2km |
06/05/2022 |
N/A |
Shower , Newport , Co. Tipperary |
ground floor extension, second floor attic development and window variations at ground and rear first floor levels of existing dwelling house... login required. |
Details... |
400m |
24/02/2022 |
REFUSED |
Ballymackeogh , Newport , Co. Tipperary |
demolish existing cottage onsite and replace with new dwelling house & garage, construct new vehicular entrance to the site and install a new waste water treatment system along with ancillary site works... login required. |
Details... |
1.2km |
24/02/2022 |
N/A |
lands adjacent to Bloomfield House , Foxhall , Newport Co.Tipperary |
the relocation of existing vehicular entrance, new 2 storey 4 bedroom detached dwelling house, car port, waste water treatment system, soil polishing filter and associated site works including renovation of walled garden previously part of Bloomfield House which is a protected structure... login required. |
Details... |
1.2km |
21/02/2022 |
N/A |
lands adjacent to Bloomfield House , Foxhall , Newport Co.Tipperary |
The relocation of existing vehicular entrance, new 2 storey 4 bedroom detached dwelling house, car port, waste water treatment system, soil polishing filter and associated site works including renovation of walled garden previously part of Bloomfield House which is a protected structure... login required. |
Details... |
2.1km |
30/12/2021 |
CONDITIONAL |
Lower Annagh , Lisnagry , Co. Limerick |
the construction of a single storey extension to the rear and side of existing dwelling house, dormer extension to the rear and all ancillary site works... login required. |
Details... |
2.2km |
10/12/2021 |
CONDITIONAL |
Ashroe , Murroe , Co. Limerick |
the construction of a storey and a half dwelling, entrance, treatment unit and associated site development works... login required. |
Details... |
1.3km |
03/12/2021 |
CONDITIONAL |
Rosssarymore , Newport , Co Tipperary |
garage building as constructed and the change of use of the garage to a home office... login required. |
Details... |
1.2km |
01/12/2021 |
REFUSED |
Ballymackeogh , Newport , Co Tipperary |
a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
2.6km |
08/11/2021 |
CONDITIONAL |
Waterpark , Lisnagry , Co. Limerick |
amendments to planning ref. no. 21/622 for a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance. The am... login required. |
Details... |
2.5km |
13/10/2021 |
CONDITIONAL |
Cappanahanagh , Moroe , Co. Limerick |
construction of a new two storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
2.5km |
13/10/2021 |
CONDITIONAL |
Cappanahanagh , Moroe , Co. Limerick |
construction of a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
1.3km |
23/09/2021 |
N/A |
Rossarymore , Newport , Co Tipperary |
for the conversion of garage building to a home office, and ancillary works... login required. |
Details... |
2.7km |
10/09/2021 |
CONDITIONAL |
Cappanahanagh , Murroe , Co. Limerick |
construction of a new slatted livestock house to incorporate easy feed and associated underground slurry storage tank with 4 external agitation points & ancillary external concrete & all associated ancillary site works... login required. |
Details... |
2.7km |
19/08/2021 |
CONDITIONAL |
Ballymackeogh , Newport , Co Tipperary |
to retain the following: (a) single storey extension to the rear of existing detached dwelling house, (b) converted garage to home office, (c) infill corridor link between dwelling house and c... login required. |
Details... |
2km |
16/07/2021 |
CONDITIONAL |
Arrabawn , 1st Floor Custom Gap Road/Jail Street , Tullow Newport Co. Tipperary |
change of use from office to fitness centre/gym... login required. |
Details... |
900m |
07/07/2021 |
CONDITIONAL |
Ballymacheogh , Newport , Co Tipperary |
private extension at the side of existing dwelling house, extension to include a new modern style living room... login required. |
Details... |
2.3km |
20/05/2021 |
CONDITIONAL |
Annagh , Lisnagry , Co. Limerick |
construction of a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
2.6km |
10/05/2021 |
CONDITIONAL |
Waterpark , Lisnagry , Co. Limerick |
construction of a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
2.1km |
08/04/2021 |
CONDITIONAL |
Tullow , Newport , Co. Tipperary |
two storey residence with separate garage/shed, treatment unit/percolation area, site entrance and associated site development works... login required. |
Details... |
2.1km |
19/03/2021 |
N/A |
Tullow , Newport , Co. Tipperary |
to construct a two storey residence with seperate garage/shed, treatment unit/percolation area, site entrance and associated site development works... login required. |
Details... |