320m |
14/04/2022 |
N/A |
Unit 101 Slaney Road Dublin Industrial Estate Dublin 11 D11 YR88 |
The proposed development will consist of amendments and additions to the existing building and site to provide for the use of the premises as a vehicular repair and service centre of 2121sq.m gross floor area and includes the following:-Amendments to the existing building (1808sqm) including revised internal layout to provide office, workshop, reception, a paint mixing room and staff areas 1844 sq.m. Amendments to all building elevations including refurbishment of existing brickwork and addition of cladding, reconfiguration and replacement of existing wi... login required. |
Details... |
500m |
07/04/2022 |
N/A |
29 Glasnevin Woods Dublin 11 |
Planning Permission to construct dormer window in attic storage area on rear elevation of roof with flat roof finish.... login required. |
Details... |
320m |
16/03/2022 |
APPLICATION DECLARED INVALID |
Unit 101 Slaney Road Dublin Industrial Estate Dublin11 D11 YR88. |
The proposed development will consist of amendments and additions to the existing building and site to provide for the use of the premises as a vehicle repair and service centre of 2121sq.m gross floor area and includes the following: -
Amendments to the existing building (1808sqm) including revised internal layout to provide office, workshop, reception, a paint mixing room and staff areas 1844sq.m.
Amendments to all building elevations including refurbishment of existing brickwork and addition of cladding, reconfiguration and replacement of existing windo... login required. |
Details... |
350m |
04/03/2022 |
REFUSE PERMISSION |
76 76G & 280 Bannow Road Cabra Dublin 7 |
The proposed development will consist of modifications to the previously permitted build to rent residential development (permitted under Reg. Ref. 3308/20; ABP Ref. 309366-21). The proposed modifications consist of the following : (a) the provision of a new set back penthouse level at fourth floor level to Block A consisting of 4 additional apartments (4 no. 2 bedroom units) with balconies to the south elevation. Block A shall now be a 5 storey building comprising of a total of 24 no apartments (3 no. 1 bedroom units and 21 no. 2 bedroom units), (b) the provision of 2 additional floors (fifth floor and sixth floor levels) to Block B consisting of 20 no. 1 bedroom units with balconies to the south and east elevations. Block B shall be a 7 storey building comprising of a total of 69 no. apartments (68 no. 1 bedroom units and 1 no. 2 bedroom unit) with communal open space at roof level., (c) modifications to courtyard level to provide an additional 16 no. bicycle parking spaces, (d) modifications at base... login required. |
Details... |
450m |
20/12/2021 |
GRANT PERMISSION |
416 Carnlough Road Dublin 7 |
Construction of a first floor extension (with 'velux' rooflights) over an existing rear single storey extension and for a single storey porch to the front of the house and all associated works.... login required. |
Details... |
450m |
12/11/2021 |
APPLICATION DECLARED INVALID |
416 Carnlough Road Cabra Dublin 7 D07 T0V5 |
Construction of a first floor extension (with 'velux' rooflights) over an existing rear single storey extension and for a single storey porch to the front of the house and all associated works.... login required. |
Details... |
450m |
27/08/2021 |
GRANT RETENTION PERMISSION |
374 Carnlough Road Cabra West Dublin 7 |
RETENTION for the retention of vehicular access to driveway from Carnlough Road. Retention permission to apply to associated site works, landscaping and dished concrete kerb to public path.... login required. |
Details... |
450m |
12/07/2021 |
APPLICATION DECLARED INVALID |
374 Carnlough Road Cabra West Dublin 7 |
RETENTION PERMISSION: Permission is sought for retention of vehicular access to driveway from Carnlough Road. Retention Permission to apply to associated site works, landscaping and dished concrete kerb to public path.... login required. |
Details... |
440m |
07/07/2021 |
GRANT PERMISSION |
213 Bannow Road Cabra Dublin 7 |
