360m |
15/03/2022 |
N/A |
The Seabank House on the corner of East Road and East Wall Road Dublin 3 |
RETENTION: Planning retention permission for as built outdoor screens to seating area fronting East Wall Road, to front of existing licensed premises.... login required. |
Details... |
490m |
03/02/2022 |
GRANT PERMISSION |
8 Forth Road East Wall Dublin 3 |
The construction of a first floor extension over the existing single storey extension to the rear, conversion of existing attic space to study with a dormer window in the rear elevation roof plane and two roof lights in front elevation roof plane.... login required. |
Details... |
350m |
22/12/2021 |
GRANT PERMISSION |
125 East Wall Road Dublin 3 |
Permission for change of use of ground floor betting office to a two-bedroom apartment with railings to front delineating entrance.... login required. |
Details... |
190m |
29/07/2021 |
GRANT RETENTION PERMISSION |
7 & 8 Docklands Innovation Park 128-130 East Wall Road Dublin 3 D03 YN73 D03 E004 |
Retention planning permission for the development which it is proposed to retain is as follows:
new opening in party wall between Units 7 and 8 with associated access ramp in Unit 8 and amalgamation of Unit 7 and 8... login required. |
Details... |
130m |
27/07/2021 |
GRANT PERMISSION |
Dublin Port Alexandra Road Dublin 1 |
PROTECTED STRUCTURE: Permission for development at this site which extends from North Wall Quay Extension to the Tolka Estuary, to include the western boundary to Dublin Port and pavements along East Wall Road, across the Alexandra Road junction with East Wall Road, across the Tolka Quay Road junction with East Wall Road, Bond Road, across the Promenade Road junction with Bond Road and to end of Bond Road, Dublin Port, Dublin 1 & 3 and permission to amend development permitted under Reg. Ref. 3084/16.
The ESB substation (Record of Protected Structures No. 8771) is located within the subject site.
The proposed development will consist of construction of a new 1.4km pedestrian walkway and a 2-way cycle lane along East Wall Road and Bond Road from the River Liffey to the Tolka Estuary and will comprise the following:
• Removal of part of existing Dublin Port western boundary wall / fence;
• Removal of the existing access to Terminal 3 on East Wall Road;
• Modifications to layout of Terminal 3 along eastern boundary including removal of private car parking spaces;
• Relocation of 3 no. existing double billboards;
• Relocation of existing flagpoles,
• Relocation of existing temporary office building of 15sq.m;
• Closure of left turn from Alexandra Road to East Wall Road southbound;
• Removal of 17 no. car parking spaces from the Dublin Port Centre car park;
• Realignment of Bond Road north of the Promenade Road junction;
• Construction of new boundary along sections of the Dublin Port western boundary comprising railings over plinth or wall to a height of c. 4m along East Wall Road and Bond Road or for a section along Bond Road a wall of c. 2.6m in height;
• Creation of a civic space adjacent to the River Liffey at North Wall Quay Extension,
• Provision of 25 no. bicycle parking spaces,
• Provision of a Dublin Port Irish language installation as part of the boundary treatment adjacent the Crane 292 enclosure.
