1.8km |
27/04/2022 |
N/A |
Site at the townland of Collegeland, Baldonnell Business Park, Dublin 22 |
2 halo illuminated signs to the southern and northern elevations of Unit D and all associated works.... login required. |
Details... |
2.9km |
07/04/2022 |
N/A |
518B, Grants Crescent, Greenogue Business Park, Rathcoole, Co. Dublin |
Retention of existing building (159.25) currently not in use. Proposed use is intended as a recycling facility and this will be subject to a separate application.... login required. |
Details... |
2.9km |
29/03/2022 |
N/A |
In the townland of Boherboy, Saggart Road, Co Dublin |
Development to the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate while to the south is the Boherboy Road; The proposed application represents the development of the entire Boherboy Neighbourhood as identified in the Fortunestown Local Area Plan (2012) consisting of 655 dwellings, comprised of 257 two, three & four bed, two & three storey detached, semi-detached & terraced houses, 152 one, two & three bed duplex units in 17 two to three, three to four & four storey blocks, and 246 one, two & three bed apartments in 9 buildings ranging in height from two, two to five, four to five & five storeys, and a two storey crèche (693sq.m); Access to the development will by via one vehicular access point from the Boherboy Road, along with proposed upgrade works to Boherboy Road to include the provision of a roadside footpath along the front of the site at the Boherboy Road, continuing eastwards to the junction with the N81 Blessington Road (for an overall distance of c.370m); The proposed development also provides for pedestrian a... login required. |
Details... |
1.3km |
24/03/2022 |
SEEK CLARIFICATION OF ADDITIONAL INFO. |
Profile Park, Nangor Road, Clondalkin, Dublin 22 |
10 year permission for development consisting of removal of an existing unused waste water treatment facility on site and the erection of two data centre buildings, gas powered energy generation compound, and all other associated ancillary buildings and works; the two data centre buildings, DUB 15 and DUB 16, will comprise a total floor area of c. 33,577sq.m over two storeys; the first 2 storey data centre building (DUB15), located to the southwest of the site, will comprise 16,865sq.m data storage use, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; a second 2 storey data centre building (DUB16), located to the southeast of the site, will comprise 16,712sq.m data storage areas, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; both data centre buildings will reach a height of 20m; emergency genera... login required. |
Details... |
1.6km |
24/03/2022 |
N/A |
Westpark Crescent, Garters Lane, Saggart, Dublin 24 |
Change of use from existing short term tourist accommodation units to full apartment type living accommodation units consisting of 10 two bed ground floor units and 10 two bed duplex type units at first floor level (20 units in total); also, include small elevational changes to facilitate balcony extensions at first floor level and ... login required. |
Details... |
360m |
21/03/2022 |
N/A |
Kingswood Farm, Moneenalion Commons Lower, Clondalkin, Dublin 22 |
Relocation of the existing Clondalkin RFC grounds at Gordon Park to new lands at Kingswood Farm, Moneenalion Commons Lower Clondalkin and comprising of 4 new rugby playing pitches, including a high quality main competition pitch (with modern directional floodlighting comprising 18m high floodlighting columns either side) and a high quality Junior pitch both laid approximately level, and two back pitches as well as various grassed rugby training areas all laid on existing land cross fall levels; change of use of existing agricultural shed to accommodate new two storey changing facility and storage areas; a new two st... login required. |
Details... |
1.7km |
21/03/2022 |
N/A |
In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22 |
Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch... login required. |
Details... |
1.5km |
11/03/2022 |
SEEK CLARIFICATION OF ADDITIONAL INFO. |
Profile Park, Baldonnel, Dublin 22 |
