2.5km |
25/02/2022 |
CONDITIONAL |
Gortshane Middle , Newport , Co Tipperary |
an extension to farmyard consisting of a cattle shed with underground slurry storage tank... login required. |
Details... |
1.2km |
04/02/2022 |
CONDITIONAL |
Birdhill Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary |
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance ... login required. |
Details... |
1.2km |
28/01/2022 |
N/A |
Birdhill Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary |
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance ... login required. |
Details... |
2.5km |
26/01/2022 |
N/A |
Unit 4 Shannonside Business Park , Birdhill , Co. Tipperary |
previous administration and distribution facility consisting of partial change of use of ground floor level and extension of first floor level to provide additional offices, meeting rooms and laboratories, new access doors to t... login required. |
Details... |
2.5km |
20/01/2022 |
N/A |
Unit 4 Shannonside Business Park , Birdhill , Co Tipperary |
partial change of use of ground floor level and extension of first floor level to provide additional offices, meeting rooms and laboratories, new access doors to the rear and side elevations, new... login required. |
Details... |
1.2km |
20/01/2022 |
N/A |
Birdhill Service Area , Junction 7 (M7) , Lackanavea |
of the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works. (1.) The fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces. (2.) The compressed natural gas compound is a single storey development consisting of a compressor building (19sq.m), covered shelter (29sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance p... login required. |
Details... |
1.8km |
27/08/2021 |
N/A |
Gortybrigane , Birdhill , Co Tipperary |
construct a traditional style single storey dwelling house, onsite wastewater treatment system and site entrance, together with associated siteworks ... login required. |
Details... |
3km |
11/06/2021 |
N/A |
The Old Barracks , Birdhill , Co. Tipperary |
kitchen and store which are used as part of existing old barracks coffee bar, retention of garden seating area, permission for cycle and motorcycle parking spaces, accessi... login required. |
Details... |
3km |
10/06/2021 |
N/A |
The Old Barracks , Birdhill , Co. Tipperary |
kitchen and store which are used as part of existing old barracks coffee bar, retention of garden seating area, permission sought for cycle and motorcycle parking spaces, accessi... login required. |
Details... |
2.5km |
25/05/2021 |
CONDITIONAL |
Unit 3 , Shannonside Business Park , Birdhill |
development of existing administration and distribution facility operated by rehabilitation equipment provider Lyncare Ltd. comprising (i) partial change of use of ground floor level and extension of first floor level to provide rehabilitation centre (459sq.m) with direct links to existing warehousing and office accomodation (ii) provision of new external courtyard (4... login required. |
Details... |
2.5km |
17/05/2021 |
N/A |
Unit 3 Shannonside Business Park , Birdhill , Co. Tipperary |
development at existing administration and distribution facility operated by rehabilitation equipment provider Lyncare Ltd comprising (i) partial change of use of ground floor level and extension of first floor level to provide rehabilitation centre (459sq.m) with direct links to existing warehousing and office accomodation (ii) provision of new external courtyard (4... login required. |
Details... |
2.9km |
12/05/2021 |
CONDITIONAL |
Four Roads , Kilmastulla , Birdhill Co. Tipperary |
construction of private dwelling house and semi detached garage, entrance from the public road, waste water treatment system and ancillary site development works... login required. |
Details... |
2.8km |
29/04/2021 |
N/A |
Four Roads , Kilmastulla , Birdhill |
construction of a private dwelling house and semi detached garage, entrance from the public road, septic tank, percolation area and ancillary site development works... login required. |
Details... |
910m |
31/07/2020 |
CONDITIONAL |
Rossfinch , Ballinahinch , Birdhill |
a dwelling house, garage and entrance, install a treatment system and percolation area and carry out all ancillary site works... login required. |
Details... |
1.7km |
07/07/2020 |
CONDITIONAL |
Ballykinlalee , Ballinahinch , Co Tipperary |
construct two storey detached dwelling house, detached garage, entrance, boundary walls, wastewater treatment system, polishing filter and all associated site works... login required. |
Details... |
1.2km |
04/06/2020 |
CONDITIONAL |
Cappanakeady , Birdhill , Co Tipperary |
to erect a single storey extension to the rear (north elevation) and side (west elevation) of existing dwelling house, upgrade existing waste water treatment system, alter existing entrance at side of property for use as new main entrance including all ancillary site works and services... login required. |
Details... |
1.3km |
25/05/2020 |
N/A |
Cappanakeady , Birdhill , Co Tipperary |
a single storey rear extension to the rear and side of dwelling house, up grade waste water treatment system, alterations to site entrance at side of property for use as new main entrance and all associated site works... login required. |
Details... |
2.9km |
17/04/2020 |
CONDITIONAL |
Birdhill , Co. Tipperary |
to demolish existing dwelling house and shed and replace with a new dwelling house and garage, upgrade existing waste water treatement system and construct a new entrance along with all ancillary site works... login required. |
Details... |
1.3km |
30/01/2020 |
N/A |
Cappanakeady , Birdhill , Co Tipperary |
two storey and single storey rear extension, alteration to elevations of existing dwelling, new site entrance, garage, waste water treatment system and all associated site works... login required. |
Details... |
2.9km |
22/01/2020 |
N/A |
The Old Barracks , Birdhill , Co. Tipperary |
kitchen and store which are used as part of existing Old Barracks Coffee Bar, retention of garden seating area and PERMISSION for proposed new waste water line from Ki... login required. |
Details... |