• Provision of hard and soft landscaping including trees along the extent of the route, amenity, interpretation and wayfinding featu... login required. |
Details... |
490m |
14/05/2021 |
GRANT PERMISSION |
ESB Gateway Car Park located at the Junction of East Wall Road and Forth Road East Wall Road Dublin 3. |
The development will consist of the continued use of a temporary surface car park to provide ancillary parking for ESB staff temporally located at the gateway building, East Wall Road, during the redevelopment of the ESB Networks headquarters offices for a period up to a maximum of five years. The... login required. |
Details... |
380m |
16/03/2021 |
GRANT PERMISSION |
Retail Units 1-3 (Centra) and Retail Units 4-5 Ground Floor Block 1 Island Key East Road Dublin 3 |
Planning permission for the development will consist of partial amalgamation of existing ground floor retail units 1-3 (Centra) and vacant ground floor retail units 4-5 for provision of an extension to the existing Centra Convenience Strore including all associated site development works.... login required. |
Details... |
390m |
16/03/2021 |
GRANT PERMISSION |
Retail Units 4-5 Ground Floor Block 1 Island Quay East Road Dublin 3. |
Planning permission for the development will consist of subdivision of existing ground floor retail unit and change of use from existing vacant commercial / retail use for provision... login required. |
Details... |
450m |
19/02/2021 |
GRANT PERMISSION |
Site of c. 0.5 ha which forms part of the Castleforbes Business Park Sheriff Street Upper Dublin 1. (D01 VX48). The site is bound by Sheriff St. Upper to the south CIE railyard to the north and east and Castleborbes Business Park to the west. |
Permission for development on a site of c.0.5 ha which forms part of the Castleforbes Business Park, Sheriff Street Upper, Dublin 1 (D01 VX48). The site is bound by Sheriff St. Upper to the south, CIE railyard to the north and east and Castleforbes Business Park to the west.
The development consists of revisions to permitted development of a hotel and office building under DCC Reg. Ref: 3433/19 , and as amended by 3197/20, comprising minor amendments. The development proposed comprises the following design modifications to the permitted office only:
• Increase in permitted floor area above ground from 10,803 sq.m to 12,545 sq.m with increase at each floor level. The building facade has extended along the north west, south east and west elevations.
• Introduction of basement of 578 sq.m to locate services functions inc. water storage tanks.
• Re-ordering of permitted building from 8 no. storeys with part mezzanine level at ground floor level to... login required. |
Details... |
490m |
29/01/2021 |
GRANT PERMISSION |
Eirfreeze Ltd Bond Road Alexander Quay Dublin 3 |
The development will consist of c.235kWp (c.11.60m2) of roof mounted solar PV panels and all associated works.... login required. |
Details... |
450m |
09/11/2020 |
GRANT PERMISSION |
68-72 East Road Dublin 3 |
The development will consist of the construction of a 106 bedroom hotel ranging in height from 1 to 8 storeys over basement. The hotel will comprise of 3 main blocks (4-8 storeys) which are connected at ground floor level. The hotel will accommodate:
• Reception/foyer, restaurant/café/bar, outdoor terrace, kitchen,... login required. |
Details... |
440m |
09/11/2020 |
GRANT PERMISSION |
Alexandra Place East Road Dublin 3 |
The proposed development will consist of the refurbishment and upward extension of the existing mixed-use building from 4-5 storeys to 6-7 storeys to accommodate a total of 131 no. residential apartments in 3 conjoined blocks A, B and C. The development provides for the demolition of 13 no. units at third and fourth floors and the provision of 71 no. units, resulting in a net gain of 58 no. units. The development also includes small infill extensions at ground floor and for the change of use of part of the ground and basement levels to accommodate a gymnasium and associated amenities.
The newly constructed units will comprise 17 no. studios, 29 no. 1-bedroom and 25 no. 2-bedroom units, all with private balconies. The overall mix of units in the development (existing and proposed) will be 17 no. studios, 36 no. 1-bedroom, 72 no. 2-bedroom units and 6 no. 3-bedroom units. The development will comprise:-
• Reconfiguration and partial change of use of existing basement to provide gymnasium space, 55 no. car parking spaces, bicycle parking, refuse stores and plant;
• Change of use of existing (vacant) commercial unit and part of permitted (vacant) crèche to accommodate ... login required. |
Details... |
450m |
13/08/2020 |
GRANT PERMISSION |
Site of c. 0.5 ha which forms part of the Castleforbes Business Park Sheriff Street Upper Dublin 1. (D01 VX48). The site is bound by Sheriff St. Upper to the south CIE railyard to the north and east and Castleborbes Business Part to the west. |