Construction of a gas fired power plant with an electrical output of up to 125MW with associated balance of plant, equipment and buildings including; an Engine Hall building with a height of 18.9m, comprising 6 gas engines and ancillary infrastructure; an Electrical Annex Building with a height of 18.7m; a Workshop building with a height of 5. 1m; a Tank Farm building with a height of 5.68m; a Security hut with a height of 3.27m; an Exhaust Stack with a height of 31.8m; a Gas AGI including a kiosk with height of 3.3m; Radiator Coolers with a height of 8.46m; 2 electrical transformers with a height of ... login required. |
Details... |
1.1km |
01/03/2022 |
GRANT PERMISSION |
Brownsbarn, Citywest Campus, Dublin 24. |
Construction of 2 warehouses with ancillary office and staff facilities and associated development; Unit 1 will have a maximum height of 16.35 metres with a gross floor area of 8,156sq.m including a warehouse area (7,397sq.m), ancillary office areas (362sq.m) and staff facilities (397sq.m); Unit 2 will have a maximum height of 15.35 metres with a gross floor area of 5,990sq.m including a warehouse area (5,031sq.m), ancillary office areas (536sq.m) and staff facilities (423sq.m); vehicular access/egress routes to the subject site via the existing roundabout and access road; alteration to the existing access arrangem... login required. |
Details... |
1.8km |
25/02/2022 |
DECLARED NOT EXEMPT |
Townlands of Aungierstown & Ballybane, lying at the entrance of the existing facility in, Newcastle, Clondalkin, Dublin 22. |
Entrance upgrade comprising: (1) 3 heavy duty barriers & controls with 3 new smaller traffic arms and 3 road blockers; (2) Upgrade includes removal of existing island and construction of a smaller central island in a new position and all ancillary works in relation to the upgrade.... login required. |
Details... |
1.6km |
25/02/2022 |
GRANT PERMISSION |
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22 |
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and p... login required. |
Details... |
360m |
25/02/2022 |
INVALID APPLICATION |
Kingswood Farm, Moneenalion Commons Lower, Clondalkin, Dublin 22 |
Relocation of the existing Clondalkin RFC grounds at Gordon Park to new lands at Kingswood Farm, Moneenalion Commons Lower Clondalkin and comprising: 4 new rugby playing pitches, including a high quality main competition pitch (with modern directional floodlighting comprising 18m high floodlighting columns either side) and a high quality Junior pitch both laid approximately level, and two back pitches as well as various grassed rugby training areas all laid on existing land cross falls levels; change of use of existing agricultural shed to accommodate new two storey changing facility and storage areas; a new two storey C... login required. |
Details... |
1.9km |
03/02/2022 |
REFUSE PERMISSION |
Kilcarberry Business Park, Nangor Road, Clondalkin, Dublin 22 |
Widening of the site entrance to provide for a separate lane for the entrance and exit of cars to separate car traffic from heavy good vehicle traffic and associated works at Kilcarberry Business Park, Clondalkin, Dublin 22.... login required. |
Details... |
270m |
01/02/2022 |
GRANT PERMISSION |
Kingswood Business Park, Baldonnel, Dublin 22. |
Alterations to an existing granted planning application (previously granted permissions Reg. Ref. SD18A/0314 [ABP-304148-19], SD19A/0408, SD20A/0187); reconfiguration of the ground floor area consisting of a new ancillary storage area to the proposed building's eastern elevation measuring 75sq.m, at mezzanine level; change of use of 57sq.m of warehouse floor area to staff facilities due to the following, addition of single storey fire protected corridor from Office A to in the south-west corner of the warehouse, overall 45sq.m floor area addition; addition of stairs from warehouse to mezzanine level, overall 12sq.m floor area addition; elevation alterations, introduction of covered glazed structure at the main Office entrance to the front (southern) elevation, overall height 6.18m; introduction of Integrated Modular Louvre System to Charging Area to the front (southern) and side (eastern) elevation; change of colour of southern ... login required. |
Details... |
2.1km |
01/02/2022 |
GRANT PERMISSION |
Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22 |
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.... login required. |
Details... |
1.5km |
27/01/2022 |
REFUSE EXT. OF DURATION OF PERMISSION |
Blocks A, B and C, Clonlara Avenue, Baldonnel Business Park, Dublin 22 |
