2.6km |
16/03/2022 |
CONDITIONAL |
Reagoulane , Holyford , Co Tipperary |
To construct dwelling house, garage, waste water treatment system & entrance along with all ancillary site works... login required. |
Details... |
1.6km |
07/12/2021 |
CONDITIONAL |
Tooreen , Hollyford , Co Tipperary |
construction of two new dwellings, with a shared entrance, two new garages, two new wells, two new waste-water treatment systems with polishing filters and all associated site works... login required. |
Details... |
2.7km |
02/09/2021 |
CONDITIONAL |
Cummer Beg Garracummer Birchgrove Moanvaun Curraghmarky & Cummermore , Hollyford , Co. Tipperary |
development at this site consisting of further continued use of two erected permanent 65m lattice meteoroloical masts previously granted under Planning Permission Ref 12/77 and extended under Planning Permission R... login required. |
Details... |
2.5km |
14/07/2021 |
CONDITIONAL |
Reagoulane , Hollyford , Co Tipperary |
construction of a dwelling extension, the construction of a new entrance, closing an existing entrance and all associated site works... login required. |
Details... |
2.7km |
07/07/2021 |
N/A |
Cummer Beg Garracummer Birchgrove , Moanvaune Curraghmarky & Cummermore , Hollyford |
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning Permission Ref. 12/77 and extended under Planning Permission Ref. 15600530 a... login required. |
Details... |
1.9km |
24/06/2021 |
N/A |
Foilycleary , Kilcommon , Thurles Co. Tipperary |
construction of a new longitudinal loading bay adjacent to the North Western side of the existing public road for temporary forest use, the longitudinal loading bay has been designed as per COFORD F... login required. |
Details... |
2.7km |
09/06/2021 |
N/A |
Cummer Beg Garracummer Birchgrove Moanvaune Curraghmarky and Cummermore , Hollyford , Co. Tipperary |
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning Permission Ref. 12/77 and extended under Planning Permission Ref. 15600530 ... login required. |
Details... |
230m |
14/01/2020 |
CONDITIONAL |
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford |
development consisting of the installation of battery arrays, located within container units (18 number units, each 30m2 by c.2.6m tall), a control building (c.160.5m2 by c.6.4m tall) and transformer (c.5m tall). The developm... login required. |
Details... |
200m |
25/11/2019 |
N/A |
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford |
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The developm... login required. |
Details... |
160m |
18/11/2019 |
N/A |
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford |
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The developm... login required. |
Details... |
2.6km |
31/07/2019 |
CONDITIONAL |
Piperhill , Hollyford , Co. Tipperary |
to construct a playground and AstroTurf pitch to include fixed playground equipment, seating, all perimeter fencing and gates, street lighting and to construct a memorial wall in the centre of the site and all associated site works... login required. |
Details... |