Permission for development on a site of c.0.5 ha which forms part of the Castleforbes Business Park, Sheriff Street Upper, Dublin 1 (D01 VX48). The site is bound by Sheriff St. Upper to the south, CIE railyard to the north and east and Castleforbes Business Park to the west. The development consists of revisions to permitted development of a hotel and office building under DCC Reg. Ref: 3433/19 comprising minor amendments. The development proposed comprises the following design modifications: 1. Minor reconfiguration of the permitted building footprints resulting in an overall increase in office floor space of 670 sq.m and hotel floor space of 393 sq.m. There is no increase in bedroom numbers for the permitted hotel or to any maximum permitted heights of either building. 2. Alterations to the permitted office to include: A new part mezzanine level in the permitted ground floor of 491 sq.m. Minor reconfiguration of the permitted layout of the ground floor plant and service areas, bike parking location and stair cores with subsequent amendments to the layout of the ground floor and upper floors. Rel... login required. |
Details... |
420m |
07/08/2020 |
GRANT PERMISSION |
Upper Mayor Street and 113-115 Sheriff Street Dublin 1 (Strategic Development Zone) |
Planning permission at this site consisting of a modification to condition no. 2 of reg. ref. DSDZ3044/19, specifically, an extension of time (1-year ) for the use of Block 5A (northern block) of Poin... login required. |
Details... |
170m |
08/05/2020 |
GRANT PERMISSION |
The former electricity substation building (a Protected Structure) at Alexandra Road And East Wall Road Dublin Port Dublin 1 |
PROTECTED STRUCTURE: The proposed development will consist of the change of use, renovation and extension of the existing two storey protected structure to provide a new distributed museum, exhibition and multi-functional space to be operated by Dublin Port Company. The development will include: stability improvement works to the protected structure comprising underpinning and rehabilitation works of existing masonry walls, piling works to a new ground floor slab, construction of additional internal structural steelwork, and removal of existing temporary shoring and bracing; removal of stairs and first floor mezzanine slab (60sqm) within the protected structure; provision of lighting to the exterior of the protected structure; excavation works within the protected structure to expose the historic sea wall running un... login required. |
Details... |
420m |
28/01/2020 |
GRANT PERMISSION |
Unit MSU3 First and Second Floor Point Village District Centre East Wall Road and Sheriff Street Upper Dublin 1 |
The development consists of the change of use Unit MSU3, which is located at first and second floor level, from previously permitted retail to leisure use. The total floorspace of the unit is 2,02... login required. |
Details... |
350m |
18/11/2019 |
GRANT PERMISSION |
Terminal 4 North Lands Dublin Port Dublin 1 bounded by Bond Road Tolka Quay Road & Promenade Road |
The proposed development will consist of the demolition of 10 no. redundant buildings (c. 6830sqm) and removal of temporary structures including portacabins and general site clearance (an existing substation and pump house will remain in situ) to optimise the use of the site as a multi-functional storage yard (primarily for heavy goods vehicles) and facilitate wider infrastructural upgrades to provide additional capacity within the Port. The proposed development will also include: construction of vehicular check-in booths (c. 30sqm); an open-air blockwork electrical enclosure; amendments to boundary treatments including provision of 4m high security fencing (including 1.5m high retaining walls) on the n... login required. |
Details... |
340m |
15/11/2019 |
GRANT PERMISSION |
Londis Retail Unit 5b East Road Dublin 3 |
Provision of Off Licence (7sqm) subsidiary to the main retail use.... login required. |
Details... |
230m |
30/10/2019 |
GRANT RETENTION PERMISSION |
Docklands Innovation Park 128-130 East Wall Road Dublin 3 |
RETENTION: Retention planning permission of the existing uses of Units 2, 7, 9, 13, 14, 15, 17 and 19 at the Docklands Innovation Park, 128-130 East Wall Road, Dublin 3. The proposed development seeks retention of the existing uses on site as follows:
Unit 2 and 7: Cultural/Recreational use (Dance Studio)
Unit 9:... login required. |
Details... |
340m |
02/10/2019 |
APPLICATION DECLARED INVALID |
Londis Retail Unit 5B East Road Dublin 3 |
Planning permission sought for provision of off-licence (7sqm), subsidiary to the main retail use at Londis Retail Unit, 5b East Road, Dublin 3, D03 K799.... login required. |
Details... |