A new vehicular entrance and boundary fence to new display surface car parking, on 0.15ha of vacant land, located west of the existing car parking including a 6m high internally illuminated signage totem and tensile fabric canopy structures. Extension of existing workshop by 208sq.m located to the north of Block B and extension of 106sq.m for new vehicle preparation to the north of Block B and internal alterations including a trade... login required. |
Details... |
2.6km |
17/01/2022 |
REPORT RETURNED TO AN BORD PLEANALA |
Mill Road, Saggart, County Dublin |
Demolition of existing single storey dwelling and the construction of 274 units on a 4.62 ha (net) site (density 60 units per hectare). It will comprise of 51 houses, 38 duplex units and 185 apartments. The height of the proposed scheme will range from two storey houses and three storey duplexes to 5 storey and part 8 storey apartment blocks. The proposed residential mix will comprise of: 17 2-bed houses, 27 3-bed houses and 7 4-bed houses, 2 1-bed duplex, 17 2-bed duplex and 19 3-bed duplex units, 62 1-bed apartments, 119 2-bed apartments and 4 3-bed apartments. A 4-classroom crèche of c. 276 sq.m and 2 substations are also included in the proposed development. 276 car parking spaces and 634 bicycle spaces are provided. A planted woodland berm will be developed along the northern boundary with the N7 to provide a sound barrier and amenity open space. ... login required. |
Details... |
1.8km |
23/12/2021 |
GRANT PERMISSION |
Site at the townland of Collegeland, Baldonnell Business Park, Dublin 22 |
Plant and associated development for the permitted and under construction Unit D (Reg. Ref. SD19A/0370, Reg. SD20A/0215 and Reg. SD20A/0319; works to include 4 air handling units, 2 climate control condensers,... login required. |
Details... |
1.4km |
20/12/2021 |
N/A |
Corkagh Park, Clondalkin, Dublin 22 |
Enhancements and upgrades consisting of: Provision of wayfinding and signage installations; Enhancement of the primary and secondary routes; Construction of a new ‘hub zone’ to include a Café building with 10 no. public toilets, kitchen, storage, serving area and internal seating; multi-use events space with a stage and hard-standing area; soft-landscaping with formal seating areas; picnic areas; amenity lawn; mounds; incidental play area; and planting; Removal and replacement of trees that are in poor health or pose a risk to safety; Upgrading of St. John’s Wood Car Park to include resurfacing; improved pedestrian links and footpaths, dropped kerbs and crossings; replacement of existing gates; reorganisation of internal vehicular routes; 11m high arrival beacons at St. John’s Wood Car Park Entrance; future-proofing for EV charging points; Upgrading and extension of Green Isle Car Park and park entrance to include relocation and widening of existing entrance; addition of a native edge plant buffer; 11m high arrival beacons at Green Isle Car Park Entrance; future-proofing for EV charging points; Enhancements to the Fairy Woodland Trail including new play features; new seating; new pedestrian link from the lakes; retention and protection of existing mature trees; addition of native ornamental shrubs and grasses; Upgrading of entrance and construction of a new footpath linking existing car park to the Outer Ring Road; future-proofing for EV charging points and extension of car park; and 11m high arrival beacon at Outer Ring Road Entrance; Provision of a new pedestrian entrance from Kilcarbery Grange Development; Provision of a new pedestrian link between the Camac Valley Camping Park and Corkagh Park; Enhancements to pedestrian entrance and boundary at St. John’s Wood Drive; Proposed planting, furniture and landscape works associated with the proposed development; All associated and ancillary site works associated with the proposed development. The areas for the proposed w... login required. |
Details... |
730m |
17/12/2021 |
GRANT PERMISSION |
Wilsons Auctions, Green Isle Road, Corkagh, Clondalkin, Dublin 22 |
The continuance of use of the existing 3 buildings and all associated external areas for storage and warehousing of motor vehicles, plant, machinery and other durable products for the sale by public auction, all associated ancillary uses including support staff and office facilities and all associated site and development works comprising hard and soft landscaping areas, roads an... login required. |
Details... |