all associated site works... login required. Details...
    120m 12/10/2021 N/A Ballinaheese , Arklow , Co. Wicklow dwelling, garage, waste water treatment system to EPA standards, entrance and associated works... login required. Details...
    2.6km 08/10/2021 UNCONDITIONAL Heatherside , Vale Road , Yardland Td extend the appropriate period of 08/610066 - residential development comprising a creche; 185 houses with 4 house types; 8 duplex units over 8 apartments; new access/relief road and infrastructure linking Vale R... login required. Details...
    1.5km 08/10/2021 CONDITIONAL Templerainey , Arklow , Co. Wicklow construction of a dwelling, garage and effluent treatment system, all together with associated site works... login required. Details...
    110m 04/10/2021 N/A Ballinaheese , Beech Road , Arklow to convert part of my home to preschool facilities and all associated site works... login required. Details...
    100m 27/09/2021 CONDITIONAL Ballinaheese , Beech Road , Arklow to relocate existing vehicular entrance to our home to improve sightlines to public road and associated site works... login required. Details...
    2.5km 21/09/2021 CONDITIONAL Heatherside , Yardland Td , The Vale Road replacement of 1 no. detached house (House Type B) & 2 no. semi detached houses ( House Type A) at site no's 20,21 & 22 The Drive to 3 no. detached houses (Type PBd)... login required. Details...
    1.9km 15/09/2021 N/A Templemichael , Arklow , Co. Wicklow a 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 32 hA, to include one single storey electrical substation building, electrical transformer/inv... login required. Details...
    1.3km 31/08/2021 N/A Avoca River Park , Arklow , Co. Wicklow Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. ... login required. Details...
    2.7km 18/08/2021 N/A Templemichael , Arklow , Co. Wicklow dwelling, waste water treatment system to EPA standards, garage and associated works... login required. Details...
    2.8km 05/08/2021 CONDITIONAL Seabank , Sea Road , Arklow single storey dwelling and domestic garage with a waste water treatment unit and percolation area to current EPA specifications, plus bored well, together with all associated site works... login required. Details...
    2.1km 14/07/2021 UNCONDITIONAL Killiniskyduff , Arklow , Co. Wicklow extend the appropriate period of 16/516 - 60 solar panels on the roof of a grain store... login required. Details...
    2km 11/06/2021 CONDITIONAL Sheepwalk , Arklow , Co. Wicklow the construction of a bungalow with garage, new vehicular entrance and driveway, new effluent treatment system to current EPA standards and all ancillary site works... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Ll
    • Description: Locally Important Aquifer - Bedrock which is Moderately Productive only in Local Zones

    Vulnerability:
    • Unit Name: Kilmacrea Formation
    • Description: Dark grey slate, minor pale sandstone
    • Labels: OCKILM / KA

    Bedrock:
    • High ( H)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...

Return to top...