Planning permission for construction of a single storey extension and entrance canopy to the front, new vehicular entrance, gates and dished footpath to the front and all associated site works.... login required. |
Details... |
450m |
28/06/2021 |
APPLICATION DECLARED INVALID |
374 Carnlough Road Cabra West Dublin 7 |
Retention Permission for off-street parking as developed. Retention to apply to demolition of front walls, permitting full width access and associated site works.... login required. |
Details... |
450m |
29/04/2021 |
APPLICATION DECLARED INVALID |
374 Carnlough Road Cabra Dublin 7 |
The retention is for a vehicular entrance for vehicular access to the front garden and landscaping site work... login required. |
Details... |
400m |
12/04/2021 |
REFUSE PERMISSION |
283 Bannow Road Cabra Dublin 7 |
A single storey porch extension to front with brick pier and roof canopy over. Part single part double storey flat roof extension to rear and associated siteworks.... login required. |
Details... |
330m |
16/03/2021 |
GRANT PERMISSION |
Bus Stop No. 7672 Broombridge Luas Stop Broombridge Road Cabra Dublin 7 |
Permission to erect a 6.5m x 1.85m x 2.8m high stainless steel and glass bus shelter on the public footpath.... login required. |
Details... |
490m |
10/12/2020 |
GRANT PERMISSION |
1 - 4 Rivermount Cottages Ballyboggan Road Finglas Dublin 11 |
Permission for development at this 0.747 ha site. The development will consist of: the demolition of 4 no. existing dwellings and ancillary buildings known as Nos. 1-4 Rivermount Cottages (320m2) and the construction of a residential development arranged in 3 no. blocks (Block A, B and C) ranging from 4 to 5 no. storeys in height over basement/undercroft level (12,106.2m2, including basement). Blocks A and B incorporate a setback fifth storey. The maximum height of the development, taken from street level is 20.9m, including lift overrun. The development will comprise 99 no. residential units (47 no. 1-bedroom apartments, 50 no. 2-bedroom apartments and 2 no. 3-bedroom apartments); residential amenity areas comprising residents lounge and meeting rooms (296.4m2) and private, communal and public open space provision (including balconies and terraces to be provided on all elevations at all levels for each block). The development also consist of: amendments to the existing northern boundary wall; the provision of a new set-down area on Ballyboggan Road; the provision of 57 no. car parking spaces and 3 no. mot... login required. |
Details... |
410m |
20/11/2020 |
GRANT PERMISSION |
307 Bannow Road Cabra Dublin 7 D07 EC2W |
The development will consist of the following: A new vehicular entrance and driveway to the front onto Bannow Road and all associated siteworks, ancillary drainage and landscaping.... login required. |
Details... |
450m |
21/10/2020 |
APPLICATION DECLARED INVALID |
374 Carnlough Road Cabra Dublin 7 D07 K7R7 |
RETENTION: The retention is for a vehicular entrance for vehicular access to the front garden and landscaping site works.... login required. |
Details... |
370m |
20/10/2020 |
REFUSE RETENTION PERMISSION |
23 Glasnevin Court Glasnevin Dublin 11 |
RETENTION: Retention Permission for balcony at first floor level at rear with glazed screening and chrome handrail and fittings.... login required. |
Details... |
450m |
14/10/2020 |
APPLICATION DECLARED INVALID |
374 Carnlough Road Cabra Dublin 7 |
The retention of a vehicular entrance for vehicular access to front garden... login required. |
Details... |
230m |
05/10/2020 |
GRANT PERMISSION |
103A Barrow Road Dublin Industrial Estate Glasnevin Dublin 11 |
Signage associated with the use permitted under PA Ref: 2644/20 and all ancillary works associated with the installation of the signage.... login required. |
Details... |
440m |
04/09/2020 |
GRANT RETENTION PERMISSION |
400 Carnlough Road Cabra Dublin 7 |
RETENTION: Retention Permission at No. 400 Carnlough Road, Cabra, Dublin 7. The areas to be retained consist of the attic conversion with rear dormer along with alterations to front piers and gates. The works were carried out in 2013.... login required. |
Details... |